  1. Slide 1: South32 Worsley Alumina Mine CLC Meeting

    SOUTH32 WORSLEY ALUMINA MINE CLC MEETING 18 November 2025

  2. Slide 2: Agenda

    AGENDA Item Description Presenter 1 Open meeting and note apologies G Cavanagh 2 Acknowledgement of Country South32 Read and accept previous minutes 3 Review actions and responses G Cavanagh Acknowledge receipt of questions – 18 November Worsley Business Update • South32 Update • Boddington Bauxite

  3. Slide 3: Acknowledgment of Country

    Acknowledgment of Country I would like to acknowledge the Wilman people of the Noongar nation who are the Traditional Custodians of this land we meet on today. I would also like to pay my respect to all Elders past, present and emerging. 3

  4. Slide 4: Worsley Business Update

    WORSLEY BUSINESS UPDATE Quarterly Report September 2025 o Production highlights included a 12 per cent increase in payable copper equivalent production at Sierra Gorda and a 33 per cent uplift in manganese volumes, as we successfully executed the operational recovery plan at Australia Manganese. o A

  5. Slide 5: Worsley Business Update

    WORSLEY BUSINESS UPDATE Boddington CLC Meeting SLIDE 5

  6. Slide 6: Operational Update

    OPERATIONAL UPDATE

  7. Slide 7: Operational Update

    OPERATIONAL UPDATE o Production for the quarter progressed well – tracking above forecast for the period o Drilling exceeded forecast (metres drilled) and blasting activities exceeded budget (holes blasted). o Challenges throughout the quarter with grade, reactive silica levels and oxalate levels, p

  8. Slide 8: Operational Update – Projects

    OPERATIONAL UPDATE – PROJECTS Lower Hotham Road The works outlined below are currently scheduled to be completed by 15/01/2026.  General Freight deliveries: coming from Perth over the next 2-3 weeks. Loads expected are single semi-trailers with minimal materials.  Water Deliveries: > 6 Semi loads

  9. Slide 9: Operational Update – Projects

    OPERATIONAL UPDATE – PROJECTS • Newmont • - Low to no impact expected for neighbours in surrounding areas. • - Closest neighbour to current activities is 8.9km from the work front. • - Accommodating workers in the Newmont camp from 15th September. Approx 60 currently, not anticipating this to increa

  10. Slide 10: HoN Mine Development

    HON MINE DEVELOPMENT • The Hotham North Mine Development (HoN ) is a Life Extension project forming part of the Worsley Life of Operations Plan (LoOP) and is within the current Part IV Environmental Approval (MS1237). • The extension is business sustaining and not linked to a production increase, wi

  11. Slide 11: HoN Ore Transport: Crusher & Conveyor

    HON ORE TRANSPORT: CRUSHER & CONVEYOR • As part of the pre-feasibility study, a Crusher and Conveyor was endorsed as the preferred method of materials handling infrastructure • The OLC Conveyor is a single flight Conveyor, 14km in length (Similar to the existing Marradong OLC) • The OLC Conveyor wil

  12. Slide 12: Environment Update

    bE <x a oO 5 ee Z Lu = Zz O a > Z Lu

  13. Slide 13: Environment – Dust Deep Dive

    ENVIRONMENT – DUST DEEP DIVE • BBM Licence - L5960/1983/11 Boddington CLC Meeting SLIDE 13

  14. Slide 14: Dust Results

    DUST RESULTS Dust logger feed into EQUiS - Alerts are generated for exceedances - Data is verified and validated by Benchmark - Daily reports Boddington CLC Meeting SLIDE 14

  15. Slide 15: Update: Respirable Crystalline Silica (RCS) Exposure Trends

    UPDATE: RESPIRABLE CRYSTALLINE SILICA (RCS) EXPOSURE TRENDS Notes: • This is an update of data shared at the August 2024 CLC. • RCS samples collected from 45 different workgroups (grouped into 8 SEGs) across BBM and the OBC. • All SEGS are currently below 8% of the RSC Occupational Exposure Level (O

  16. Slide 16: Airborne BBM Dust Analysis by Occupational Hygienist

    AIRBORNE BBM DUST ANALYSIS BY OCCUPATIONAL HYGIENIST • Data Sources: ⎯ BBM Dust Sampling and Analysis Report 2021 – GHD Group > 15 samples collected from Air Sampler adjacent to Crusher Building over a 3-month period in 2021 ⎯ Bauxite Ore Trace Elements Report - South32 Worsley Alumina Process Labor

  17. Slide 17: Summary of Hygiene Dust Analysis Results

    SUMMARY OF HYGIENE DUST ANALYSIS RESULTS Maximum Results VS. DWER Maximum results VS. Maximum Results VS. Average Results Maximum Results Maximum Results VS. SWA Constituent Ambient Air Quality Australian Freshwater Quality Australian/WHO Drinking (ug/m3) (ug/m3) Workplace Exposure Limits Guidelines

