Slide 1: ATCO Barlow Battery Energy Storage System Project
ATCO Barlow Battery Energy Storage System Project Thursday February 8, 2024 Virtual Information Session
Slide 2: Welcome
WELCOME We are here to provide detailed information about the proposed project, gather feedback, and to answer your questions. Team members: ATCO: TERIC: • Chris Teare • Dave Carscadden • Medina Hansen • Steve Schmidt • Julia Chavez • Michael McLoughlin • Jodi MacMillan House-keeping: • Keep your mi
Slide 3: Land Acknowledgement
LAND ACKNOWLEDGEMENT We acknowledge the traditional and ancestral territory of the Blackfoot Confederacy, comprised of the Siksika, Kainai, and Piikani Nations; the Tsuut'ina Nation; and the Stoney Nakoda, including the Chiniki, Bearspaw, and Goodstoney First Nations. The City of Calgary is also hom
Slide 4: Agenda
AGENDA Introduction Project Details Project Information Q&A Closing & Contacts
Slide 5: Introduction
INTRODUCTION • ATCO has a long history of business in Alberta and worldwide. • ATCO provides integrated energy, housing, transportation and infrastructure solutions with diverse products and services across many industries. • 19,000 people employed, supporting assets of $24 Billion. • EnPower is ATC
Slide 6: Project Overview
PROJECT OVERVIEW Owner: ATCO EnPower Project Name: ATCO Barlow BESS Location: Southeast Calgary, Alberta LSD: SE 16-23-29 W4M Rated 21.5 MW/86 MWh Energy/Power: Technology: Lithium-ion Cells Approximate 0.5 Hectares Footprint: Interconnection: Connection lines to Solar Park transformers Conceptual a
Slide 7: About Batteries
ABOUT BATTERIES • The project will use Lithium-Ion (Li-Ion) Battery Technology. • Li-Ion is the dominant battery technology for projects of this size. • The technology is safe, reliable and proven technology used around the world for the efficient storage of electricity. • Globally there are tens of
Slide 8: Site Location
SITE LOCATION • The Battery storage project will be built on the existing Barlow Solar Project site • Located on Barlow Trail SE & 114 Street SE (closest intersection) Project Size & Location
Slide 9: Project Benefits
PROJECT BENEFITS Why build this project? • The ATCO Barlow BESS Project will improve reliability for the Alberta electrical grid. • Reliable and low-cost electricity is important to all Albertans – BESS projects can enable this by providing grid reliability services and timeshifting of power from lo
Slide 10: Community Benefits
COMMUNITY BENEFITS Employment • During Development – individuals will be required to develop and progress the project through engineering/procurement and regulatory. • During Construction - Construction jobs for electricians, equipment operators, laborer's, specialized trades, site managers and engi
Slide 11: Environmental
ENVIRONMENTAL • The Project is located on previously disturbed industrial land within the Barlow Solar Park site. • BESS will be located on the existing gravel pad. • No sensitive wildlife features were identified within or adjacent to the Project. • Project has consulted with Alberta Environment an
Slide 12: Regulatory Approvals
REGULATORY APPROVALS Alberta Utilities Commission (AUC) • The project will apply to the AUC under Rule 007, which requires: • Following an established and robust stakeholder engagement process • Site specific emergency response plan • Noise Impact assessment • Environmental evaluation • Recycling pl
Slide 13: Stakeholder Engagement
STAKEHOLDER ENGAGEMENT • Stakeholders • ATCO has identified landowners, industry, municipalities, and others as project stakeholders and has engaged with them directly to seek any feedback or concerns they may have. • Traffic • During construction, the site will receive semi-truck sized loads to bri
Slide 14: Safety & Emergency Response
SAFETY & EMERGENCY RESPONSE Safety • Safety is the first consideration in everything ATCO does. • Batteries are inherently safe. • Battery systems are designed to reduce the possibility of fires and other safety risks. • ATCO will prioritize safety considerations to lead all key decisions when selec
Slide 15: Project Lifecycle
PROJECT LIFECYCLE • The Project is expected to be operational for 20 years with the original batteries. • During the Project lifecycle, the equipment may be refurbished, including replacing/upgrading of components. • ATCO will ensure decommissioning and reclamation activities are carried out in comp
Slide 16: Preliminary Project Schedule
PRELIMINARY PROJECT SCHEDULE August 2023 February 2024 Q3 2024 Q4 2025 ATCO Begins Public Anticipated Operations Development Information AUC Approval Commence Session *We are here November 2023 December 2023 Q2 2024 Q3 2025 Stakeholder Engineering AUC Construction Engagement Begins Amendment Begins
Slide 17: Questions?
Questions? Please ask questions using the chat or raising your hand
Slide 18: Thank You!
THANK YOU! This now concludes our session Presentation will be posted on the ATCO Website For further information, please contact: Medina Hansen Dave Carscadden Regulatory Advisor Development Manager 403-305-8659 403-497-6260 medina.hansen@atco.com dave.carscadden@tericpower.com ATCO.com/EnPower TER