  1. Slide 1: Australia's leading magnetite producer

    For personal use only Australia s leading Australia’s magnetite producer David Corr October 25, 2011 Chief Financial Officer

  2. Slide 2: Disclaimer

    Disclaimer For personal use only The material in this presentation (“material”) is not and does not constitute an offer, invitation or recommendation d ti tto subscribe b ib ffor, or purchase, h any security it iin G Grange R Resources Li Limited it d (“GRR”) nor does it form the basis of any contra

  3. Slide 3: Company Overview

    Company Overview For personal use only Grange remains G i AAustralia’s t li ’ lleading di magnetite tit pproducer. An ASX 300 index dividend ppaying y g company, with a strong balance sheet, no net debt, a large producing mine and a larger magnetite p j project. October 2011 Slide 3

  4. Slide 4: Magnetite – The premium iron ore

    Magnetite g – The p premium iron ore For personal use only Iron Ore Pellet Higher ~65-69% Fe ~US$200 FOB Tasmania Magnetite Concentrate ALITY ~67% Fe QUA Direct Shipping Lump ~63% Fe Direct Shipping Fines LLower ~62% Fe ~US$150 $ CFR China Lower Price Higher October 2011 Slide 4

  5. Slide 5: Company Snapshot

    Company p y Snapshot p For personal use only Current key statistics (A$) Current Ownership Structure Ordinary shares on Free float 24 October 2011 1,153m issue Last share price 24 October 2011 $0.445 33.83% PML 46.83% Market capitalization 24 October 2011 $513m RGL Group 7.84% Cash & Receivables 30

  6. Slide 6: Grange Board

    Grange g Board For personal use only Grange has a board with a diverse range of relevant experience. Xi Zhiqiang: Chairman Neil Chatfield: Deputy Chairman (Independent) ƒ Extensive experience in the Chinese steel industry ƒ Recently Executive Director and CFO of Toll Holdings, a position held ƒ Baos

  7. Slide 7: Jiangsu Shagang – Cornerstone Shareholder

    Jiangsu g g – Cornerstone Shareholder g Shagang For personal use only A strong partnership ƒ Grange’s G ’ llargestt shareholder h h ld ƒ Major customer with a LOM offtake agreement at Savage River at market prices. ƒ Agreement to negotiate at fair market price for Grange’s share of offtake from Asse

  8. Slide 8: Grange Resources: Australia's Leading Magnetite Producer

    Grange g Resources For personal use only Australia’s Leading Magnetite Producer Grange’ss position is supported by quality assets In Tasmania and Western Australia. Grange Australia Southdown Project (70%) Savage River (100%) ƒ 90km northeast of the ƒ Northwest Tasmania Port of Albany ƒ Annualised p

  9. Slide 9: Savage River Overview

    Savage River Overview For personal use only Ownership ƒ Grange 100% ƒ Mineral Resource of 306Mt magnetite at 52.3% Resources DTR and Reserves g ƒ Ore Reserve of 119Mt magnetite at 51.2% DTR ƒ 2.0 Mtpa blast furnace pellets (2011 guidance) Production ƒ Potential to expand to 2.6Mtpa Operating ƒ A$98/

  10. Slide 10: Savage River Large Scale Operations

    Savage River Large Scale Operations For personal use only October 2011 Slide 10

  11. Slide 11: Savage River Downstream Infrastructure

    Savage River Downstream Infrastructure For personal use only October 2011 Slide 11

  12. Slide 12: Savage River Port & Shiploading Infrastructure

    Savage River Port & Shiploading Infrastructure For personal use only October 2011 Slide 12

  13. Slide 13: Savage River Solid Customer Base

    Savage River Solid Customer Base For personal use only Long term offtake agreements – providing revenue stability Agreements are in place for both Savage River and Southdown production at index based market prices. prices Shagang ƒ China’s largest private steel mill, producing p of p 29Mtpa pig g ir

