  1. Slide 1: Growing Production & Transformative Discoveries

    Slide 1: Growing Production & Transformative Discoveries

    Growing Production & Transformative Discoveries INVESTOR PRESENTATION • November 2026 K1 Vein, Kora Deposit Kainantu Gold Mine 2021 THAYER LINDSLEY AWARD Papua New Guinea (BEST GLOBAL DISCOVERY)

  2. Slide 2: Forward-Looking and Cautionary Statements

    Slide 2: Forward-Looking and Cautionary Statements

    Forward-Looking and Cautionary Statements TSX: KNT OTCQX: KNTNF This Presentation is being provided for information purposes only and does not constitute or form part of, and should not be construed as, an offer or invitation to sell or any solicitation of any offer to purchase or subscribe for any

  3. Slide 3: K92 Mining – A Unique Tier-1 Opportunity

    Slide 3: K92 Mining – A Unique Tier-1 Opportunity

    K92 Mining – A Unique Tier-1 Opportunity TSX: KNT OTCQX: KNTNF Rapid near-term growth to Tier 1 Mid-Tier Producer Large, high-grade resource with significant growth towards 500 koz AuEq pa at industry leading low costs potential from multiple deposits • Stage 3 Expansion to 300 koz AuEq pa run-rate

  4. Slide 4: Attractive Valuation - Compelling Re-Rate Opportunity

    Slide 4: Attractive Valuation - Compelling Re-Rate Opportunity

    Attractive Valuation - Compelling Re-Rate Opportunity TSX: KNT OTCQX: KNTNF P / NAV 2025 – 2029E Production Growth (koz AuEq) Peer Average: 1.07x +34% +130% Significant Re-Rate Potential As K92 Transitions Into Becoming a Tier-1, Mid-Tier Producer 4 Note: Prices as of September 11, 2026. 2025 produc

  5. Slide 5: Amongst The Highest Grade, Lowest Cost Operating Mines Globally

    Slide 5: Amongst The Highest Grade, Lowest Cost Operating Mines Globally

    Amongst The Highest Grade, Lowest Cost Operating Mines Globally TSX: KNT OTCQX: KNTNF Proven and Probable Reserves (>1 Moz Contained Ounces) and AISC (US$/oz Au) Judd 1365 Level Operation 1 Company Reserve Grade 2025 Grade BMO Forecasted 2026 AISC (Au g/t) (Au g/t) ($/oz Au)5 Macassa Agnico Eagle 8.

  6. Slide 6: Located Amongst World Class Geology and Excellent Infrastructure

    Slide 6: Located Amongst World Class Geology and Excellent Infrastructure

    Located Amongst World Class Geology and Excellent Infrastructure TSX: KNT OTCQX: KNTNF Natural Resource Friendly Jurisdiction Large ~830 km2 land package along major regional • Multiple Senior Mining Companies Operating (Barrick, Harmony, Newmont) structure hosting multiple large world-class • Vibra

  7. Slide 7: Corporate Structure

    Slide 7: Corporate Structure

    Corporate Structure TSX: KNT OTCQX: KNTNF Key Financial Data (for the period ending Sept 30/26) Fully Funded to Execute Growth Trajectory Symbol TSX: KNT, OTCQX: KNTNF Strong Cash Balance Fully Diluted Shares Outstanding 248.1 million Cash and Cash Equivalents US$390m Significant Available Liquidity

  8. Slide 8: Delivering Sustainable Value – 2025 Sustainability Report

    Slide 8: Delivering Sustainable Value – 2025 Sustainability Report

    Delivering Sustainable Value – 2025 Sustainability Report TSX: KNT OTCQX: KNTNF • Outstanding Community Humanitarian Initiative awarded by the PNG Chamber of Resources and Energy (“CORE”) in 2025 for the K92 Adult Literacy Program • Fourth consecutive year K92 has received primary community-related

  9. Slide 9: Value Creation Through Discovery

    Slide 9: Value Creation Through Discovery

    Value Creation Through Discovery TSX: KNT OTCQX: KNTNF May 2017 October / December 2021 September 2023 (Long Sections, Looking West) Kora North Kora and Judd Kora and Judd 1.7 moz at 11.6 g/t AuEq Inferred1 2.3 moz at 9.3 g/t AuEq Measured & Indicated 2.6 moz at 10.0 g/t AuEq Measured & Indicated 2.

