  1. Slide 1: Hamilton Works Community Liaison Committee (CLC) Meeting

    Hamilton Works Community Liaison Committee (CLC) Meeting April 20, 2022 1

  2. Slide 2: Agenda

    Agenda 1. Welcome 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 26 Jan 2022 Meeting 4. Coke Battery Performance 5. Dock Dredging 6. Community Feedback 7. Adjournment 2

  3. Slide 3: Agenda

    Agenda 1. Welcome 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 26 Jan 2022 Meeting 4. Coke Battery Performance 5. Dock Dredging 6. Community Feedback 7. Adjournment 3

  4. Slide 4: Coke Battery Performance – Method 303: Daily Performance Review

    Coke Battery Performance – Method 303 Performance Review – Daily (Q1 2022) Doors Lids Off-takes Date (% Leaks) (% Leaks) (% Leaks) 2015 Thresholds 54% 2% NA (July 2 start) 2016 Thresholds 32% 2% NA 2017-2019 Thresholds 10% 2% 5% 2020 - 2022 Thresholds 5% 1% 4% Jan – Mar 2022 Range 0 – 11.6% 0 – 0.50

  5. Slide 5: Coke Battery Performance – Method 303: Rolling Average Review

    Coke Battery Performance – Method 303 Performance Review – 30-Day Rolling Avg. (Q1 2022) Doors Lids Off-takes Charging (sec) Date (% Leaks) (% Leaks) (% Leaks) (log avg) 2015 Limits (July 2 start) 38% 0.8% 25% 12 sec 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 - 2022 Limi

  6. Slide 6: Coke Battery Performance – Method 303: Daily Observations

    Coke Battery Performance – Method 303 Performance Review – Daily Observations (Q1 2022) Pushing Emission Date (opacity %) 2015 Threshold (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 - 2022 ≥ 30% Jan - Mar 2022 0 – 36.67% Range (6.65%) (Average) Jan - Mar Operational Adjustments • 2 operati

  7. Slide 7: Coke Battery Performance: Additional Items

    Coke Battery Performance Additional Items • Community Feedback • There was no community feedback received by Stelco in Q1 2022 • MECP to provide verbal comments 7

  8. Slide 8: Agenda

    Agenda 1. Welcome 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 26 Jan 2022 Meeting 4. Coke Battery Performance 5. Dock Dredging 6. Community Feedback 7. Adjournment 8

  9. Slide 9: Dredging #3 Dock: Background

    Dredging #3 Dock Background • Sediment build up along west end of #3 Dock has restricted navigational path for vessels at Stelco • Affected channel is in Stelco water lot • Stelco has retained a third party coastal engineering firm to study, evaluate, recommend and oversee project including to: • Co

  10. Slide 10: Pre-Assessment Survey

    Pre-Assessment Survey Complete • Survey indicated the shoreline erosion has restricted channel’s navigation path • Dredging to be conducted using a high reach excavator from shore or a barge • The dredged material to be placed upland on Stelco property • Permits for conducting maintenance dredging h

  11. Slide 11: Status of Activities

    Status of Activities • Selection of the dredging contractor in progress • Stelco will select a dredging contractor based on receiving proposals from the bidders and the consultant’s recommendation • Monitoring and controls • The turbidity monitoring will be in place at 100m from the dredging locatio

  12. Slide 12: Agenda

    Agenda 1. Welcome 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 26 Jan 2022 Meeting 4. Coke Battery Performance 5. Dock Dredging 6. Community Feedback 7. Adjournment 12

  13. Slide 13: Agenda

    Agenda 1. Welcome 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 26 Jan 2022 Meeting 4. Coke Battery Performance 5. Dock Dredging 6. Community Feedback 7. Adjournment 13