  14. Slide 14: Savage River - Leveraged to price

    Savage g River - Leveraged g to p price For personal use only Margin leverage to price @2.0Mtpa 500 450 September 2011 400 350 MARGIN A$ milliion 300 250 200 Revenue 150 C t Costs 100 120 130 140 150 160 170 180 190 200 210 220 230 Price US$/t October 2011 Slide 14

  15. Slide 15: September Quarter Summary

    September p Quarter Summaryy For personal use only Production and Production and Production and C t Costs C t Costs C t Costs September Quarter June Quarter September Quarter 2011 2011 2010 Total BCM Mined 3,184,680 4,103,863 4,055,157 Total Ore BCM 402,846 510,546 217,167 Weight Recovery (% DTR) 34

  16. Slide 16: September Quarter Summary

    September p Quarter Summaryy For personal use only Production and Production and Production and Costs Costs Costs September Quarter June Quarter September Quarter 2011 2011 2010 Total BCM Mined 3,184,680 4,103,863 4,055,157 Total Ore BCM , 402,846 510,546 , 217,167 , Weight Recovery (% DTR) 34.5 32.

  17. Slide 17: Magnetite Project Key Facts

    Southdown Magnetite g Project j Key y Facts For personal use only Ownership ƒ Grange 70%, Sojitz Corporation 30% Resources and ƒ Mineral Resource of 654Mt magnetite at 36.5% DTR1,2 Reserves1 ƒ Ore Reserve of 388Mt magnetite at 35.5% DTR1,3 ƒ Targeting 10Mtpa magnetite concentrate for premium Product

  18. Slide 18: Magnetite Project PFS Highlights

    Southdown Magnetite g Project j PFS Highlights g g For personal use only • Mine Capex, including infrastructure A$2.57 billion; • Operating costs per tonne of concentrate produced < A$60 per tonne;; • Positive NPV with favourable IRR; • Mine life of 19 19-40 40 years @10mtpa of concentrate; • Defini

  19. Slide 19: Magnetite Project Location Plan

    Southdown Magnetite g Project j Location Plan For personal use only October 2011 Slide 19

  20. Slide 20: Magnetite Project Orebody

    Southdown Magnetite g Project j Orebody y For personal use only 654 Mt at 36.5% magnetite October 2011 Slide 20

  21. Slide 21: Magnetite Project Resources and Reserves

    Southdown Magnetite g Project j Resources and Reserves For personal use only Mineral Resources Classification Measured Indicated Inferred Total Resources Tonnes (Mt) 219.7 210.3 224.4 654.4 DTC wt% 37.4 38.9 33.4 36.5 DTC Fe% 69.2 69.3 69.1 69.2 DTC SiO2% 1.72 1.94 2.07 1.91 DTC Al2O3% 1 43 1.43 1 2

  22. Slide 22: Magnetite Project Orebody Potential

    Southdown Magnetite g Project j Orebody y Potential For personal use only Short Term PFS Case Longg Term Potential D t il Details P t ti l Potential Western Resource Western/Eastern Resource Full Western Resource Mine Life 19 years 21 years 40 years Ore (million tonnes) 430 ~575 ~1,200 Ore Grade %DT

  23. Slide 23: Magnetite Project Mining

    Southdown Magnetite g Project j Mining g For personal use only ƒ Open pit mining ƒ Conventional bulk mining methods utilising Mi i M Mining Method th d hydraulic face shovels, dump trucks and drill and blast coupled to a Run of Mine (ROM) stockpile Material ƒ ~110 Mtpa for first six years Movement ƒ

  24. Slide 24: Magnetite Project Monster Pit

    Southdown Magnetite Project 12 kilometre Monster Pit For personal use only Southdown Open Pit Savage outline River Open Pit 3 Kilometres October 2011 Slide 24

