I-80 Gold Corp · TSX:IAU

I-80 Gold — Q4 2025 Earnings Presentation

20 slides from I-80 Gold's earnings presentation, Feb 20, 2026

  1. Slide 1: Creating a Nevada-Focused, Mid-Tier Gold Producer

    NYSE:IAUX | TSX:IAU MADE IN THE U.S.A. C R E AT I N G A N E V A D A - F O C U S E D , M I D -T I E R G O L D P RO D U C E R Q4 and Full Year 2025 Conference Call & Webcast February 20, 2026

  2. Slide 2: Cautionary Disclaimer Regarding Forward-Looking Statements

    CAUTIONARY DISCLAIMER REGARDING FORWARD-LOOKING STATEMENTS Certain statements in this presentation constitute “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws, including but not limited to management’s assessment of the Company’s future p

  3. Slide 3: Visible Progress on Key Development Milestones

    2025 VISIBLE PROGRESS ON KEY DEVELOPMENT MILESTONES ✓ Achieved 2025 guidance with consolidated gold output of 31,930 ounces, reflecting YoY growth driven by the continued ramp-up at Granite Creek underground ✓ Lone Tree refurbishment engineering study complete Q3 ✓ Strengthened balance sheet with re

  4. Slide 4: Granite Creek Underground Ramp-Up Driving Improved Performance

    GRANITE CREEK UNDERGROUND RAMP-UP DRIVING IMPROVED PERFORMANCE Three months ended Year ended Granite Creek Property December 31, December 31, Operational Statistics 2025 2024 2025 2024 Mined More Material in Q4 and Full Year Oxide mineralized material mined tonnes 15,490 21,369 70,183 62,789 Period

  5. Slide 5: South Pacific Zone at Granite Creek: 2025 Drilling Demonstrated Potential for Expansion

    SOUTH PACIFIC ZONE AT GRANITE CREEK 2025 DRILLING DEMONSTRATED POTENTIAL FOR EXPANSION 2025 Drill Program • Designed to expand the mineralized envelope and support the upcoming feasibility study • 16,000 meters drilled over 46 holes completed + six additional infill holes to test and confirm the con

  6. Slide 6: Archimedes Underground

    ARCHIMEDES UNDERGROUND UNDERGROUND DEVELOPMENT ADVANCING AHEAD OF EXPECTATIONS Underground Development Reached ~680 Meters by Year-end • Advancing toward the exploration drift as soon as possible to support continued feasibility-level technical work • Initial mineralization expected to be intercepte

  7. Slide 7: Mineral Point Open Pit

    MINERAL POINT OPEN PIT POTENTIAL TO BECOME i-80’S LARGEST PRODUCING ASSET Recently Announced Financing Package Provides Financial Flexibility to Accelerate The Pre-feasibility/Feasibility Study And Permitting • ~ 8,600 meters of surface core drilling completed in 2025 to support geotechnical, metall

  8. Slide 8: Cove Underground

    COVE UNDERGROUND FEASIBILITY STUDY NEARING COMPLETION FOR Q2 2026 • Revising the mine plan and cut-off grade to new gold price estimates • Evaluating capital cost reduction opportunities with the dewatering program • ~41,000 meters of infill drilling completed on 30-meter spacing across the Gap and

  9. Slide 9: Granite Creek Open Pit

    GRANITE CREEK OPEN PIT ONGOING TECHNICAL TRADE OFF ANALYSES TO OPTIMIZE ECONOMICS GRANITE CREEK OPEN PIT LAYOUT Technical Baseline Work Underway to Advance the Project Toward a Pre-feasibility or Feasibility Study • Initial project narrative was provided to regulatory authorities in Q3 to initiate f

  10. Slide 10: Lone Tree Plant

    LONE TREE PLANT POSITIVE CONSTRUCTION DECISION GRANTED Refurbishment Engineering Study Completed Q4 2025 • Refurbishment and recommissioning unlocks transformational value through increased processing capacity and meaningful margin improvements per ounce of gold Plant Capacity Design Throughput ~2,2

  11. Slide 11: 2026 Guidance

    2026 Guidance 2026 GUIDANCE Production(1) Granite Creek underground oz Au 30,000 - 40,000 Archimedes underground and residual heap leach oz Au 10,000 • Largely in line with Preliminary Economic Assessments filed March 2025 Operating costs • Increased processing costs related to the new Granite Creek

  12. Slide 12: 2025 Financial Highlights

    2025 FINANCIAL HIGHLIGHTS • 28,196 ounces in gold sales1 due to advancements made at Three months ended Twelve months ended Granite Creek, slightly offset by a lag in the timing of third- December 31, December 31, party processing 2025 2024 2025 2024 • ~6,500 recovered ounces of sulfide stockpile du

  13. Slide 13: Recapitalization Plan: Up to $500M Financing Package Secured

    RECAPITALIZATION PLAN UP TO $500M FINANCING PACKAGE SECURED Secured Commitments February 11, 2026 $250M Franco-Nevada Royalty $250M Gold Prepayment Facility with National Bank & Macquarie • $225M available at closing • $150M initial draw at closing(18) • $50M to advance Mineral Point • To deliver 39

  14. Slide 14: Recapitalization Plan Almost Complete

    RECAPITALIZATION PLAN ALMOST COMPLETE Upon Completion of Recapitalization, Capital Strengthens Balance Sheet to Materially Advance Development Plan • Refurbish Lone Tree processing facility • Total Funding Secured to Date Exceeds ~$800M • Retire ~$175M of existing debt(3) • Secured financing package

  15. Slide 15: Near-Term Catalysts

    TECHNICAL STUDIES NEAR-TERM CATALYSTS ❑ Cove underground (Feasibility) — Q2 2026 ❑ Granite Creek underground (Feasibility) — Q2 2026 12 -18 MONTHS ❑ Archimedes underground (Feasibility) — Q1 2027 LONE TREE PLANT ✓ Positive construction decision — Granted early-Q1 2026 ❑ Commence demolition — Q2 2026

  16. Slide 16: Q&A

    Q&A

  17. Slide 17: Appendix

    APPENDIX

  18. Slide 18: Non-GAAP Financial Performance Measures

    NON-GAAP FINANCIAL PERFORMANCE MEASURES The Company has included certain terms or performance measures commonly used in the Average realized gold price per ounce of gold sold1 mining industry that are not defined under US GAAP in this document. These include adjusted Three months ended Year ended lo

  19. Slide 19: Non-GAAP Financial Performance Measures Continued

    NON-GAAP FINANCIAL PERFORMANCE MEASURES CONTINUED Definitions Adjusted loss1 "Adjusted loss” and “adjusted loss per share” are non-GAAP financial performance measures Adjusted loss and adjusted loss per share exclude a number of temporary or one-time items detailed in that the Company considers to b

  20. Slide 20: Endnotes

    ENDNOTES 1) Consolidated gold output estimates and average annual gold output gets are based on the most recent LOM output schedules disclosed in the latest technical studies filed for each respective project and related property: Granite Creek underground project, Archimedes underground project, Co

i-80 Gold — Q4 2025 Earnings Presentation on 6ix