Ssr Mining Inc. · NASDAQ:SSRM
Ssr Mining — BMO Capital Markets 27th Global Metals & Mining Conference 2018
54 slides from Ssr Mining's conference presentation, Feb 27, 2018
Slide 1: A Track Record of Creating Value
A TRACK RECORD OF CREATING VALUE February 2018
Slide 2: Cautionary Notes
Cautionary Notes SSRM:NASDAQ/TSX PAGE 2
Slide 3: Why SSR Mining?
Why SSR Mining? A long-term track record of creating value Strong platform in favorable 1 jurisdictions Track record of creating Track record 6 2 shareholder of delivery value Leveraged to Track record gold with of growth and 5 3 attractive decreasing liquidity Track record costs of free cash flow 4
Slide 4: Strong Operating Platform in Favorable Jurisdictions
1 Strong Operating Platform in Favorable Jurisdictions +8 year mine life expected at all three operations Marigold Seabee Puna Nevada: Saskatchewan: Argentina: Favorable #3 ranked #2 ranked +10 year operating Jurisdictions globally globally history 73K Diversified oz AuEq 202K Production oz Au 84K o
Slide 5: Track Record of Delivery
2 Track Record of Delivery Six-year history of meeting or exceeding guidance Reliable trend of delivering more …at lower cash costs with less gold… variability 450 1,200 400 1,100 Gold-Equivalent Cash Costs ($/oz) Gold-Equivalent Production (K oz) 1,000 350 900 300 800 250 700 200 600 Production Gui
Slide 6: Track Record of Growth and Decreasing Costs
3 Track Record of Growth and Decreasing Costs 500 $1,200 $1,000 400 Gold-Equivalent Cash Costs ($/oz) Gold-Equivalent Production (K oz) $800 300 $600 200 $400 100 $200 0 $0 2012A 2013A 2014A 2015A 2016A 2017A 2018E 2019E 2020E 2021E Puna Marigold Seabee Cash Costs Strong Outlook +27% near-term incre
Slide 7: Track Record of Free Cash Flow Generation
4 Track Record of Free Cash Flow Generation $500 $400 Acquired Acquired Marigold Seabee Cash and Cash Equivalents ($M) for $268M (all shares) in cash $300 $200 $100 $0 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 2014 2014 2014 2014 2015 2015 2015 2015 2016 2016 2016 2016 2017 2017 2017 2017 Ops
Slide 8: Leveraged to Gold with Attractive Trading Liquidity
5 Leveraged to Gold with Attractive Trading Liquidity 2.78 2.70 2.70 2.57 2.56 2.25 2.12 2.12 Beta to Gold Price 2.08 2.03 1.93 1.91 1.88 SSR Coeur McEwen B2Gold Fortuna Detour Hecla New Gold Torex Eldorado Tahoe Klondex Oceana Mining 2.3% 2.2% Daily Volume (% of shares out) 1.9% 1.3% 1.3% 1.2% 1.1%
Slide 9: Track Record of Creating Net Asset Value Per Share
6 Track Record of Creating Net Asset Value Per Share 12 11 +61% 10 Net Asset Value ($/sh) 9 8 7 +1% 6 5 4 Dec-14 Jun-15 Dec-15 Jun-16 Dec-16 Jun-17 Dec-17 SSR Mining Peer Index Creating Value Operational Excellence and disciplined M+A are key differentiators Notes: Peer index represents an equal wei
Slide 10: 2018 Production and Cash Costs Guidance
2018 Production and Cash Costs Guidance Marigold Seabee Puna SSR Mining (75% interest) Gold Gold Silver Gold Equivalent Production 190K – 210K oz 85K – 92K oz 2.3M – 3.3M oz 305K – 345K oz Cash Costs $725/oz – $775/oz $560/oz – $610/oz $12.50/oz – $15.00/oz $705/oz – $760/oz (US$/oz) Mid-point Guida
Slide 11: Marigold Mine Update
MARIGOLD MINE UPDATE GROWTH IN NEVADA
Slide 12: Marigold: Operating Outlook
Marigold: Operating Outlook 2018 2019 2020 2021 Gold production (Koz) 190 – 210 225 – 235 205 – 215 230 – 240 Cash costs ($/oz) $725 – $775 $740 – $790 $660 – $710 $550 – $600 Capital investment ($M) $57 $25 $20 $25 Capitalized deferred stripping ($M) $15 $15 $30 $70 Expanding Margins Forecast avg.