  10. Slide 10: 2026 Operational Guidance – Another Major Step Forward Planned

    Slide 10: 2026 Operational Guidance – Another Major Step Forward Planned

    2026 Operational Guidance – Another Major Step Forward Planned TSX: KNT OTCQX: KNTNF Key Figures Key Highlights • Production Growth: Production is expected to be strongest in Q4 2026, driven by Amount a planned higher-grade stoping sequence, the continued ramp-up of the second and third mining front

  11. Slide 11: Systematically Executing to Become a Tier 1 Mid-Tier Producer

    Slide 11: Systematically Executing to Become a Tier 1 Mid-Tier Producer

    Systematically Executing to Become a Tier 1 Mid-Tier Producer TSX: KNT OTCQX: KNTNF Plant Commissioning Targeting Late 2027 Completed Dec 2025 Commissioning 4Q 2020 2Q 2023 Stage 3 Stage 4 Stage 2 Stage 2A 1,200,000 tpa 1,800,000 tpa 300 koz AuEq pa(1) +400 koz AuEq pa(1) 400,000 tpa 500,000 tpa Via

  12. Slide 12: Operational Performance – Since Commercial Production

    Slide 12: Operational Performance – Since Commercial Production

    Operational Performance – Since Commercial Production TSX: KNT OTCQX: KNTNF AuEq Production (koz), Co-Product Cash Cost ($/oz AuEq) and Co-Product AISC ($/oz AuEq) Significant Portion of Sustaining Capex is for Upcoming Expansions Stage 2 Expansion Operational Impact Due to Plant Commissioned Tempor

  13. Slide 13: Kainantu Mine Execution

    Slide 13: Kainantu Mine Execution

    Kainantu Mine Execution TSX: KNT OTCQX: KNTNF Total Ore Processed (kt) Total Development (m) Total Mined Material (kt) 486kt Ore Mined Waste 426kt 404kt 378kt 354kt 348kt 233kt 339kt 315kt 306kt 306kt 198kt 290kt 287kt 278kt 270kt 267kt 246kt 246kt 238kt 224kt 228kt 225kt 201kt 192kt 209kt 208kt 206

  14. Slide 14: Strong Process Plant Performance

    Slide 14: Strong Process Plant Performance

    Strong Process Plant Performance TSX: KNT OTCQX: KNTNF Recoveries Gold Copper New Stage 3 Expansion Process Plant performed well in its first operating quarters, delivering strong recoveries & multiple daily throughput records above the 3,290 tpd design (Jan 12: 3,945t, Dec 14: 3,822t, Dec 13: 3,794

  15. Slide 15: Near-Term Mine Transformation: Major Infrastructure Upgrades

    Slide 15: Near-Term Mine Transformation: Major Infrastructure Upgrades

    Near-Term Mine Transformation: Major Infrastructure Upgrades TSX: KNT OTCQX: KNTNF 1 Twin Incline Kora-Irumafimpa Planned Twin Incline and Development Long Section (Looking West) Scope: High Speed 2.9km twin incline, capable of +5 mtpa with conveyors Status: Complete Impact: Transforms material hand

  16. Slide 16: Near-Term Mine Transformation: Major Infrastructure Upgrades Complete

    Slide 16: Near-Term Mine Transformation: Major Infrastructure Upgrades Complete

    Near-Term Mine Transformation: Major Infrastructure Upgrades Complete TSX: KNT OTCQX: KNTNF Original Incline New Twin Incline – High Speed, Larger Equipment Internal Ramp – All Mining Fronts Connected 6.5 metres 4.5 metres 6 metres 4 metres New Dedicated Ore and Waste Passes – Leveraging Mine’s Grav

  17. Slide 17: New Primary Ventilation Commissioning Complete

    Slide 17: New Primary Ventilation Commissioning Complete

    New Primary Ventilation Commissioning Complete TSX: KNT OTCQX: KNTNF Primary Fan Chamber Puma Vent Drive Surface Breakthrough 15 metres 9.5 metres Puma Ventilation Drive breakthrough was achieved in late February 2026, increasing primary mine airflow from ~200m³/s to ~350m³/s, reducing blast re-entr

  18. Slide 18: 3x Increase in Mining Fronts in 2026

    Slide 18: 3x Increase in Mining Fronts in 2026

    3 x Increase in Mining Fronts in 2026 TSX: KNT OTCQX: KNTNF Kora-Irumafimpa Long Section (Looking West) 1 Main Mining Front Since Commercial Production 2 Commenced Production Stoping in April – Ramping Up 3 Commenced Production Stoping in Sept – Ramping Up 4 2027: New Mining Front Once Pastefill Onl

