Slide 1: Condition Based Maintenance – Wärtsilä Services
A yee ombera d of Service WARTSILA i)
Slide 2: Our customers have their own business to take care of
= Our customer have their own business to take care of = Their businesses need our energy products = If our products fail to perform, our Customers’ businesses are at stake m™ Everything needs to be done so the reliability is secured = Condition Based Maintenance (CBM) is a safety net that takes car
Slide 3: Scheduled Maintenance vs CBM
wear limit lifetime time work risk savings time Scheduled Maintenance is a CBM alerts you when CBM helps you keep an eye on seamless method to plan a premature failure your planning according to actual your maintenance activities is about to occur. It warns performance records. It helps you at an ea
Slide 4: CBM monitors the equipment conditions, continuously analyses operating data
On-site and on-line troubleshooting capture and analyse operational data. CBM monitors the equipment conditions, continuously analyses operating data, and calculates the optimal performance parameters by diagnosing and predicting the future * condition of the equipment.
Slide 5: Operational Data, Centralized datacenter, Expert Analysis
Operational Data Frequent reporting Centralized datacenter Customer Information Expert Analysis Customer Follow-up Remote Access Any installation Worldwide
Slide 6: Fleet services and global network
3 rt em ibe Voice # available on all Fleet services inside the Global bearns Se 15.5" AOR-E Tei: 371 The 581 =e % 3 2 g ae Cc WARTSILA
Slide 7: Engines in CBM Report and CBM Expert
! Axel Maersk 1x12RTA96C + 3x8L32 + 1x6L32CR Deepwater Pathfinder 3x18V32, 3x12V32 253 Engines in CBM Report, 141 Marine, 112 Power Plant 500 Engines in CBM Expert, 400 Marine, 105 Power Plant Plains End, USA 20x18V34SG Stolt Innovation (Stolt Nielsen) 3x9R32, 1x6R32 Lufussa, Honduras 16 x Wärtsilä
Slide 8: Pavana III, Honduras: connection type
" # $ ! % ! Connection type A continuous connection to this power plant is enable through secured remote access. Parameters can be followed in Live. Pavana III, Honduras Type: Oil power plant Location: Pavana, Honduras Engines: 16 x Wärtsilä 18V46 Lufussa, Honduras Total electrical output: 267.4 MW
Slide 9: Pavana III, Honduras
Pavana III, Honduras Type: Oil power plant Location: Pavana, Honduras Engines: 16 x Wärtsilä 18V46 Total electrical output: 267.4 MW
Slide 10: Royal Caribbean Cruise Lines: connection type
" # $ ! & ! ' Connection type Data are sent from the vessel to Wärtsilä on a daily basis. Parameters are stored and can be accessed remotely whenever needed. Royal Caribbean Cruise Lines Type: Passenger Vessel Location: Caribbean, USA Engines: 6 x Wärtsilä 12V46 Total power: 75.6 MW
Slide 11: Royal Caribbean Cruise Lines
Royal Caribbean Cruise Lines Type: Passenger Vessel Location: Caribbean, USA Engines: 6 x Wärtsilä 12V46 Total power: 75.6 MW
Slide 12: CBM Reports are generated based on Customer's specifications
( & CBM Reports are generated based on Customer’s specifications + * , ) $ ! $ * $ $ ! , ) + $ - . ) $ " ) # ,' " , " # , + * , & - , '
Slide 13: Operating costs with CBM
" - Operating costs # / 0 1 2 0 1 CBM savings # CBM cost # ) # ) ! 3 0 1 4 0 1 # # Present with CBM
Slide 14: Service offering 1995 to 2005
% ! " !! ' Spare Parts & Tools O&M Support Performance optimizers Environmental solutions 1995 Training Safety & Reliability 2005
Slide 15: Wärtsilä