Slide 13: Gold Mineral Reserves and Mineral Resources
Marigold Mineral Reserves and Resources Increased Y-o-Y Mineral Reserves gold grade increased to 0.46 g/t 7 0.63 5.66 Gold Mineral Reserves and Mineral Resources 6 5 (million ounces) 4 0.36 3.19 2.84 (0.22) 0.21 3 2 1 0 2016 Depletion Model Exploration 2017 2017 M+I 2017 Reserves Assumptions Reserve
Slide 14: Marigold: Exploration Success and Resource Conversion
Marigold: Exploration Success and Resource Conversion 8N TZN 8S 8SX N Red HideOut Dot North Leach Pad Red Dot MUD Waste Valmy Mackay reserve pit outline Current mining area Basalt-Antler SSRM:NASDAQ/TSX PAGE 14
Slide 15: Marigold: Exploration Success and Resource Conversion
Marigold: Exploration Success and Resource Conversion TZN 8D 8S 8SX N Red HideOut Dot North Leach Pad A’ EOY 2017 EOY 2017 February 2018 Original Gold Grade Mackay Pit Surface A Surface Model Reserve Pit EOY 2017 Resource Pit Shell Gold Grade (g/t) < 0.06 MRA6461 0.06 – 0.6 35.1 m at 0.86 g/t 0.6 –
Slide 16: Marigold: Equipment Replacement Study
Marigold: Equipment Replacement Study In 2019, evaluate mine fleet investment plan Scenario A: Replace existing mine fleet with like-for-like equipment consistent with current life of mine plan Scenario B: Expand mine fleet with additional rope shovel, haul trucks and related support gear potent
Slide 17: Marigold: Opportunities
Marigold: Opportunities Continue to deliver robust operating margins Additional hauling capacity and equipment replacement study Mine-life extension through exploration at Valmy, East Basalt and Red Dot 2018 exploration budget of $9M, 80% increase from 2017 Deep sulphide exploration SSRM:N
Slide 18: Seabee Gold Operation Update
SEABEE GOLD OPERATION UPDATE HIGH GRADE GOLD MINE
Slide 19: Seabee Mineral Reserves Increased 21% Y-o-Y
Seabee Mineral Reserves Increased 21% Y-o-Y Gold grade increased to 9.9 g/t 500 166 437 400 361 (92) Gold Mineral Reserves (thousand ounces) 300 200 100 0 2016 Depletion Exploration 2017 Reserves Reserves Notes: Mineral Reserves are based on $1,250/oz gold price assumption. Gold Proven and Probable
Slide 20: Seabee Mineral Resources Increased 19% Y-o-Y
Seabee Mineral Resources Increased 19% Y-o-Y 674 1,200 Gold Mineral Resources (thousand ounces) 800 199 681 574 (92) 400 0 2016 M+I Depletion Exploration 2017 M+I 2017 Resources Resources Inferred Resources Notes: Measured and Indicated Mineral Resources are inclusive of Mineral Reserves. Mineral Re
Slide 21: Increasing Production at Lower Costs
Increasing Production at Lower Costs 140 $1,200 Acquired 120 120 the Seabee Gold Operation May 31, 2016 $1,000 108 $998 $954 100 100 89 $800 Cash Costs ($/oz gold) 84 77 Gold Production (k oz) 80 $757 75 $663 $600 63 $602 $585 60 $525 $540 50 $504 45 $442 $400 40 $200 20 0 $0 2012A 2013A 2014A 2015A
Slide 22: Operational Excellence Driving Seabee Mill Improvements
Operational Excellence Driving Seabee Mill Improvements Step-change tonnage improvements since acquisition 1,200 1,100 Mill test trials 1,000 Forest fires Mill Dry Tonnes per Day 900 800 700 Decreased stope production 600 500 400 Jan-16 Mar-16 May-16 Jul-16 Sep-16 Nov-16 Jan-17 Mar-17 May-17 Jul-17
Slide 23: Year End 2017 Santoy Mineral Resources
