Alba Mineral Resources Plc · LSE:ALBA

Alba Mineral Resources — Investor Presentation (February 2021)

28 slides from Alba Mineral Resources's investor presentation, February 2021

  1. Slide 1: UK & Ireland Mining Portfolio

    UK & IRELAND MINING PORTFOLIO February 2021 l

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation is made on behalf of Alba Mineral Resources PLC (“the Company”). It does not constitute an admission document relating to the Company nor does it constitute an offer or invitation to purchase or subscribe for any securities in the Company. No reliance may be placed whats

  3. Slide 3: Alba's Board and Management

    ALBA’S BOARD AND MANAGEMENT George Frangeskides Executive Chairman More than 25 years’ experience in natural resources, corporate advisory & legal sectors in the UK, Europe, Africa and Australia Michael Nott Non-Executive Director Geologist and mining engineer with over 40 years’ experience Elizabet

  4. Slide 4: Alba Snapshot

    ALBA SNAPSHOT Diversity ▪ Mining Assets and Oil & Gas Investments ▪ Operating only in Low-Risk, Resources-Friendly Stability Jurisdictions ▪ Clogau-St David’s: High-Grade Gold Production Potential ▪ Thule Black Sands: High-Grade Ilmenite ▪ Amitsoq: High-Grade Graphite Market AIM Share 0.35p* ▪ Ingle

  5. Slide 5: Alba's Operations

    ALBA’S OPERATIONS Channel sample, Amitsoq,Greenland Thule Black Sands,Greenland Argillaceous bioclastic limestone, Limerick, Ireland 4 4

  6. Slide 6: UK Gold Assets: Projects in Dolgellau Gold Field

    UK GOLD ASSETS: 3 PROJECTS IN DOLGELLAU GOLD FIELD Dolgellau Gold Clogau – St. David’s Gold Exploration Project Gwynfynydd Gold Mine Mine (DGEP) UK’s largest historic producer UK’s second largest historic 10 new gold targets identified of gold producer of gold over a 9km stretch of the Alba now has

  7. Slide 7: Location of Alba's UK Gold Assets

    LOCATION OF ALBA’S UK GOLD ASSETS Clogau-St David’s and Holyhead Port Gwynfynydd 1.5 hrs (with 3 situated in hr crossing to Dolgellau Gold Dublin) Belt in North Wales Close to major roads and 0.5 hrs to cities: Barmouth and Birmingham (2 Cardigan Bay hrs), Manchester (2.5 hrs), Cardiff (3 hrs), Lond

  8. Slide 8: Geology of the Dolgellau Gold Field

    GEOLOGY OF THE DOLGELLAU GOLD FIELD Geological setting for gold at Clogau-St David’s is a complex interplay between the carbonaceous Clogau Shales, shear zones and intrusive greenstones to form auriferous quartz veins Historically, gold found in exceptionally high- grade pockets within quartz veins

  9. Slide 9: Gold Price: At an All-Time High

    GOLD PRICE: AT AN ALL-TIME HIGH Aug 2020: Gold price hits record price of $2,000/oz Feb 2021: Gold price around $1,800/oz Dec 2017 (Gold price $1,279/oz): Alba acquires 49% of Clogau Aug 2018 (Gold price $1,190/oz): Alba moves to 90% control of Clogau Gold price when Clogau Mine shut in 1998: $300/o

  10. Slide 10: Clogau: Snapshot

    CLOGAU: SNAPSHOT Overview Under Alba’s ownership… ▪ UK’s largest historic gold producer (80,000 oz) ▪ Extensive Mine rehabilitation completed ▪ U/G drilling & bulk sampling completed ▪ Exclusive mineral exploration licence over ▪ Projected 550 m Main Lode extension 107 km² area covering most of DGF

  11. Slide 11: Clogau: Extensive Underground Development

    CLOGAU: EXTENSIVE UNDERGROUND DEVELOPMENT Underground workings (below) would cost millions to replicate today Existing workings provide ready access to all target zones Clogau-St David’s main reef vertical longitudinal projection from No. 1 shaft to No. 2/No. 5 shaft, across the Bryntirion fault and

  12. Slide 12: Clogau: U/G Workings and Geological Model

    CLOGAU: U/G WORKINGS AND GEOLOGICAL MODEL ▪ Clogau Mine has exploited an E-W trending and steeply dipping shear zone containing abundant visible gold ▪ Primary mineralisation found at contact with base of Clogau Shales ▪ The Bryntirion Fault bisects and offsets the Clogau and St David’s Mine areas ▪

  13. Slide 13: Clogau: Extensive Mine Rehabilitation

    CLOGAU: EXTENSIVE MINE REHABILITATION ▪ Extensive rehabilitation works completed in the Mine, including: ▪ New roof section (Lower Adit) ▪ 60 metre ladderway installed (Service Raise) ▪ 280 metre air pipeline rehabilitated 12 12

  14. Slide 14: Clogau: Phase 1 Underground Drilling Programme

    CLOGAU: PHASE 1 UNDERGROUND DRILLING PROGRAMME ▪ Phase 1 completed October 2020 ▪ 7 drillholes completed for 559.5m ▪ All drillholes intersected quartz veins, validating Alba’s geological model ▪ Drill core from L002 returned gold assays of 1.16 metres at 0.653 g/t, including 0.25 metres at 1.79 g/t

