Manuka Resources Ltd · ASX:MKR

Manuka Resources — Investor Presentation (October 2020)

23 slides from Manuka Resources's investor presentation, October 2020

  1. Slide 1: A Precious (Metals) Opportunity

    A Precious (Metals) Opportunity October 2020

  2. Slide 2: Disclaimer

    Disclaimer This disclaimer applies to this presentation and the information contained in it (the Presentation). By reading this No guarantee, representation or warranty disclaimer you agree to be bound by it. The Presentation has been prepared by Manuka Resources Limited and While reasonable care ha

  3. Slide 3: Key points

    Key points Australian domiciled gold and silver producer, located in the Cobar Basin, central west NSW Generating cash from restart of mining operations • Gold production from Mount Boppy gold mine • Processing silver stockpile at Wonawinta silver mine • Planned restart of Wonawinta silver mining Ha

  4. Slide 4: Key points (continued)

    Key points (continued) Other infrastructure includes airstrip, power and water, tailings storage facility • 1 mining lease, 7 exploration leases, tenement package covering total of 920km2 100% owner of Mt Boppy gold project which includes: • Open pit mine (previous production circa 500,000oz Au @ ci

  5. Slide 5: The journey - so far (but we've only just begun!)

    The journey - so far (but we’ve only just begun!) April 2020 October 2020 Restarted Wonawinta in-fill Wonawinta plant drilling program nearing completion August 2020 June 2019 February to April June 2020 Initial drill Manuka completed August to December 2019 2020 Satisfied ASX results Mt Boppy the p

  6. Slide 6: The Prolific Cobar Basin

    The Prolific Cobar Basin Ground holdings in the Cobar Basin Endeavor (Elura) CSA Mount Boppy Peak Manuka Operating mines Peel Mining Aurelia Metals Anchor Resources Hera - Nymagee Toho Zinc Wonawinta Glencore Sandfire Resources* Exploration license applications lodged, not yet granted. Source: S&P G

  7. Slide 7: Building shareholder value − four avenues

    Building shareholder value − four avenues Stage 1 Stage 2 Stage 3 Stage 4 CY Q2 2020 – Q2 2021 CY Q3 2021 – 2026 CY Q4 2020 onwards CY Q4 2020 onwards Mount Boppy Wonawinta Mt Boppy Wonawinta Gold production Silver production Exploration program Sulphide exploration program • Commenced treatment at

  8. Slide 8: Four revenue streams

    Four revenue streams Mt Boppy gold production Wonawinta silver production Mt Boppy mk II Wonawinta Ag/Pb/Zn Q2 2020 – Q2 2021 Q3 2021 – 2026 Q4 2020 onwards Q4 2020 onwards • Gold production – mining existing • Silver production – processing silver • Additional gold discovery – • Ag/Pb/Zn confirmati

  9. Slide 9: Mount Boppy & the Canbelego-Mineral Hill trend

    Mount Boppy & the Canbelego-Mineral Hill trend Manuka Resources Presentation | Confidential October 2020 9

  10. Slide 10: Mount Boppy – regional setting

    Mount Boppy – regional setting Mt Boppy is hosted within Devonian-age Regional Geology sedimentary and volcanic rocks of the Canbelego-Mineral Hill Rift Zone on the Kopyje Shelf. The Kopyje Shelf geology includes shallow-water siliciclastic sediments and limestone deposited inside the Canbelego-Mine

  11. Slide 11: Mount Boppy – an exciting neighbourhood

    Mount Boppy – an exciting neighbourhood The Boppy South prospect (south of the Mt Boppy Gold Mine) has a resource of circa 9,000 oz Key Prospective Targets –headline historical numbers demand further exploration, currently being planned Birthday Prospect Canbelego King Reid Rankin Historical Histori

  12. Slide 12: Mt Boppy – existing pit and block model

    Mt Boppy – existing pit and block model Manuka Resources Presentation | Confidential October 2020 12

  13. Slide 13: Mt Boppy – recent in-pit exploration

    Mt Boppy – recent in-pit exploration Details of drill hole intercepts for reported results. Intersection Drilled Depth Depth From Depth To Interval Au grade Drill hole ID (m) (m) (m) (m) (g/t) MBRC016 183 158 173 15 3.33 Including 158 168 10 4.05 non-stope fill MBRC017 195 166 186 20 5.89 Including

  14. Slide 14: Mt Boppy – recent in-pit exploration

    Mt Boppy – recent in-pit exploration Cross section through Mount Boppy drill hole MBRC016 looking Cross section north through Mount Boppy drill hole MBGC0042 looking north Cross section through Mount Boppy drill hole MBRC017 looking Cross section north through Mount Boppy drill hole MBGC0043 looking

  15. Slide 15: Wonawinta (Silver)

    Wonawinta (Silver) Manuka Resources Presentation | Confidential October 2020 15

  16. Slide 16: Wonawinta – regional geology

    Wonawinta – regional geology The Manuka project lies on the western margin of the Cobar Basin within a tectono-stratigraphic unit known as the Winduck Shelf that bridges with the eastern border of the Darling Basin Stratigraphy in the local area comprises early Devonian shallow water sediments of th

  17. Slide 17: Wonawinta – resources and reserves

    Wonawinta – resources and reserves CCR 21 February 2014 mineral resource and ore reserve estimate Resource categories of the Wonawinta silver deposit (>20g/t Ag) Grade Contained Metal Material Ag Pb Ag Pb Tonnes Ag Pb Ag Pb Resource Category Mt g/t % Moz kt Classification Mt g/t % Moz ‘000t Measured

  18. Slide 18: Capital Structure & Use of Funds

    Capital Structure & Use of Funds Manuka Resources Presentation | Confidential October 2020 18

  19. Slide 19: Capital structure

    Capital structure Capital structure as at 30 September 2020 Shares (m) % Post IPO Escrowed Shares Escrowed shares 176.8 71% Free float 72.5 29% Total fully diluted shares on issue 249.35 100% Manuka management controlled 91.78 36.8% 29% Options (A$0.25 strike price) 3 year maturity 21.25 71% As at 3

  20. Slide 20: Appendix

    Appendix Manuka Resources Presentation | Confidential October 2020 20

  21. Slide 21: Board and key management

    Board and key management Dennis Karp Nick Lindsay Anthony McPaul Haydn Lynch David Power Executive Non-Executive Non-Executive Chief Operating Operations Chairman Director Director Officer Manager Mr Karp commenced his career in the Dr Nick Lindsay is an experienced mining Mr Anthony McPaul is a sen

  22. Slide 22: Wonawinta – resource & exploration upside

    Wonawinta – resource & exploration upside Mineral Resource Estimate at Wonawinta was updated in accordance with the JORC Code (2012) by Mining Associates Pty Ltd in 2016, and subsequently verified by SRK Consulting. Wonawinta Mineral Silver Estimate, cut-off 20 g/t Ag Resource Category Material (Mt)

  23. Slide 23: Wonawinta – grade / tonnage curve

    Wonawinta – grade / tonnage curve Manuka will be mining ore at economic cut-off grades Mining Scenarios • @ cut-off grade 22g/t (global) • 40 Mt @ 42 g/t Ag (52 Moz Ag) • @ cut-off grade 45g/t (global) • 10 Mt @ 70 g/t Ag (22 Moz Ag) • @ cut-off grade 70g/t (global) • 4.5 Mt @ 97 g/t Ag (14 Moz Ag)