Patagonia Gold Corp · TSXV:PGDC
Patagonia Gold — Investor Presentation (October 2013)
21 slides from Patagonia Gold's investor presentation, October 2013
Slide 1: Investor Presentation October 2013
INVESTOR PRESENTATION October 2013 AIM:PGD
Slide 2: Important Notice
IMPORTANT NOTICE The information contained in these slides has been prepared by Patagonia Gold plc ("the Company"). The information in these slides is subject to updating, completion, revision, further verification and amendment without notice. These slides have not been approved by the United Kingd
Slide 3: Patagonia Gold Plc
Patagonia Gold Plc Patagonia Gold Plc is a producing mining and Exploration company with its primary objective to increase shareholder value through the acquisition, exploration and development of gold and silver projects in the Deseado Massif region of Argentina 3
Slide 4: Investment Highlights
Investment Highlights Production commenced, ramp up almost complete, self sufficiency Strategic Partnership with Fomicruz the provincially owned mining company and a partner of Patagonia Gold on certain properties Geological Prospectivity & Significant Land Holdings of 350,000 ha in the Deseado Mass
Slide 5: Santa Cruz Province
Santa Cruz Province Mendoza Mining friendly Santa Cruz province La Pampa Buenos Aires Neuguen Track record in precious and base metal Chile Rio Negro production Major industry players: Chubut Argentina Santa Cruz 5
Slide 6: Production
Production 6
Slide 7: Lomada de Leiva Project Ramp Up underway to Full production
Lomada de Leiva Project Ramp Up underway to Full production Trial Pad extension completed, additional 220k capacity added Main Pad 75% complete, begin loading Q4 All new Mining Fleet on site, contract fleet demobilised 90% of all CAPEX now spent, Plant expansion to be complete by end October 7
Slide 8: Production
Production Excellent mine recovery, visual control, Low Grade control cost Low dilution of ore in pit, good reconciliation HW Waste ORE FW Waste ORE Up to 20m thick true width 8
Slide 9: Lomada de Leiva Project: Achieving Targets
Lomada de Leiva Project: Achieving Targets Mining recovery Production Trend excellent with minimum dilution due to good visual control and uncomplicated geology 7962 Oz of Au produced to date @ average realised price of $US 1400/Oz, $USD 11.1M Q3-Q4 production on target to produce scheduled 14,000 o
Slide 10: Advanced Projects
“a Advanced Projects lec GOLD PLC . AIM:PGD \
Slide 11: Resources
Resources 43-101 Compliant (oz) – 4 Projects INDICATED GRADE (g/t) METAL (Oz) PROJECT Tonnes Au Ag AuEq Au Ag AuEq Cap-Oeste 7,790,000 2.93 99.0 4.79 734,000 24,801,000 1,197,000 COSE 20,637 60.06 1,933.07 96.21 39,850 1,282,582 63,835 La Manchuria 425,705 2.95 135.00 4.07 40,317 1,848,211 55,684 Lo
Slide 12: Cap-Oeste-COSE Project
Cap-Oeste-COSE Project Our flagship project Update resource model CO-COSE corridor Commencement of Pre- Feasibility Develop CO-COSE project as one, NaCN Leachable 320K Aueq in first 3 years Cap-Oeste-COSE combined Resources 2 stage development reducing up front CAPEX Category Tonnes Au (g/t) Ag (g/t
Slide 13: Cap-Oeste-COSE Project
Cap-Oeste-COSE Project CO-COSE Mining Feasibility-Potential Scenario 1.4Km 2 stage mine Open Pit-U/G COSE 1.8km’s 120Koz’s AuEq 13
Slide 14: La Manchuria Project-New Approach
La Manchuria Project-New Approach Development target Changing priorities and potential mining methods/processing routes Re-Modelling underway focus on bulk tonnage low sulphidation, Heap Leach potential 1260m drilling completed awaiting assays re- sampling underway Current Resources Further drilling
Slide 15: La Manchuria Project-Upside potential
La Manchuria Project-Upside potential Existing Resource area Covers limited portion of Anomaly Target Areas Au Soil Anomaly over central La Ag Soil Anomaly over central La Manchuria Manchuria 15
Slide 16: Exploration and Resources
Exploration and Resources MT LEON CAP-OESTE 16
Slide 17: Santa Cruz Province
Santa Cruz Province Properties and Regional Exploration Lomada Huevos Verdes de Leiva Cerro Negro El Bagual Don Nicolas La Josefina Cap-Oeste Pinguino Cerro Puntudo COSE Cerro Moro La Manchuria Cerro Vanguardia Mina Marta Manantial PGD Properties Sarita Espejo Fomicruz Agreement Mineralisation Trend
Slide 18: El Tranquilo Exploration Area
El Tranquilo Exploration Area Advanced Projects & Other Prospects 4140m completed in 2012-2013 programme N Testing Cap- Oeste to COSE corridor Don Pancho second pass drilling completed Ground Mag programme to commence Q3 New IP and Multiple reprocessed targets to test historic data 18
Slide 19: Cap-Oeste Structural Corridor
Cap-Oeste Structural Corridor 2410000mN 2400000mN 2390000mN El Tranquilo Exploration Block 4690000 mN Cap-Oeste COSE 4680000 mN Monte Leon La Bajada Estancia 4670000 mN Marciana 19
Slide 20: La Manchuria South Project Area
La Manchuria South Project Area La Manchuria South area has excellent exploration potential Mineralisation now discovered in 4 new areas Veta Speme 3km of strike untested, grades reported up to 15km 4g/t Au and 665g/t Ag Cerro Turulo, 1.2m @ 14.5g/t Au and 236 g/t Ag Tres Lagunas, 3m @ 4.4g/t Au and
Slide 21: Growth Strategy
Growth Strategy Advancing a Portfolio of Highly Prospective Assets in Santa Cruz 2013 2014 2015 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Production LOMADA de Leiva Leach pad expansion to 300,000t+ & production Commence main heap leach Flagship Project Cap-Oeste-COSE Pre feasibility study Full feasibility
Patagonia Gold — Investor Presentation (October 2013) on 6ix