  19. Slide 19: Major Underground Mobile Fleet Upgrade & Expansion Underway

    Slide 19: Major Underground Mobile Fleet Upgrade & Expansion Underway

    Major Underground Mobile Fleet Upgrade & Expansion Underway TSX: KNT OTCQX: KNTNF New Equipment 2026 Four new Sandvik 517i loaders now operational YTD Fleet Fleet Equipment Model Arrived Remaining Use Change YE 2025 YE 2026 Surface Haul Volvo A60J (60t) - 5 3 Addition 8 +8 Trucks Loaders Sandvik LH-

  20. Slide 20: Strong PNG Government and Key Stakeholder Support

    Slide 20: Strong PNG Government and Key Stakeholder Support

    Strong PNG Government and Key Stakeholder Support TSX: KNT OTCQX: KNTNF March 2025 Site Visit – Delegation Led by August 2025 Site Visit – Delegation Led by May 2026 Site Visit – Delegation Led by Minister Governor of EHP Province Hon. Simon Sia Minister for Mining Hon. Rainbo Paita for Mining Hon.

  21. Slide 21: Near-Term Delivery of Stage 3 & 4 Expansions

    Slide 21: Near-Term Delivery of Stage 3 & 4 Expansions

    Near-Term Delivery of Stage 3 & 4 Expansions TSX: KNT OTCQX: KNTNF 2025 2026 2027 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 New Standalone Stage 3 Expansion Process Plant (1.2 mtpa) Pastefill Plant Process Capacity Ramp-up to 1.8 mtpa Mine Ramp-up to 1.8 mtpa +150 m3/s +200 m3/s +350 m3/s +600 m3/s Primar

  22. Slide 22: Stage 3 Expansion Process Plant

    Slide 22: Stage 3 Expansion Process Plant

    Stage 3 Expansion Process Plant TSX: KNT OTCQX: KNTNF New 1.2 Mtpa Process Plant Fully Operational Since December 2025 22

  23. Slide 23: Ancillary Construction Projects Progressing Well

    Slide 23: Ancillary Construction Projects Progressing Well

    Ancillary Construction Projects Progressing Well TSX: KNT OTCQX: KNTNF Warehouse Construction - Complete New Kumian Creek Camp – Complete (Further Expansion In Progress) Primary Standby Power Station - Complete New Maintenance Facilities - Complete Phase 1 Expansion Complete (10.7 MW Prime Power Out

  24. Slide 24: Stage 3 Expansion Update – Underground Paste System Advancing

    Slide 24: Stage 3 Expansion Update – Underground Paste System Advancing

    Stage 3 Expansion Update – Underground Paste System Advancing TSX: KNT OTCQX: KNTNF 1. Tailings Filtration Plant 3. Underground Paste Plant 2. Surface Storage System Near Portal Tailings filtration plant commissioning is complete, with the surface storage system and underground paste plant on schedu

  25. Slide 25: Tailings Filter Plant Commissioning Complete

    Slide 25: Tailings Filter Plant Commissioning Complete

    Tailings Filter Plant Commissioning Complete TSX: KNT OTCQX: KNTNF Tailings Filter Plant Filter Press Commissioning Tailings Filter Plant commissioning complete, with optimization ongoing. First filter cake produced in late April. Once fully operational, the pastefill system will divert a majority o

  26. Slide 26: Pastefill Plant Infrastructure Construction Advancing

    Slide 26: Pastefill Plant Infrastructure Construction Advancing

    Pastefill Plant Infrastructure Construction Advancing TSX: KNT OTCQX: KNTNF Surface Binder Blending Plant Near Portal Underground Silo Chamber 1205 Hopper Paste Pumps Paste Mixer Structural, mechanical and piping works are complete at the Surface Binder Blending and Filter Cake Storage areas, with c

  27. Slide 27: Major Improvements to Mine-Mill Transport Capacity

    Slide 27: Major Improvements to Mine-Mill Transport Capacity

    Major Improvements to Mine-Mill Transport Capacity TSX: KNT OTCQX: KNTNF Kasese River Crossing - Complete Baupa Bridge - Complete New 60 t Surface Haul Truck 10m Diameter Culvert Pre-backfill Kokomo Bridge - Complete River crossing upgrades are complete, and haul road upgrades are nearing completion