Year End 2017 Santoy Mineral Resources Santoy Gap (9A, 9B, 9C) Santoy 8A 0m Elev 1.3m at 14.4g/t 5.8m at 6.4g/t (SUG-17-047) (SUG-17-042) 2.1m at 52.8g/t (JOY-16-701) Gap HW 9.9m at 8.2g/t (JOY-16-749) 2.8m at 26.6g/t (SUG-17-300) -400m Elev 2.1m at 10.8g/t 5.5m at 12.4g/t (SUG-17-919) 6.3m at 7.43g
Slide 24: Large, Contiguous Land Package
Large, Contiguous Land Package 23,300 Hectare land package at Seabee Carr target Seabee Mine/Mill Airstrip & camp Santoy Mine Fisher Exploration Camp 34,000 Hectare land package at Fisher Project (option agreement) 10 km All weather road Gold occurrence Santoy shear zone SSRM:NASDAQ/TSX PAGE 24
Slide 25: Seabee: Opportunities
Seabee: Opportunities Deliver on PEA expansion case to 1,050 tpd Drive Operational Excellence initiatives Evaluate sustained milling throughput of 1,200 tpd 80% increase in exploration budget to $9M in 2018 Santoy Gap Hanging Wall Carr target Seabee Gold Operation Flin Flon Fisher exte
Slide 26: Puna Operations Update
PUNA OPERATIONS UPDATE LARGE-SCALE SILVER PRODUCER
Slide 27: Puna Operations: Near-Term Production Growth by 2019
Puna Operations: Near-Term Production Growth by 2019 Significant LOM silver exposure and base metals by-product credit 8 $16 $14.48 6.8 6.9 6.9 $14 7% $12.19 Zinc 6 $12 Silver-Equivalent Cash Costs ($/oz) Silver Equivalent Production (Moz) 21% $11.09 $10 Lead $10.16 72% 4 $8 Silver 3.4 $6 2 $4 $2 0
Slide 28: Puna Operations Looking ahead to 2018
Puna Operations Looking ahead to 2018 Chinchillas: ‘brownfields-like’ development for near-term production growth Chinchillas Environmental Impact Assessment approved December 2017 Construction initiated at Chinchillas Q1 2018 First ore production expected H2 2018 2018 operating guidance (
Slide 29: Portfolio Rationalization
Portfolio Rationalization Maximizing value of portfolio with property sales 10 2 7 8. Maverick Springs 1 8 Brucejack 9. San Marcial 1. Marigold 7. Amisk Snowfield 2. Seabee 9 (Pretium) 5. San Luis 6 10. Sunrise Lake 3. Puna Operations Berenguela (Chinchillas) Diablillos Candelaria 4. Puna Operations
Slide 30: SSR Mining Inc. Delivering value and growth for our shareholders
SSR Mining Inc. Delivering value and growth for our shareholders Met or exceeded production guidance six consecutive years Production and Free Cash Flow Production growth to +410,000 oz AuEq by 2021 Growth First ore production at Chinchillas H2 2018 Ramp up at Seabee to 1,050 tpd in 2019 Nea
Slide 31: Value & Growth
Value & Growth SSRM:NASDAQ/TSX PAGE 31
Slide 32: Marigold: Large Scale, Low-Cost Producer
Marigold: Large Scale, Low-Cost Producer Open pit, run-of-mine heap leach gold operation Produced 202,240 ounces of gold in 2017 at cash costs of $647 per ounce Q4 gold production of 52,768 ounces Twin Creeks Goldstrike ~200,000 tonnes of material moved per day MARIGOLD Maverick Springs Phoe
Slide 33: Marigold Mine: Heap Leach Process
Marigold Mine: Heap Leach Process Once ore is loaded on the heap leach pad … Average time to achieve primary recovery of +50% is 90 to 120 days Average time to achieve overall recovery of 73% is seven to nine months Most important factor to leach recovery time is loaded ore to ‘plastic’ dist
Slide 34: Seabee: Overview
