Sarama Resources Ltd. · TSXV:SWA

Sarama Resources — Investor Presentation (April 2025)

14 slides from Sarama Resources's investor presentation, April 2025

  1. Slide 1: Sarama Resources

    ASX: SRR TSX-V: SWA SARAMA RESOURCES WEST AUSTRALIAN GOLD EXPLORER HIGHLY PROSPECTIVE LAND HOLDINGS + SUBSTANTIAL ARBITRATION CLAIM APRIL 2025 0

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS Information in this presentation that is not a statement of historical fact constitutes forward-looking information. Such forward-looking information includes, but is not limited to, information with respect to Sarama Resources Ltd’s (“Sarama” or the “Company”) planned exp

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS Exploration * 2 • Control of two belt-scale projects covering 1,000km in prolific Laverton Gold District • Gold projects have over 100 kilometres of strike in greenstone terrain open for exploration • Near 8Moz Gruyere Gold Mine and the 1Moz Golden Highway Project • Region lock

  4. Slide 4: Eastern Goldfields Project Location

    EASTERN GOLDFIELDS PROJECT LOCATION LOOKING FOR GOLD IN A DISTRICT HIGHLY ENDOWED WITH GOLD 400000 500000 600000 Bronzewing Bellevue Leinster Darlot Garden Well 2.5Moz Gruyere 6900000 >8Moz Agnew Thunderbox Golden Highway >11Moz >6Moz 1Moz +35Moz Au Cosmo Project Gilmore 50km 0.3Moz Koth Laverton >3

  5. Slide 5: Exploration Opportunity

    EXPLORATION OPPORTUNITY FAVOURABLE LITHO-STRUCTURAL DOMAIN, SIGNIFICANT GOLD SHOWINGS & SCALE 500000 600000 580km2 420km2 • Both gold projects located in greenstone belts with strong geological & structural similarities to the adjacent Dorothy Hills Great Central Road Greenstone Belt which hosts Gru

  6. Slide 6: Cosmo Project

    COSMO PROJECT READY FOR A MAJOR GOLD DISCOVERY • Belt scale covering 580km2 of Cosmo Newbery Greenstone Belt • Belt has historic gold showings and strong geological and structural similarities to the Dorothy Hills Greenstone belt which hosts the +8 Moz Gruyere Gold Deposit • Project is underlain by

  7. Slide 7: Cosmo Project – Historical Workings

    COSMO PROJECT – HISTORICAL WORKINGS • Gold first discovered the in the early 1900’s • Multiple shafts and workings mapped • Reports indicate very high grades mined • Mined material historically taken to a stamp mill in Laverton • Old timers only interested in narrow, high- grade quartz veins • Unlik

  8. Slide 8: Cosmo Project – Target Generation

    COSMO PROJECT – TARGET GENERATION Gold-in Soils Cosmo Gold Project Central Project Area • Geophysics & gold-in-soil surveys to play a major role in targeting • Similar surface cover regime to Gruyere • Kilometre-scale gold-in-soil anomalies associated with historic workings, diverse lithologies & st

  9. Slide 9: Mt Venn Project

    MT VENN PROJECT UNDEREXPLORED BELT-SCALE OPPORTUNITY 420km2 600000 • Head of Agreement signed to acquire 80% interest in Mt Venn Project – completion anticipated in June 2025 • Belt scale covering 420km2 of Jutson Rocks Greenstone Belt Great Central Road • Located approximately 40km west of the +8Mo

  10. Slide 10: Mt Venn Project (cont.)

    MT VENN PROJECT (cont.) UNDEREXPLORED BELT-SCALE OPPORTUNITY • Prospective geological setting including a regional structural corridor extending 50km-long and 1-3km wide over the full length of the Jutson Rocks Greenstone Belt • Abundant exploration potential remains in the belt with historic explor

  11. Slide 11: Arbitration Claim

    ARBITRATION CLAIM SIGNIFICANT VALUE DRIVER • Sarama is pursuing a significant arbitration claim following the illegal withdrawal of its rights to the multi-million-ounce Tankoro Gold Deposit in Burkina Faso • Engagement of Boies Schiller Flexner with excellent track record of securing large settleme

  12. Slide 12: Corporate Overview

    CORPORATE OVERVIEW EXPERIENCED BOARD & MANAGEMENT TEAM BOARD CAPITAL STRUCTURE Andrew Dinning Executive Chairman Common Shares 361.1m Simon Jackson Non-Executive Director Warrants (‘in the money’) Nil(1) Adrian Byass Non-Executive Director Employee Options (3c ‘in the money’ exp 7/2027) 9.9m(1,2) Mi

  13. Slide 13: Company Outlook

    COMPANY OUTLOOK CONSOLIDATE NEW GOLD PROJECTS AND PROSECUTE ARBITRATION Cosmo and Mt Venn Gold Projects • Finalise Mt Venn Project acquisition • First round of soils completed and awaiting results • Continue comprehensive review of existing project data • Complete targeting exercise and generate new

  14. Slide 14: Andrew Dinning Executive Chairman

    Andrew Dinning Paul Schmiede Qualified and competent person’s statement Executive Chairman VP Corporate Development Scientific or technical information in this disclosure that relates to exploration is adinning@saramaresources.com pschmiede@saramaresources.com based on information compiled or approv

Sarama Resources — Investor Presentation (April 2025) on 6ix