Amara Minerals Limited · ASX:AM3

Amara Minerals — Non-Deal Roadshow (August 2026)

18 slides from Amara Minerals's roadshow presentation, August 2026

  1. Slide 1: Advancing a High-Grade Victorian Gold-Antimony System

    ASX: AM3 Advancing Advancing a High-Grade High-Grade Victorian Victorian Gold-Antimony Gold–Antimony System System August 2026

  2. Slide 2: Important Information

    Important Information DISCLAIMER This presentation is for informational purposes only and does not constitute an offer to sell or solicitation to purchase any securities. In providing this presentation Amara Minerals Limited ACN 120 973 775 and its subsidiaries (AM3) has not considered the financial

  3. Slide 3: Emerging Victorian Gold & Antimony Story with Near-term News Flow & Scale Potential

    Emerging Victorian Gold & Antimony Story with Near-term News Flow & Scale Potential Two 100%-owned Victorian gold-antimony projects, Apollo and Lauriston Operating in Victoria, one of the world's premier high-grade gold provinces Apollo: large-scale system where maiden drilling has confirmed high-gr

  4. Slide 4: Company Overview, High-Conviction Shareholder Base

    Company Overview, High-Conviction Shareholder Base AM3 1.545 Billion Board and Management ASX Ticker: AM3 Options on issue A$0.004 A$2.08M / Mena Habib / Chris Gerteisen Share Price (20 Aug 2026) Cash (30 June 2026) Non-Executive Chairman Non-Executive Director / Ian Holland / Adrien Wing A$12.34M A

  5. Slide 5: Advancing high-impact Victorian gold-antimony projects

    Advancing 2 high-impact Victorian gold-antimony projects LAURISTON - 1 0 0 % I n t e r e s t Along strike from Fosterville in Victoria's Bendigo Zone 287km2 landholding with priority drill targets ~233koz historically produced @ 20.7 g/t Au Strong geological parallels to Fosterville's Swan Zone High

  6. Slide 6: Complete 3,907.5m – Initial Diamond Drilling Program Summary

    Lauriston – Initial Diamond Drilling Program Summary COMET YANKEE / TROJAN PROGRAM STATUS 8 drill holes 12 drill holes Complete Initial diamond drilling program 1,852.7 2,054.8 NEXT PHASE Follow-up at Trojan at depth metres drilled metres drilled and along strike RIG RELOCATION Relocated to Apollo G

  7. Slide 7: Lauriston Comet Discovery: Standout gold grades confirmed

    Lauriston Comet Discovery Standout gold grades confirmed EXCEPTIONAL GRADES Previous drilling returned standout intercepts: 8.0m at 104 g/t Au from 95m in CRC07 (incl. 2.0m at 413 g/t Au) 9.0m at 11.6 g/t Au from 97m in CDH01A (incl. 4.0m at 25.1 g/t Au) 5.9m at 15.4 g/t Au from 101.9m in CDH10 (inc

  8. Slide 8: Comet: 4.5km Gold-Antimony Corridor Revealed in Soils

    Lauriston Comet 4.5km Gold-Antimony Corridor Revealed in Soils Soil geochemistry shows gold Aligned Gold- distribution matching antimony Antimony Anomalies trends Three Au-As-Sb trends defined Multiple Mineralised along the Comet Anticline - Corridors Comet, New Trojan and Antimony Adit Key prospect

  9. Slide 9: Comet: Antimony Sampling Confirms Au-Sb Mineralisation

    Lauriston Comet Antimony Sampling Confirms Au-Sb Mineralisation Systematic Sampling First dedicated Sb sampling of historic diamond hole CND03 confirms high-grade Au-Sb mineralisation High-Grade Intercepts 0.89m @ 2.24% Sb and 1.26 g/t Au from 177.24m, including: / 0.1m @ 10.3% Sb and 3.22 g/t Au fr

