Raise Production — Shareholder Meeting (August 2013)
17 slides from Raise Production's shareholder meeting presentation, Aug 27, 2013
Slide 1: Annual General Meeting August 27, 2013
RAISE PRODUCTION? Annual General Meeting August 27, 2013
Slide 2: Forward-looking statements disclaimer
This written and accompanying oral presentation is being supplied to you solely for your information and may not be reproduced or forwarded to any other person, or published (in whole or in part) for any other purpose. This written and accompanying oral presentation contains certain forward-looking
Slide 3: Capitalization and trading volume
Symbol: RPC $1.00 1,400,000 $0.90 Volume RPC Price Exchange TSX-V $0.80 1,200,000 $0.70 1,000,000 Trading Volume Share Price $0.60 Capitalization(1): 800,000 $0.50 Shares: 59.4 mm $0.40 600,000 Options (2): 8.5 mm $0.30 400,000 Warrants (3): 22.6 mm $0.20 200,000 $0.10 Broker Warrants (4): 1.6 mm $-
Slide 4: Horizontal drilling and multi-stage fracing creating a boom in new oil & gas drilling
• Horizontal drilling and Multi-Stage Fracing (“MSF”) technologies are creating a boom in new oil & gas drilling • Significant existing Horizontal and MSF oil well inventory (1): + 6,000 in Canada + 11,000 in U.S.A • Continued growth forecast: + 26,000 Horizontal and MSF liquids wells in USA to hold
Slide 5: Oil & gas industry driven by technological innovation
• Oil & gas industry driven by technological innovation • Vertical technologies well developed across all major stages of well life • Horizontal technologies still developing: – MSF created new playing field, but there is no established artificial lift system to enhance well life and production rate
Slide 6: Significant variability in initial well characteristics, similar decline
• Significant variability in initial well characteristics: – Sandstones, Shales and Carbonates – Completion technologies – Lateral lengths – Reservoir characteristics • Yields significant variability in initial production... • But, surprising Type Well Profile similarity in decline Reserves IP Rate
Slide 7: Horizontal/MSF wells experience significant decline rates in first two years
• Horizontal /MSF wells experience significant decline rates during the first two years of operation • Raise Production believes the lack of flow management in the horizontal section of the well is a significant contributor to steep declines: – One point of draw down across multiple fracs leading to
Slide 8: Raise's production management system addresses the horizontal wellbore section
• Raise’s production management system is designed to specifically address the horizontal section of wellbore: • Compliments existing vertical lift – Does not replace vertical lift – Focuses on the horizontal flow only (segments the wellbore) – Low horsepower system because no need to “lift” oil to
Slide 9: Fit for purpose approach to system design
• Fit for Purpose approach to System design • Multiple pumps aligned in series firing in parallel Simple mechanical system Low horse power Closed loop inert gas activated 4 moving parts per pump Pneumatic positive displacement • Pumps oil, water or gas • Utilizes current industry infrastructure Join
Slide 10: Raise has spent 2½ years developing the system
• Raise has spent 2 ½ years and considerable effort developing the system to date: – Conceptual design – Industry focus groups – External consultant conducted concept and design audit – Detailed design – Material selection and component testing – Accelerated life testing (+2 years effective time) of
Slide 11: Deployment of prototype system near Kindersley, SK
• Deployment of Proto-Type System near Kindersley, SK during the week of Aug. 12, 2013 11
Slide 12: Three major performance criteria
• Three major performance criteria, in order of descending importance: 1. Deployment • Service rig • 4 ½ inch casing • Around the corner (Build section) • Pump placement 2. Functionality • Surface unit activation • Pump activation and cycling 3. Production • 60 day test period • Stabilize & clean up
Slide 13: Prototype system versus commercial unit
• Important to understand the current deployment is a proto-type System and not a commercial unit • This deployment is still a part of Raise’s System design and testing process • Following adequate testing, Raise will move to a commercial System originally designed for shallow Viking reservoirs • Co
Slide 14: Field testing and commercialization plan
• In Field Testing 2013 & 1H 2014 – 60 day on current Proto-Type – 2 additional deployments of expanded Systems • Requires industry partner approval • 4 pump systems & single activation • Commercialize Viking 2H 2014 – Finalize design, manufacture and operating procedures – Manufacturing: • QA & QC
Slide 15: Last 12 months accomplishments and next 12 months goals
• Last 12 months accomplishments: – Strategy • Strategy for developing and commercializing Horizontal Production Management System – People • Important new hires – Financing • Completed 2 successful financings of $3.5mm and $2mm to support R&D – Relationships • E&P industry partner and key oilfield
Slide 16: 16
16
Slide 17: Contact details
2620, 58th Ave SE Calgary, AB T2C 1G5 403-699-7675 raiseproduction.com Scott Riddell, VP Business Development Eric Laing, CEO Susan Scullion, CFO sriddell@raiseproduction.com elaing@raiseproduction.com sscullion@raiseproduction.com 17