Products Pipelines Assets PRODUCTS PIPELINES PRODUCTS PIPELINES TERMINALS Cochin TRANSMIX FACILITIES PIPELINES UNDER CONSTRUCTION CONDENSATE PROCESSING FACILITY Pacific (2) INDICATES NUMBER OF FACILITIES IN AREA WCT Northern 2 2 Miles of Pipe ~ 8,400 CALNEV 2 4 Terminals – 55 3 2 2 Pacific Tank Capa
Slide 3: Financial Overview
Financial Overview (a) ($ in millions) 2009 2010 2011 2012B Segment EBDA 635.1 $687.5 $694.5 $734.4 Sustaining Capex (b) (42.5) (41.0) (45.8) (46.7) DCF $592.6 $646.5 $648.7 $687.7 Compound Annual Growth Rate of DCF = 5.1% __________________________ (a) Excludes Certain Items (b) Does not include co
Slide 4: 2011 Volumes / Markets
2011 Volumes / Markets Total refined product pipeline volumes down slightly, 0.1% vs. 2010 Gasoline (including CFPL ethanol) down 1.4%, diesel up 0.4%, jet fuel up 4.1% West Coast — Pacific down 0.7% • Arizona down 1.9%, Northern CA up 1.6% and Southern CA down 5.5% • Military up 17.2% — CALNEV
Slide 5: Expanding to Meet Customer Demand
Expanding to Meet Customer Demand Recently Completed Projects Project Description In Service Cost ($MM) West Travis AFB Pipeline and Tanks Construct three 150Mbbl tanks and 1.6 miles of pipeline two tanks in-service December 2011’, final tank to be December 2011 $47.5 completed March 2012) Carson Te
Slide 6: Historical Demand and 2012-13 EIA Outlook
Historical Demand and 2012-13 EIA Outlook U.S. Product Consumption EIA Demand Outlook MMBbl/d 2011 2012E 2013E 10 Mogas -2.7% -0.2% -0.2% 9 8 Distillate 1.4% 1.9% 2.1% 7 Jet Fuel 0.0% 0.5% 0.3% 6 Total -1.3% 0.4% 0.5% 5 4 KM Refined Product Pipelines (MMBbls) 3 2 2011 2012B % chg 1 Pacific CALNEV 46
Slide 7: Historical FERC Tariff Index Regime
Historical FERC Tariff Index Regime Applicable to interstate volumes on SFPP, CALNEV, Plantation, Cochin (U.S.), and Central Florida PPI FG + 1.3% PPI FG + 2.65%(a) 2006 – 2010 2011 – 2015 $1.50 $1.45 8.68% (b) $1.40 $1.35 Growth of $1 6.88% $1.30 7.60% -1.30% $1.25 $1.20 5.17% $1.15 4.32% $1.10 6.1
Slide 8: Refined Products Revenues
Refined Products Revenues (a) $MM $1,000 Compound Annual Growth Rate = 4.2% $800 $600 $400 $200 $- 2007 2008 2009 2010 2011 2012B Terminals Interstate Intrastate __________________________ (a) Products Segment, excludes Cochin, Cypress and KMCC 8
Slide 9: Biofuels: Opportunities Amidst Challenges
Biofuels: Opportunities Amidst Challenges Opportunities — Federal mandate requires use of biofuels — First mid-level blends (E11 – E15) anticipated late Products Pipelines Biofuel 2012 Volumes Handled (MMBbls) — Unit trains and pipeline transportation of ethanol 2009 2010 2011 2012B improves distr
Slide 10: NGL Assets – Cochin and Cypress
NGL Assets – Cochin and Cypress Combined, represent $61.5MM income before DD&A, or 8.4% of 2012 segment plan Cochin — 1,900-mile pipeline serving 5 propane terminals and petrochemical complex (ExxonMobil, BP, Nova) in Sarnia / Corunna, Ontario — 2011 propane volume up 32.7% and revenue up 50.0% fr
Slide 11: Kinder Morgan Crude & Condensate
Kinder Morgan Crude & Condensate Strategic Value Pipeline to move product from Eagle Ford Shale to Houston Ship Channel Optimize existing asset base Expands KM liquids footprint Pipeline Specifications Construct 62 miles of new pipe and convert 109 miles of existing gas pipelines Capacity
Slide 12: Kinder Morgan Condensate Processing Facility
Kinder Morgan Condensate Processing Facility Strategic Value Supports volume demand for KMCC Will provide unparalleled connectivity to refining, petchem, pipeline and marine facilities Facility Specifications $130 Million Project Initial throughput commitment of 25 MBbl/d Design provides f
Slide 13: Parkway Project
Parkway Project Strategic Value Provides Plantation Pipe Line with additional supply optionality Increase pipeline supply feeding KM Southeast Terminals Provides additional pipeline capacity to meet Northeast demand needs in light of recent and pending refinery shutdowns Pipeline Specification
Slide 14: Expanding to Meet Customer Demand
Expanding to Meet Customer Demand Near-Term Projects Project Description In-service Cost ($MM) West Carson Terminal Provide marine access post-2013 termination of 2013 $ 17.4 existing Los Angeles harbor terminal lease Biodiesel Blending Provide receipt, storage and blending capabilities July 2012 16
Slide 15: CPUC Rate Case Update
CPUC Rate Case Update Consolidation of multiple dockets dating from 1997-2008 Original ALJ proposed decision (“Long” decision) eliminated income tax allowance — Alternate proposed decision, by Commissioner Simon, restored full income tax allowance, but later rejected by full Commission in it’s r
Slide 16: FERC Rate Case Updates
FERC Rate Case Updates Resolved historical dockets (1992-2008) — All parties settled in 2010 — FERC approved non-contested settlement in March 2011 Two remaining West Line / East Line cases — West Line Opinion 511: Commission vigorously defended its income tax allowance (ITA) policy including im
Slide 17: Summary Highlights
Summary Highlights Modest volume growth coupled with positive, recently approved FERC Index Terminal revenues enjoy continued growth from expansion projects, biofuel mandates and “tuck-in” acquisitions Slate of expansion projects will move the needle — Crude/Condensate shale plays (Eagle Ford
Slide 18: Kinder Morgan
KINDER/MORGAN
Kinder Morgan — Kinder Morgan 2012 Analyst Conference on 6ix