  10. Slide 10: Comet Target: High-Grade Gold Drilling Hits

    Lauriston Comet Target High-Grade Gold Drilling Hits KEY DRILL INTERCEPTS Hole AC2502: 9.8m @ 2.76 g/t Au from 90.9m (incl. 0.7m @ 27.1 g/t Au) / plus 0.6m @ 5.33 g/t Au from 91.4m; plus 4.3m @ 1.01 g/t Au from 82.7m Hole AC2504: 1.0m @ 3.09 g/t Au from 166.6m; 0.8m @ 1.84 g/t Au from 146.8m All 6 a

  11. Slide 11: New Trojan: An Emerging Antimony Discovery

    Lauriston New Trojan An Emerging Antimony Discovery FIRST DIAMOND DRILL ASSAYS AY2608: 1.9m @ 0.48% Sb and 0.88 g/t Au from 103.3m AY2607: 0.3m @ 0.67% Sb and 3.80 g/t Au from 90.9m AY2605: 0.7m @ 1.46% Sb and 0.49 g/t Au from 96.0m; plus 0.4m @ 1.05 g/t Au from 99.8m AY2610: 6.5m @ 0.86% Sb and 0.5

  12. Slide 12: Program Status: Drilling Advancing Across All Targets

    Lauriston Program Status Drilling Advancing Across All Targets COMET 8 holes complete; 1,852.7m total drilled Testing down-dip and along-strike continuity of Comet Shear Step-out drilling along 4.5km Comet-Trojan corridor YA N K E E -T ROJA N 12 holes complete - drilling finished New Trojan discover

  13. Slide 13: Apollo: Significant gold intersections confirm mineralisation

    Apollo Significant gold intersections confirm mineralisation Mineralisation Confirmed Maiden diamond drilling validates gold zones within Dig Fault Zone High-Grade Intercepts Broad mineralised zones identified beneath historical workings Model Validation Results reinforce geological model and underp

  14. Slide 14: Apollo - Strong gold intercepts from maiden program supported by historical drilling

    Apollo - Strong gold intercepts from maiden program strongly supported by historical drill results Selected drill intercept highlights AA2504: 10.9m @ 3.26 g/t Au from 69.1m (incl. 6.0m @ 5.36 g/t Au) AA2501: 27m @ 1.69 g/t Au from 255m (broad mineralised zone) AA2501: 5.8m @ 3.26 g/t Au from 290.2m

  15. Slide 15: Apollo: Regional soil sampling completed

    Apollo Regional soil sampling completed Regional soil sampling completed to test approximately 11km of strike along the Strathbogie Granite contact Broad-spaced program designed to identify structures analogous to those hosting mineralisation at Apollo Soil geochemistry an effective, rapid targeting

  16. Slide 16: Apollo: Heyfield Reef Prospect shows high-grade Antimony-Gold potential

    Apollo Heyfield Reef Prospect shows high-grade Antimony-Gold potential SIGNIFICANT DISCOVERY Review of past work confirms high-grade antimony- gold potential HISTORICAL DATA Results include 22 rock samples from 2019 and 16 drillholes completed in 2022 by GPAC EXCEPTIONAL GRADES HFRC04: 3m @ 5 .2 g/t

  17. Slide 17: Strong News Flow, Clear Catalysts Ahead

    Strong News Flow, Clear Catalysts Ahead Funding in place to rapidly expand exploration and drilling activities at both Victorian Gold and Antimony Projects - including $2.2m Placement completed 24 June 2026 LAURISTON GOLD AND ANTIMONY PROJECT APOLLO GOLD AND ANTIMONY PROJECT Initial diamond drilling

  18. Slide 18: ASX: AM3 amaraminerals.com

    Ian Holland Mark Flynn Managing Director Investor Relations +61 428 397 245 +61 416 068 733 ian.holland@amaraminerals.com.au mark.flynn@amaraminerals.com.au Released with the Authority of the Board ASX: AM3 amaraminerals.com

Amara Minerals — Non-Deal Roadshow (August 2026) on 6ix