  18. Slide 18: Conclusions

    CONCLUSIONS • Three elements had maximum dust concentrations greater than 50% of the DWER Ambient Air Quality Guidelines: Aluminium, Manganese, and total PM10 particulates. ⎯ Aluminium is extremely abundant in the earth’s crust and has very low toxicity. Therefore, no health-based guideline value ha

  19. Slide 19: Hygienist's Rainwater Harvesting Recommendations

    HYGIENIST’S RAINWATER HARVESTING RECOMMENDATIONS • Rainwater is usually safe to drink unless it has been contaminated or stored improperly. ⎯ Worsley’s Occupational Hygienist shared information about keeping rainwater collection systems clean and safe. Refer to: https://www.healthywa.wa.gov.au/Artic

  20. Slide 20: Environment – Orchid Update

    ENVIRONMENT – ORCHID UPDATE Boddington CLC Meeting SLIDE 20

  21. Slide 21: Aluminium Stewardship Initiative

    ALUMINIUM STEWARDSHIP INITIATIVE • BIODIVERSITY & ECOSYSTEM SERVICES ASI Performance Standard: 8.1 a & b The entity shall: • a. Assess the risk to and potential impacts on Biodiversity & Ecosystem Services • b. Undertake a systematic review, in consultation with and with the participation of Affecte

  22. Slide 22: Aluminium Stewardship Initiative

    ALUMINIUM STEWARDSHIP INITIATIVE • Affected Populations ASI Performance Standard: 9.1c • A mapping of Affected Populations and Organisations to ensure Affected Populations and Organisations are: ⎯ I. Engaged by the Entity ⎯ II. Consulted about operational activities and potential significant Human R

  23. Slide 23: Aluminium Stewardship Initiative

    ALUMINIUM STEWARDSHIP INITIATIVE • Phase 1 – Project Initiation & Knowledge Gap Assessment • Phase 2 – Baseline Assessment • Phase 3 – Stakeholder Engagement • The purpose of this phase is to identify and validate PES through structured engagement with affected communities. Engagement will build on

  24. Slide 24: Community Update

    COMMUNITY UPDATE , YW

  25. Slide 25: Community Update

    COMMUNITY UPDATE • COMMUNITY COMPLAINTS - OPT IN FOR NOTIFICATIONS - Advertisement in Boddington News October edition inviting community members who want to opt-in to receive community 15 complaints FY26 - July/August 2025 • notifications via text or email. 15 complaints related to BBM: o 3 x Dust o

  26. Slide 26: Community Investment

    COMMUNITY INVESTMENT o Shire of Boddington 2025 Boddington Careers Expo o Boddington District High School - Faction Athletics Day - RUOk Day o BBM Rehabilitation Tours o Boddington Golf Club Men’s Open o Boddington Lion's Rodeo o Peel District Cycling Club SLIDE 26

  27. Slide 27: Community Update

    COMMUNITY UPDATE • Local Voices Pulse Survey has now closed. • Survey advertising was promoted in the Boddington News, SouthWest Times, Collie News Bulletin, and social media. Boddington CLC Meeting SLIDE 27

  28. Slide 28: Local Voices – Preliminary Data

    LOCAL VOICES – PRELIMINARY DATA N = 712 N = 272 N = 265 Boddington CLC Meeting SLIDE 28

  29. Slide 29: Local Voices – Preliminary Data

    LOCAL VOICES – PRELIMINARY DATA N = 39 Boddington CLC Meeting SLIDE 29

  30. Slide 30: Local Voices – Preliminary Results

    LOCAL VOICES – PRELIMINARY RESULTS Boddington CLC Meeting SLIDE 30

  31. Slide 31: Local Voices – Preliminary Results

    LOCAL VOICES – PRELIMINARY RESULTS Boddington CLC Meeting SLIDE 31

  32. Slide 32: Local Voices – Preliminary Results

    LOCAL VOICES – PRELIMINARY RESULTS Boddington CLC Meeting SLIDE 32

  33. Slide 33: Local Voices – Preliminary Results

    LOCAL VOICES – PRELIMINARY RESULTS Boddington CLC Meeting SLIDE 33

  34. Slide 34: Local Voices – Preliminary Data

    LOCAL VOICES – PRELIMINARY DATA Boddington CLC Meeting SLIDE 34

  35. Slide 35: Local Voices – Preliminary Data

    LOCAL VOICES – PRELIMINARY DATA Boddington CLC Meeting SLIDE 35

  36. Slide 36: Community – CLC Profiling

    COMMUNITY – CLC PROFILING Why o Sharing who the members are demonstrates openness and accountability. o It shows the committee is made up of real, local people who represent community interests rather than being a “closed group.” o Public profiles help validate that members have relevant experience

  37. Slide 37: Slide 37