  28. Slide 28: Multiple High Priority Near-Mine Targets

    Slide 28: Multiple High Priority Near-Mine Targets

    Multiple High Priority Near-Mine Targets TSX: KNT OTCQX: KNTNF Multiple High Priority Near-Mine Vein and Porphyry Targets Airborne Geophysics and Target Locations Kora & Kora Deeps (Vein) 1 • Kora open to depth and along strike Kora South & Judd South (Vein) 2 • • Structure extends +1km beyond minin

  29. Slide 29: Exploration Target: Kora, Kora South, Kora North & Kora Deeps

    Slide 29: Exploration Target: Kora, Kora South, Kora North & Kora Deeps

    Exploration Target: Kora, Kora South, Kora North & Kora Deeps TSX: KNT OTCQX: KNTNF Kora Deeps Drilling Has Commenced Targeting to 500m RL over the next 12 months Multiple Highly Prospective Exploration Fronts Being Drilled Concurrently Kora Deeps, Kora North and South Deeps Underway from Twin Incli

  30. Slide 30: Judd and Judd South Vein System is Very Underexplored

    Slide 30: Judd and Judd South Vein System is Very Underexplored

    Judd and Judd South Vein System is Very Underexplored TSX: KNT OTCQX: KNTNF Judd Deeps Drilling Has Commenced Targeting to 500m RL over the next 12 months Judd is Sparsely Drilled, Has at Least 4 Known Veins and Open in All Directions Significant Amount of Drilling Completed Since the Judd Resource

  31. Slide 31: Copper Grade Tenor Increasing to the South towards A1 Porphyry

    Slide 31: Copper Grade Tenor Increasing to the South towards A1 Porphyry

    Copper Grade Tenor Increasing to the South towards A1 Porphyry TSX: KNT OTCQX: KNTNF K2 Vein Copper Grade (%) Long-Section (Looking West) K1 Vein Copper Grade (%) Long-Section (Looking West) Copper grades and tenor continue to increase south toward A1 with the K1 Vein returning higher copper grades

  32. Slide 32: High Priority Exploration Targets: Arakompa and Maniape

    Slide 32: High Priority Exploration Targets: Arakompa and Maniape

    High Priority Exploration Targets: Arakompa and Maniape TSX: KNT OTCQX: KNTNF Arakompa and Maniape Veins Key Facts • Arakompa – Sparsely drilled, open along strike, at depth and along its width • Located ~4.5km from Kainantu process plant, with similar mineralization to the producing high-grade Kora

  33. Slide 33: Sizeable Bulk Tonnage Zone Defined & Porphyry-Style Mineralization Discovered

    Slide 33: Sizeable Bulk Tonnage Zone Defined & Porphyry-Style Mineralization Discovered

    Sizeable Bulk Tonnage Zone Defined & Porphyry-Style Mineralization Discovered TSX: KNT OTCQX: KNTNF Arakompa Project is Very Large: +2km Strike, +800m Vertical and +400m Wide Corridor – Open Along Strike, Depth & Width Latest drilling expanded the near-surface high-grade bulk zone, including 99.0m a

  34. Slide 34: Two Major High-Grade Veins Confirmed to Date – AR1 and AR2

    Slide 34: Two Major High-Grade Veins Confirmed to Date – AR1 and AR2

    Two Major High-Grade Veins Confirmed to Date – AR1 and AR2 TSX: KNT OTCQX: KNTNF Drilling at Arakompa has delineated two major sub-parallel veins AR1 and AR2, defined over extensive strike and depth AR1 near-surface high-grade zone outlined in long section spans up to 300m vertically and up to 400m

  35. Slide 35: Arakompa is Growing Very Rapidly

    Slide 35: Arakompa is Growing Very Rapidly

    Arakompa is Growing Very Rapidly TSX: KNT OTCQX: KNTNF Feb 2024 June 2024 Oct 2024 Feb 2025 Sept 2025 June 2026 (2 Holes Reported) (11 Holes Reported) (30 Holes Reported) (43 Holes Reported) (67 Holes Reported) (100 Holes Reported) Arakompa is rapidly and efficiently growing through expansion of bul

  36. Slide 36: New Greenfields Discovery – Large Vein System at Wera

    Slide 36: New Greenfields Discovery – Large Vein System at Wera

    New Greenfields Discovery – Large Vein System at Wera TSX: KNT OTCQX: KNTNF Wera Vein System Key Facts • Wera – low-sulphidation epithermal gold system • Road accessible and located ~10km SW from Kora and Judd • Target identified from airborne geophysics MobileMT Survey and review of historical data