  15. Slide 15: Clogau: Phase 1 Surface Drilling

    CLOGAU: PHASE 1 SURFACE DRILLING ▪ Six drillholes completed so far for 724 m ▪ Significant quartz veins found in 4 out of 5 holes ▪ LL001 intersected 6.48 m of quartz veins, LL002 3.65 m and LL003 5.7 m ▪ Existing vein system now projected as extending 66 m below deepest previously worked zone 14

  16. Slide 16: Clogau: Phase 1 Surface Drilling

    CLOGAU: PHASE 1 SURFACE DRILLING ▪ Identification of 66 m wide projected lode structure below No 4 Level provides significant zone for follow- up exploration drilling & bulk sampling ▪ Objective will be to access zone from Llechfraith shaft, once dewatered ▪ Targeted exploration planned first by cha

  17. Slide 17: Clogau 2021 Plans: Phase 2 Surface Drilling

    CLOGAU 2021 PLANS: PHASE 2 SURFACE DRILLING ▪ 10-hole programme planned for ~2,000 m ▪ Objectives: ➢ Prove up 550m Main Lode extension indicated by Phase 1 underground drilling ➢ Intersect projected depth extensions of historically worked lodes, Grandfathers and 7-10 Lode 16

  18. Slide 18: Clogau 2021 Plans: Phase 2 Bulk Sampling

    CLOGAU 2021 PLANS: PHASE 2 BULK SAMPLING ▪ Clogau gold is irregularly disseminated, exploration therefore combines drilling and bulk sampling for representative grades ▪ Phase 1 underground bulk sampling programme completed Oct 2020 ▪ 36 tonnes of material collected from several target zones ▪ Proce

  19. Slide 19: Clogau: Simple Processing

    CLOGAU: SIMPLE PROCESSING ▪ 1.5 ton/hr pilot gold processing plant acquired and assembled on site ▪ Clogau gold highly amenable to gravity concentration ▪ Simple processing: crush then pass through gravity concentrator and shaking table ▪ Small sample put through 3rd party processing plant using sam

  20. Slide 20: Clogau: Route to Commercialisation

    CLOGAU: ROUTE TO COMMERCIALISATION Price Premium ▪ Clogau gold fetches significant premium over normal gold spot price Cachet ▪ Wedding rings for Royal Family traditionally made from Clogau gold Scarcity ▪ No current sources of production Markets ▪ Alba to be sole producer of Welsh gold and control

  21. Slide 21: Clogau: Route to Production

    CLOGAU: ROUTE TO PRODUCTION 0-12 Month Plan ▪ Phase 2 underground and surface drilling, targeting identified extensions to mine workings ▪ Phase 2 channel and bulk sampling ▪ Processing of bulk samples ▪ Dewatering and rehabilitation of Llechfraith Main Shaft for channel and bulk sampling ▪ Pitting

  22. Slide 22: Dolgellau Gold Exploration Project (DGEP)

    DOLGELLAU GOLD EXPLORATION PROJECT (DGEP) ▪ 12-month regional geochemical program ▪ Gold mineralisation found across ~9 km ▪ 10 new gold targets identified away from mine workings ▪ Strike length of largest new anomaly is 2km (4 times larger than Clogau) ▪ Surface trenching to be employed over new g

  23. Slide 23: DGEP: Surface Trenching

    DGEP: SURFACE TRENCHING ▪ Trenching involves removing soil cover to expose bedrock for sampling ▪ 1st trenching campaign of 8 trenches for ~600 m completed over single regional gold target ▪ Trenching validated Alba’s regional geological model, by uncovering several quartz veins ▪ Includes 2.1m wide

  24. Slide 24: Gwynfynydd Gold Mine

    GWYNFYNYDD GOLD MINE ▪ Exclusive six-year exploration licence over 20 km² area ▪ Commercial development started in 1887 ▪ Total production: 45,000 ounces (~1.3 tonnes) ▪ Historical mining grade: 15 grams per tonne ▪ Last production 1991-99: 10,000 tonnes of ore extracted annually from total resource

  25. Slide 25: Gwynfynydd: Geology and Work Programme

    GWYNFYNYDD: GEOLOGY AND WORK PROGRAMME ▪ Historical data capture: mine plans, underground sampling, BGS soil and stream sediment sampling ▪ Reinterpret BGS aeromag data and add to 3D geological model & generate gold targets ▪ Undertake focused stream sediment sampling & soil geochemistry programmes

  26. Slide 26: Limerick Base Metals

    LIMERICK BASE METALS 100% owned and located within major zinc-lead district ▪ Irish Ore Field: home to some of Europe’s largest zinc projects ▪ Tara (Boliden) ▪ Pallas Green (Glencore) ▪ Lisheen (Vedanta) ▪ Galmoy (Lundin) ▪ Alba’s Limerick Project is surrounded by active exploration companies Alba’

  27. Slide 27: Limerick Drill Targets

    LIMERICK DRILL TARGETS ▪ Coonagh Castle Fault one of main faults transecting Limerick Basin ▪ Determining trace of Coonagh- Castle fault to within tens of metres on surface crucial to success of future drilling ▪ Interpretation of Tellus and satellite (Sentinel) imagery for PL3824 will provide a str

  28. Slide 28: Contact Details

    CONTACT DETAILS Alba Mineral Resources plc Tel: +44 (0) 20 3950 0725 Email: info@albamineralresources.com Web: www.albamineralresources.com : @AlbaMinerals 27

Alba Mineral Resources — Investor Presentation (February 2021) on 6ix