  25. Slide 25: Magnetite Project Concentrator Flow Sheet

    Southdown Magnetite Project Concentrator Flow Sheet For personal use only October 2011 Slide 25

  26. Slide 26: Magnetite Project Product Quality

    Southdown Magnetite Project Product Quality For personal use only Southdown Magnetite Southdown Iron % % Concentrate Ore Pellets Total Fe 68.9 Total Fe 67 SiO2 1.56 B2 0.54 Al2O3 1.45 SiO2+Al2O3+TiO2 3.31 CaO 0 11 0.11 P <0.01 MgO 0.16 S 0.01 TiO2 0.38 P 0.04 S 0.08 LOI (Loss of ignition) -3.18 Octo

  27. Slide 27: Magnetite Project Power and Pipelines

    Southdown Magnetite g Project j Power and Pipelines p For personal use only Key Facts - Power: Estimated Length ƒ 288km Capital Cost ƒ A$272 million ƒ 330kV transmission line ƒ Ongoing discussions with Capacity Status Western Power Key Facts – Pipeline: Estimated Length ƒ 100km (1.5 metres deep) Cap

  28. Slide 28: Magnetite Project Water Supply

    Southdown Magnetite g Project j Water Supply pp y For personal use only ƒ Seawater reverse Source osmosis desalination plant Capacity ƒ 10GL/a Capital cost ƒ A$170 million ƒ Coastal location 25km from mine and pumped Location to the mine site after treatment October 2011 Slide 28

  29. Slide 29: Magnetite Project Albany Port Infrastructure

    Southdown Magnetite g Project j Albany y Port Infrastructure For personal use only Vessels ƒ Cape size (18m draft) ƒ Deepen; widen and extend existing shipping channel Activities ƒ New wharf ƒ Filtration plant and storage shed ƒ 9ha ƒ Increases port Area Reclaimed capacity from 2.5Mt to 14Mt New Ber

  30. Slide 30: Magnetite Project Environmental Permits

    Southdown Magnetite g Project j Environmental Permits For personal use only 3 Mi Environmental Mine E i t l permit it Granted November 2009,, amendment required in 2011 for 10mtpa 3 Port p permits Granted November 2010 Water permit Desalination permit expected in 2011 October 2011 Slide 30

  31. Slide 31: Magnetite Project PFS Capital Expenditure

    Southdown Magnetite g Project j PFS Capital p Expenditure p For personal use only SOUTHDOWN CAPITAL EXPENDITURE A$m Mine (1) 560 Concentrator 850 Slurry Pipeline 200 Transmission Line 320 Desalination and Water Supply 200 Albany Concentrate Filtration and Storage 20 Port of Albany 400 Allowances for

  32. Slide 32: Project Australia - Malaysia

    Southdown Project Australia - Malaysia For personal use only 4. Pellet Plant (7Mtpa) ( p ) 3. Concentrate shipped (10Mtpa) 2. 100km slurry pipeline to Albany Port 1. Mine and concentrator targeting 10Mtpa of concentrate production for over 25 years October 2011 Slide 32

  33. Slide 33: The Kemaman Pellet Plant Location Plan

    The Kemaman Pellet Plant Location Plan For personal use only October 2011 Slide 33

  34. Slide 34: Kemaman Project PFS Capital Expenditure

    Kemaman Project PFS Capital Expenditure For personal use only KEMAMAN A$m Pellet Plant 640 Kemaman Port Facilities and Materials Handling 300 All Allowances f Provisional for P i i l Sums S 1 Total Costs (2) – Malaysian Operations 941 (2) Includes EPCM, Owners Costs, Estimate Accuracy and Project Co

  35. Slide 35: Project PFS Operating Cost Summary

    Southdown Project PFS Operating Cost Summary For personal use only Unit Rates Cost per tonne of concentrate produced <A$60 Cost per tonne of pellets produced <A$75 (1) Excludes WA Mineral Royalty October 2011 Slide 35