  37. Slide 37: Significant Pipeline of Highly Prospective Exploration Targets

    Slide 37: Significant Pipeline of Highly Prospective Exploration Targets

    Significant Pipeline of Highly Prospective Exploration Targets TSX: KNT OTCQX: KNTNF Vein Targets Porphyry Targets Kora/Judd Skarn Operations Kora South / Epithermal & Skarn Judd South Current Exploration Focus Feasibility Exploration Planned Within 24 months Pre-Feasibility Concept Blue Lake Resour

  38. Slide 38: Appendix

    Slide 38: Appendix

    MINING INC.

  39. Slide 39: Management & Directors

    Slide 39: Management & Directors

    Management & Directors TSX: KNT OTCQX: KNTNF Management Team Board of Directors Mining professional with 19+ years of experience across mining capital markets, corporate strategy, Mineral engineer with 40+ years of global experience across project development, operations David Medilek technical and

  40. Slide 40: 2030 GHG Emissions Reduction Target

    Slide 40: 2030 GHG Emissions Reduction Target

    2030 GHG Emissions Reduction Target TSX: KNT OTCQX: KNTNF 40% lower carbon intensity compared to global average K92 has set a target to reduce Scope 1 and Scope 2 emissions by 25% on a business-as-usual basis by 2030 Kainantu has below industry average emissions and we are committed to improving our

  41. Slide 41: Kora Deposit Overview & Mining Conditions Summary

    Slide 41: Kora Deposit Overview & Mining Conditions Summary

    Kora Deposit Overview & Mining Conditions Summary TSX: KNT OTCQX: KNTNF Deposit: Intermediate Sulphidation Multiple sub-vertical Au-Cu-Ag sulphide veins Focus is on the K1 and K2 veins, with the system also hosting other veins and link structures AuEq Reserve Grade: 8.6g/t – 6.6g/t Au, 19g/t Ag, 1.1

  42. Slide 42: Judd Deposit Overview & Mining Conditions Summary

    Slide 42: Judd Deposit Overview & Mining Conditions Summary

    Judd Deposit Overview & Mining Conditions Summary TSX: KNT OTCQX: KNTNF Deposit: Intermediate Sulphidation Multiple sub-vertical Au-Cu-Ag sulphide veins, located ~150-200m east of Kora Focus is on the J1 vein, with the system also hosting at least three other veins AuEq Reserve Grade: 8.1g/t – 7.1g/

  43. Slide 43: Kora and Judd Independent Reserve Estimate

    Slide 43: Kora and Judd Independent Reserve Estimate

    Kora and Judd Independent Reserve Estimate TSX: KNT OTCQX: KNTNF Kora and Judd Deposit Reserve Summary (January/2024) Tonnes Gold Silver Copper Gold Equivalent mt g/t moz g/t moz % kt g/t moz Kora Deposit Proven 2.95 7.4 0.70 19 1.9 1.1 31 9.4 0.89 Probable 2.52 5.7 0.46 19 1.6 1.0 26 7.6 0.61 Prove

  44. Slide 44: Kainantu Consolidated NI 43-101 Resources

    Slide 44: Kainantu Consolidated NI 43-101 Resources

    Kainantu Consolidated NI 43-101 Resources TSX: KNT OTCQX: KNTNF Kora and Judd Deposit Resource Summary (September/2023) Tonnes Gold Silver Copper Gold Equivalent mt g/t moz g/t moz % kt g/t moz Kora Deposit Measured 3.7 8.7 1.0 21 2.5 1.2 45 11.0 1.3 Indicated 3.1 7.0 0.7 22 2.2 1.3 41 9.4 1.0 Measu

  45. Slide 45: Efficient and Systematic Exploration – Kora and Judd

    Slide 45: Efficient and Systematic Exploration – Kora and Judd

    Efficient and Systematic Exploration – Kora and Judd TSX: KNT OTCQX: KNTNF M&I – Kora and Judd (moz AuEq) Inferred – Kora and Judd (moz AuEq) Total – Kora and Judd (moz AuEq) (1) Production Depletion M&I Inferred Production Depletion 8.0 7.4 moz 0.3 moz 9.2 g/t 7.0 6.0 4.5 moz AuEq, 8.5g/t 4.5 moz 4

  46. Slide 46: Latest Drilling Results Kora-Kora South – K1 Vein (February 18, 2026)

    Slide 46: Latest Drilling Results Kora-Kora South – K1 Vein (February 18, 2026)

