Zooz Strategy Ltd. · TASE:ZOOZ
Zooz Strategy — ZOOZ Power — Investor Presentation (August 2024)
22 slides from Zooz Strategy's investor presentation, Aug 1, 2024
Slide 1: Form 6-K Report of Foreign Private Issuer
form6-k.htm 6-K 1 of 3 08/01/2024 08:36 AM UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 6-K REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934 For the month of August 2024 Commission File Number: 001-42005 ZOOZ
Slide 2: Exhibit Index
EXHIBIT INDEX Exhibit No. Description 99.1 ZOOZ Power’s Investors Business Update Presentation
Slide 3: Signatures
SIGNATURES Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. This Form 6- K, including all exhibits hereto, is hereby incorporated by reference into all effective r
Slide 4: Exhibit 99.1
ex99-1.htm EX-99.1 1 of 19 08/01/2024 08:36 AM Exhibit 99.1
Slide 5: Legal Disclaimer
Legal Disclaimer > The following presentation (this “Presentation”) is for informational purposes only and has been prepared by ZOOZ Power Ltd. (the “Company” or “ZOOZ"). > The information contained in this Presentation is the property of ZOOZ. This Presentation may not be copied, published, reprodu
Slide 6: Legal Disclaimer: Forward-Looking Statements
Legal Disclaimer Forward-Looking Statements » This Presentation contains “forward-looking statements” within the meaning of Section 27A of the U.S. Securities Act of 1933 as amended (the “Securities Act”), and Section 21E of the U.S. Securities Exchange Act of 1934, as amended (the “Exchange Act”) a
Slide 7: Enables Ultra-Fast Charging, Even at Power-Limited Grid
Enables Ultra-Fast Charging, Even at Power-Limited Grid Power Booster We EMS Optimized 8 Micro-grid Ultra-Fast Chargers 8 Power 2 Management /\ E Ao £ z 4 4s, A hk SSS Power-Constrained Power Booster Power Booster Grid charged during discharged to enable idle times faster EV charging Powerful Energy
Slide 8: The Boosting Cycle
The Boosting Cycle Energy boost Total Power by the ZOOZTER Nn consumption |v Energy used to charge the ZOOZTER ZOOZTER | SOC% Demandis | Demandisgreater | Demandis supported | thangridpower- | lower than . by the id ZOOZTER boost: rid 2-1 Powerful Energy Management Solution That Ce | the gtd, eivabt
Slide 9: Highway Public Charging Site
Highway Public Charging Site ZOOZTER™-100 (+EMS) = iH H LL I ~200 kW 1x SOkW 1x 150 kW ~200 kW 3x 150 kW (2.x 75kW) (6x 75kW) ZOOZTER™-100 Site 2 (+EMS) BX 0 Aes Fes a AN Hadad es ~300 kW 2x 100 kW 75180 AW’ ~300 kW 4x 150 kW (4 x SOW) (2x 75kW) (8 x 75kW) ZOOZTER™-100 Systems & ZOOZ-EMS Enable cust
Slide 10: Case Study: Highway Public Charging Site - Results
CASE STUDY Highway Public Charging Site - Results Site Utilization (cars/day) Daily Energy Charging - (kWh) After ZOOZTER Installation e os Before ° ZOOZTER ohh 2,912 ov ob 2 ns Installation 2 $ vs 1,801 8 om © 5 |t DB | jeteplee 3: ani in| Ki G tH 0) I tn May June July Utilization and Electricity S
Slide 11: Highway Public Charging Site: Example of ZOOZTER Contribution
STUDY Highway Public Charging Site Example of ZOOZTER Contribution Zoorter Soc ZOOZTER is boosting with extra power ZOOZTER is recharged im Grid limited to max power of 300kW 15 ae Se cee 1 ot th Da = ~ 1M ry ZOOZTER is boosting with extra power > During a day with 146 charging sessions, the ZOOZTER
Slide 12: ZOOZTER-100 - All-in-one Integrated System
ZOOZTER™-100 -— All-in-one Integrated System * Complies with CE and UL applicable standards * Agnostic to grid and charger vendor * Quick site integration + Flexible re-deployment
Slide 13: ZOOZ Flywheel - Mechanism of Action
ZOOZ Flywheel - Mechanism of Action Vacuum Sealed Capsule LI DZOOZ Magnetic Bearing
Slide 14: ZOOZ Flywheel - Mechanism of Action
ZOOZ Flywheel - Mechanism of Action DDIM 335 ay mil m nie eS, | Accelerating Charging (Converting electricity to Kinetic Energy) Levitating Storing Kinetic Energy pis = Decelerating Discharging Kinetic Energy (converted to electricity)
Slide 15: Accelerating Network Growth
Accelerating Network Growth & ZB S SS LS a Keep the ZOOZTER on site Use the ZOOZTER as a re-deployable asset > To facilitate utilization increase (more chargers deployed) > Faster “land grabbing” - 5 to accelerate network th > To reduce electricity cost ocelerate network grow (avoid demand charges)
Slide 16: ZOOZ's Installed Base in Europe
ZOOZ's Installed Base in Europe
Slide 17: Expanding Collaboration with "ON" Charging Network
Expanding Collaboration with “ON” Charging Network “= ON" - the leading ultra-fast Charging network in Israel » enables "ON" to upgrade its charging sites on Israel's main highway, despite grid limitations. : > more charging ports > faster chargers
Slide 18: Moving Forward in the European Market
Moving Forward in the European Market @ » Started commercial sales in Germany in 2023 > 4 ultra-fast charging sites, enabled by the ZOOZTER™-100, > Built in collaboration with major German CPOs — Mer & Parkstrom » Sites are used for demonstrations to additional EU customers & partners.
Slide 19: 1st Entry to the UK Market
1st Entry to the UK Market <p. >» Site owned & operated by Osprey Charging, one of the too-3 CPOs in the UK market >» ZOOZTER™-100 enabled site’s upgrade to ultra-fast charging. » Site is leveraged for demonstrations to potential customers & partners in the UK.
Slide 20: First Order from DPD
First Order from DPD Last-Mile Delivery Leader in the UK >» About DPD > Part of DPDgroup, a leading parcel delivery network across Europe, > Parent Company: GeoPost (a subsidiary of La Poste, France's national postal service) >» DPD aims to achieve a 100% electric fleet by 2030 > ZOOZ will help to a
Slide 21: Moving Forward in the US Market
Moving Forward in the US Market » Additional Pilot sites, expected in 2024: (lf A yew. | NY Power Car Rental Giant ae Authority Global Rental Service Provider Largest US Utility @ LaGuardia Airport, NY. @ NYPA facility, Marcy, NY Q3/2024" Q3/2024* DZo OZ * Company estimation, subject to changes Cs)
Slide 22: T. 20072 O1 3WIL Sit
\ r \W _ ! T. 20072 O1 3WIL Sit w