  36. Slide 36: Forecast Project Schedule

    Forecast Project j Schedule For personal use only 2011 2012 2013 2014 Definitive Feasibility Fi Financing i Construction Commissioning & Production October 2011 Slide 36

  37. Slide 37: Magnetite Project PFS Highlights

    Southdown Magnetite g Project j PFS Highlights g g For personal use only Why is this project different to other magnetite projects being built? • Grange’s G ’ cashflow, f extensive operating experience and existing IP dramatically reduces execution risk, • The project is well advanced: ¾ Major j p p

  38. Slide 38: Resources and Reserves 2011

    Resources and Reserves 2011 For personal use only Supporting Long Mine Lives Mineral Resources (inclusive of reserves) Ore Reserves Tonnes Grade Tonnes Grade ((Mt)) ((%DTR)) ((Mt)) ((%DTR)) Savage River 4 Savage River Measured 81 54.2 Proved 48 51.6 Indicated 132 53.5 Probable 66 51.4 Inferred 87 48

  39. Slide 39: Production growth prospects

    Production g growth p prospects p For personal use only 14000 12000 10000 on tonness 8000 Southdown Millio 6000 4000 2000 S Savage River Ri 0 2006 2008 2010 2012 2014 2016 2018 2020 (S thd (Southdown production d ti includes i l d Sojitz S jit 30% share)) h )) October 2011 Slide 39

  40. Slide 40: Grange - The Largest Producing Magnetite Company

    Grange g - The largest g Producing g Magnetite g Company p y For personal use only 2,000 13.8b 1,800 Out of the numerous junior companies with magnetite assets, Grange 2.08b 2.79b is the only one in production. production 1,600 Marrkeet Capitalisatioon A$M 1,400 1.65b 1,200 1,000 800 600 400 200 ‐ O

  41. Slide 41: Current Focus and Future Milestones

    Current Focus and Future Milestones For personal use only ƒ Position Savage g River for longg term sustainable production: p – Replacement ball mill installed February 2011 2012 – Replacement AG mill purchased – Trucking T ki fleet fl t re-build b ild almost l t complete l t – Reviewing options for

  42. Slide 42: Summary

    Summaryy For personal use only ƒ Australia's leading magnetite & iron ore pellet producer ƒ Solid investor, customer and revenue base ƒ Extensive magnetite technical and operational expertise ƒ Strong balance sheet and strong cashflow forecasts ƒ Healthy H lth mix i off Cornerstone, C t Institutiona

  43. Slide 43: Key Contacts

    Keyy Contacts For personal use only Primary contacts: Russell Clark Managing Director & Chief Executive Officer +61 8 9327 7901 managingdirector@grangeresources.com.au October 2011 Slide 43

  44. Slide 44: Competent Person Statement

    Competent p Person Statement For personal use only Southdown Project j The information in this presentation which relates to the Mineral Resources of the Southdown Project is based on information compiled by James Farrell who is a full-time employee of Golder Associates Pty Ltd and a Member of the A

  45. Slide 45: Appendix A – Southdown Project

    Appendix pp A – Southdown Project j For personal use only Mineral Resource Estimate Classification Measured Resources Indicated Resources Inferred Resources Total Resources Tonnes (Mt) 219.7 210.3 224.4 654.4 DTC wt% 37.4 38.9 33.4 36.5 DTC Fe% 69.2 69.3 69.1 69.2 DTC SiO2% 1.72 1.94 2.07 1.91 DTC A

  46. Slide 46: Appendix B – Savage River

    Appendix pp B – Savage g River For personal use only Mineral Resource and Ore Reserve Estimates Mineral Resource Tonnes (Mt) Grade (%DTR) Grade Ore Reserve Tonnes (Mt) (%DTR) Savage-River Total Measured 86.4 54 S Savage-River Ri Total T t l Indicated 131.9 53 Proved 50.6 51 Inferred 87.8 49 Probable