Seabee: Overview High-margin underground operation in a stable jurisdiction High-grade, underground mine in Saskatchewan, Canada Strong safety and environmental practices Large underexplored land position of +57,000 ha Mill operated at 905 tpd in 2017, including record throughput of 970 tpd
Slide 35: Seabee: Value Creation Opportunity
Seabee: Value Creation Opportunity Seabee Island Gold Lamaque Nevada Operations (SSR Mining) (Alamos Gold) (Eldorado Gold) (Klondex Mines)⁴ Average Mill Throughput (tpd) 1,050 1,100 1,675 899 Average Milled Grade (g/t) 8.3 9.7 7.0 17.2 Mine Life (years) 7 8 10 n.a. Gold Recovery (%) 96.5% 96.5% 93.6
Slide 36: Seabee: Preliminary Economic Assessment
Seabee: Preliminary Economic Assessment Expanded margins from higher throughput and grade Increases mining rate by 21% to 1,050 tpd by 2019, compared to 2016 Mines 62% of Inferred Mineral Resources Increases estimated LOM average gold production by 29% to 100,000 ounces per year (for the perio
Slide 37: Seabee: PEA Financial Summary and Sensitivity Analysis
Seabee: PEA Financial Summary and Sensitivity Analysis Cash Flows ($M) Pre-tax NPV (5%) Sensitivities ($M) Net Revenue $893.5 Gold Price ($/oz) Operating Costs $(346.0) $1,200 $1,300 $1,400 Royalties and Other $(28.5) 1.20:1 $289 $346 $403 Canadian Δ in Working Capital $10.3 Exchange 1.25:1 $307 $36
Slide 38: Seabee: PEA Capital Cost Summary
Seabee: PEA Capital Cost Summary PEA Outlines a seven-year mine plan Utilizes current infrastructure to reduce infrastructure capital of $50M through 2022 Capitalized development totals $23M through seven-year outlook Capitalized exploration of $16M to convert Mineral Resources 2018 2019 2020
Slide 39: Seabee: PEA Operating Cost Summary
Seabee: PEA Operating Cost Summary By process and by cost category (life of mine) $/tonne milled Mine G&A Operations 40% 45% Mining 1 $58 Processing $20 Processing 15% G&A $52 Other Site Costs 13% Fuel Total $130 6% Labour Power 38% 7% Consumables 15% Note: Total estimated operating costs in the Sea
Slide 40: Carr Exploration Target
Carr Exploration Target Similarities to Santoy emerging Long section looking west with vertical projection of intercepts on the 50 degree dipping inclined (plane dips to the east) South CAR-17-014 CAR-16-003 SAN-97-004 North _0m 31.64 g/t over 1.10 m 6.28 g/t over 1.50 m 9.03 g/t over 2.47 m CAR-1
Slide 41: Fisher Project: Exploration Overview
Fisher Project: Exploration Overview Extension of the Pine Lake Greenstone Belt and the Santoy Shear Four-year option agreement to earn up to 80% Santoy Mine Work completed in 2017 Geochemistry (soils and till) Structural mapping Prospecting Drone-based magnetic survey Santoy Shear D
Slide 42: Puna Operations Joint Venture
Puna Operations Joint Venture Brownfields development for Pirquitas operating life extension SSR Mining is the JV operator with a 75% interest JV includes Chinchillas, a silver-lead-zinc deposit, and the Pirquitas plant and facilities located 45 km away Chinchillas construction initiated Q1 20
Slide 43: Chinchillas Project: Data Sheet
Chinchillas Project: Data Sheet (100% Basis) Near-term Production with Positive Pre-Feasibility Results Mine life: 8 years N Total material mined: 66.6 M tonnes Strip ratio: 4.7 Processing rate: 4,000 tpd 6.1 Moz Silver Average annual 35.0 Mlb Lead production (8 years active mining): 12.3 Mlb Zinc 8