    Latest Drilling Results Kora-Kora South – K1 Vein (February 18, 2026) TSX: KNT OTCQX: KNTNF Key Facts • All holes intersected mineralization • High-grade zone extended up-dip from main underground mining area with higher grades than resource model in multiple zones, including: • KMDD0893 – 4.95 m at

  47. Slide 47: Latest Drilling Results Kora-Kora South – K2 Vein (February 18, 2026)

    Slide 47: Latest Drilling Results Kora-Kora South – K2 Vein (February 18, 2026)

    Latest Drilling Results Kora-Kora South – K2 Vein (February 18, 2026) TSX: KNT OTCQX: KNTNF Key Facts • All holes intersected mineralization • Dilatant zone now defined 100 m along strike by 200 m vertical extent, located ~50m from existing underground infrastructure — supporting near-term bulk mini

  48. Slide 48: Latest Drilling Results Judd-Judd South – J1 Vein (February 18, 2026)

    Slide 48: Latest Drilling Results Judd-Judd South – J1 Vein (February 18, 2026)

    Latest Drilling Results Judd-Judd South – J1 Vein (February 18, 2026) TSX: KNT OTCQX: KNTNF Key Facts • All holes intersected mineralization • Multiple thick, high-grade intercepts at Judd Deeps up to 300 m below the Twin Incline and 350 m below the MRE, defining 450 m of strike to date, remaining o

  49. Slide 49: Airborne Geophysics Identifies Many New Targets

    Slide 49: Airborne Geophysics Identifies Many New Targets

    Airborne Geophysics Identifies Many New Targets TSX: KNT OTCQX: KNTNF Key Facts • Advanced MobileMT deep penetrating airborne geophysics flown over the entire ~830 km2 land package • First major geophysics program completed on property in +10 years • Results demonstrate an extensive untested potenti

  50. Slide 50: Blue Lake Porphyry Project - Significant Potential to Grow Resource Size

    Slide 50: Blue Lake Porphyry Project - Significant Potential to Grow Resource Size

    Blue Lake Porphyry Project - Significant Potential to Grow Resource Size TSX: KNT OTCQX: KNTNF 14.6 moz AuEq / 2.9 blbs CuEq Maiden Inferred Resource Declared in August 2022 Grade Tenor Increasing with Depth & High Grade Potassic Core is Open at Depth Note: Estimates are based on Technical Report ti

  51. Slide 51: Blue Lake Porphyry Project – 14.6 moz Maiden Resource (August 2022)

    Slide 51: Blue Lake Porphyry Project – 14.6 moz Maiden Resource (August 2022)

    Blue Lake Porphyry Project – 14.6 moz Maiden Resource (August 2022) TSX: KNT OTCQX: KNTNF Blue Lake Resource Summary (August 2022) Large 14.6 moz AuEq Inferred Resource Tonnes Gold Silver Copper Gold Equivalent mt g/t moz g/t moz % mt g/t moz Blue Lake Inferred 686 0.19 4.2 2.4 53.6 0.21 1.4 0.66 14

  52. Slide 52: Kora and Judd Highlight Intersections From Presentation Images

    Slide 52: Kora and Judd Highlight Intersections From Presentation Images

    Kora and Judd Highlight Intersections From Presentation Images TSX: KNT OTCQX: KNTNF Interval True width True width True width Drill Hole ID Gold g/t Silver g/t Copper % Gold Eq Drill Hole ID Interval (m) Gold g/t Silver g/t Copper % Gold Eq Drill Hole ID Interval (m) Gold g/t Silver g/t Copper % Go

  53. Slide 53: Arakompa Highlight Intersections From Presentation Images

    Slide 53: Arakompa Highlight Intersections From Presentation Images

    Arakompa Highlight Intersections From Presentation Images TSX: KNT OTCQX: KNTNF True True True True True Interval Interval Interval Interval Copper From Interval True Interval Hole_ID From (m) To (m) width Gold g/t Silver g/t Copper % Gold Eq Hole_ID From (m) To (m) width Gold g/t Silver g/t Copper

  54. Slide 54: David Medilek, P.Eng., CFA CEO & Director

    Slide 54: David Medilek, P.Eng., CFA CEO & Director

    David Medilek, P.Eng., CFA CEO & Director Contact: E-mail: dmedilek@k92mining.com Phone: +1 (604) 416 4445