Top End Energy Limited · ASX:TEE

Top End Energy — SEAAOC Conference 2023

8 slides from Top End Energy's conference presentation, Sep 14, 2023

  1. Slide 1: McArthur Basin Hydrogen and Helium Potential

    For personal use only MCARTHUR BASIN HYDROGEN AND HELIUM POTENTIAL SEAAOC CONFERENCE PRESENTATION SEPTEMBER 2023

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation is for the sole purpose of preliminary background information to enable recipients to review the business activities of Top End Energy Limited (Australian Company Number 650 478 774) (the Company). For personal use only This presentation is not a prospectus and does not

  3. Slide 3: Acknowledgement of Country

    ACKNOWLEDGEMENT OF COUNTRY For personal use only Top End Energy acknowledges Traditional Owners of country including the lands of the Larrakia people where we meet today We pay our respect to Aboriginal cultures, and to Elders past, present and emerging 3

  4. Slide 4: Large, Prospective Australian Acreage Position

    LARGE, PROSPECTIVE AUSTRALIAN ACREAGE POSITION • ~170,000km2 total acreage postion1 For personal use only • Three technically independent high-graded focus areas • Targeting basin margins 2 • High equity positions : • ATP 1069 (100% interest), Queensland • 30 exploration permit applications (~58% in

  5. Slide 5: Greater McArthur Basin: Targeting Basin Margins

    GREATER MCARTHUR BASIN TOP END IS TARGETING BASIN MARGINS EP 257 Broughton – 1 • Potential basin margin extensions of the Beetaloo For personal use only Q3 20223 are interpreted Q1 20231 Unproven extension • Tanumbirini 3H • Unconventional and conventional plays possible Successful stimulation of de

  6. Slide 6: McArthur Basin Zone Play Systems Elements

    MCARTHUR BASIN ZONE HYDROGEN AND HELIUM PLAY SYSTEMS ELEMENTS Northern AOI For personal use only Gas Pipeline High readings of dissolved hydrogen in AOI¹ MCARTHUR Shenandoah-1/1A BEETALOO SUB-BASIN Southern AOI • Play fairway mapping across AOIs of the McArthur Basin SOUTH NICHOLSON • High Helium co

  7. Slide 7: Natural Hydrogen Potential: Results of Phase 1 Play Fairway Mapping

    NATURAL HYDROGEN AND HELIUM POTENTIAL RESULTS OF PHASE 1 PLAY FAIRWAY MAPPING For personal use only • TEE study indicates all the natural Hydrogen play systems elements are present on the margins of the McArthur Basin • Highly prospective play fairways which will be a focus for future exploration wo

  8. Slide 8: Thank You

    For personal use only THANK YOU Enquiries info@topendenergy.com.au

Top End Energy — SEAAOC Conference 2023 on 6ix