Slide 44: Pirquitas Underground Opportunity
Pirquitas Underground Opportunity Focused on Mine Life Extension Potential small-scale, high-grade ore feed from the Chocaya, Oploca and Cortaderas veins Positive drill results from 2015 drill program: 3.16 meters at 1,436 g/t silver 1.93 meters at 1,890 g/t silver 0.83 meters at 2,670 g/t
Slide 45: SIB Project
SIB Project Under-explored, high-grade gold-silver target in a prolific district Precious-metals-enriched VMS target Eskay Creek Generalized Section similar to the Eskay Creek mine A A’ SIB property past drilling Lulu Zone 14 meters at 14.4 g/t Au and 1,060 g/t Ag Extension below a fault 2
Slide 46: San Luis Project
San Luis Project: A unique high-grade gold reserve with exploration upside Pitarrilla Project: Large undeveloped silver resource San Luis Project Pitarrilla Project Feasibility Study Results (June 2010) Feasibility Study Results (December 2012) Mine life: 3.5 years Mine life: 32 years Average annual
Slide 47: Mineral Reserves
Mineral Reserves (as of December 31, 2017) SSRM SSRM Location Tonnes Silver Gold Lead Zinc SSRM Interest Interest % Silver Gold millions g/t g/t % % Interest million oz million oz Proven Mineral Reserves Seabee Canada 0.26 7.58 100 0.06 Chinchillas Argentina 1.64 180 0.75 0.42 75 7.1 Total 7.1 0.06
Slide 48: Mineral Resources: Measured and Indicated
Mineral Resources: Measured and Indicated (as of December 31, 2017) SSRM SSRM Location Tonnes Silver Gold Lead Zinc SSRM Interest Interest % Silver Gold millions g/t g/t % % Interest million oz million oz Measured Mineral Resources (Inclusive of Proven Mineral Reserves) Seabee Canada 0.57 9.29 100 0
Slide 49: Mineral Resources: Inferred
Mineral Resources: Inferred (as of December 31, 2017) SSRM SSRM Location Tonnes Silver Gold Lead Zinc SSRM Interest Interest % Silver Gold millions g/t g/t % % Interest million oz million oz Inferred Mineral Resources Marigold U.S. 49.70 0.41 100 0.63 Seabee Canada 2.26 9.29 100 0.67 Chinchillas Arg
Slide 50: Reserves and Resources Notes to Tables
Reserves and Resources Notes to Tables All estimates set forth in the Mineral Reserves and Mineral Resources table have been prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). The estimates of Mineral Reserves and Mineral Resources fo
Slide 51: SSR Mining Inc. Strong governance rating
SSR Mining Inc. Strong governance rating Source: FactSet, ISS and BMO Capital Markets as of August 25, 2017. SSRM:NASDAQ/TSX PAGE 51
Slide 52: SSR Mining Executive Team and Board of Directors
SSR Mining Executive Team and Board of Directors Depth of experience and a top governance rating Paul Benson Nadine J. Block W. John DeCooman, Jr. Gregory J. Martin Alan N. Pangbourne President and CEO VP, Human Resources VP, Business Development SVP and CFO COO and Strategy Michael Anglin Brian Boo
Slide 53: Share capital structure, convertible note and top shareholders overview
SSR Mining Inc. Share capital structure, convertible note and top shareholders overview Top 10 Shareholders % of Shares Outstanding Institutional Holdings by Country Van Eck 12.0% 15% Renaissance Technologies 4.3% United States Sun Valley Gold 3.2% 11% Canada Investec Asset Management 2.6% United Ki
Slide 54: SSR Mining Inc.