Admie Holdings Sa · ATHEX:ADMIE

Admie Holdings Sa — 4th Athex Mid Cap Conference, Athens, May 2021

39 slides from Admie Holdings Sa's conference presentation, May 2021

  1. Slide 1: Corporate Presentation

    Corporate Presentation May 2021 1

  2. Slide 2: Disclaimer

    Disclaimer This document contains forward-looking statements that involve risks and uncertainties. These statements may generally, but not always, be identified by the use of words such as “outlook”, “guidance”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “target” and similar expressions to

  3. Slide 3: Agenda

    Agenda 1. ADMIE HOLDING S.A. & IPTO S.A. Overview 2. Investment Program Summary 3. Financial Highlights 4. GRID Telecom 5. Appendix

  4. Slide 4: ADMIE at a glance

    ADMIE at a glance ▪ Sole Transmission System Operator (TSO) in Greece Transmission Distribution Generation Supply Employees Transported Energy 1.590 50.1 TWh Network 11.968 km* RAB Net Profit €1.9bn *11,968 km is the distance between Paris, France and Christmas Island, Australia €84.9m 4

  5. Slide 5: Investment Proposition

    Investment Proposition Natural monopoly in Greece 11,971 km of HV transmission lines Boosting dividend returns Reduced borrowing costs and established minimum 50% earnings Investments payout c. €5b of cumulative investments from 2020 to 2030 Rational regulatory Leading TSO as Strategic environment I

  6. Slide 6: ADMIE Holding S.A. & IPTO S.A. Overview

    1. ADMIE HOLDING at a glance& IPTO S.A. Overview 6

  7. Slide 7: Shareholder Structure

    Shareholder Structure Hellenic Silchester & Other Inst. Private Republic Funds Investors Investors 51.1% 9.96% 23.2% 15.7% 31.12.2020 Athens Stock Exchange ATHEX: ADMIE 51.0% Bloomberg: ADMIE GA Reuters: ADMr.AT 232,000,000 common shares 25.0% 24.0% 7

  8. Slide 8: Regulatory Framework

    Regulatory Framework Stable regulatory No consumer Allowed framework credit risk Revenue ▪ 4-year regulatory period ▪ Revenues are not depended ▪ Allowed revenues assure during which the respective on state payments remuneration of cost of capital parameters remain stable and cost of debt ▪ Transmis

  9. Slide 9: Regulatory Period: Four years

    Remuneration scheme Regulatory Asset Base Undepreciated invested capital + maintenance/ (RAB) development CapEx/ WiP + working capital - disposals - subsidies Regulatory Period: Four years Allowed Revenue (AR) Operator's Allowed Revenue AR = O + Dep + R O : annual operating costs Dep : annual deprec

  10. Slide 10: Investment Program Summary

    2. Investment at a glance Program Summary 10

  11. Slide 11: Network Development Plan 2020-2030

    Network Development Plan 2020-2030 Expected Project Cost ID Project description commissioning (2020-30) €m Corridor A’ 400 kV to Peloponnese (OHL 1 2021 117 Megalopoli – Patras – Acheloos) 2 Cycladic Islands Ιnterconnection (Phases completed B and C) 3 Cycladic Islands Interconnection Phase D 2024 3

  12. Slide 12: Crete – Attica Interconnection

    Crete – Attica Interconnection Attica ✓ The project is considered Project of Major Peloponnese Importance (PMI), so a Premium rate of return can be approved by the regulator (RAE), on top of the normal rate of return. I AC 2x200MVA II DC 2x500MW The percentage of the premium return 340km 132km subma

  13. Slide 13: Key milestones in 2020

    Key milestones in 2020 Maturing of the tender process for both parts of the project (submarine cable interconnection and converters), whereas the signing of the relevant contracts took place in Crete-Attica June 2020. Interconnection The first cable was successfully tested in December 2020. The seco

  14. Slide 14: Strategic Plan

    Strategic Plan Leadership • Acceleration of all island interconnections • Participation in Energy Exchange and implementation of the target model. Growth • Renovation and optimal management of assets • Strong financial profile Digitalization 1 2 3 • Optimization of operations, systems and procedures

  15. Slide 15: Financial Overview

    3. Financial at a glance Overview 15

  16. Slide 16: IPTO Group FY 2020 Highlights

    IPTO Group FY 2020 Highlights TOTAL REVENUES EBITDA Net PROFIT €286.7m €210.6 m €84.9m PY €249.8m(+14.8%) PY €224.1 m (-6.1%) PY €105.6m(-19.6%) ✓ Increase by €44.4m in System Rent due to ✓ 2019 Positive affected by one-off non ▪ Refinancing of existing syndicated the increase of the Allowed Revenue

  17. Slide 17: Profitability

    Profitability EBITDA EBIT Net Income 73% 90% 43% 54% 30% 42% 224,1 Reported Reported Reported 210,6 134,8 122,1 105,6 84,9 FY 2020 FY 2019 FY 2020 FY 2019 FY 2020 FY 2019 71% 71% 40% 42% 28% 31% Adjusted Adjusted Adjusted 202,5 176,5 114,0 103,9 81,1 78,7 FY 2020 FY 2019 FY 2020 FY 2019 FY 2020 FY 2

  18. Slide 18: EBITDA Bridge

    EBITDA Bridge Positive effect from the voluntary Positive Trend of exit scheme employed in 2018 electricity Demand Amounts in €’m 18

  19. Slide 19: Cash Flow & Net Debt

    Cash Flow & Net Debt Cash Flow Bridge Net Debt Net Debt remained at satisfactory levels due to high cash reserves standing at € 504.5m (31/12/2020) ➢ 2.49x Net Debt/adj. EBITDA ➢ 17x Interest coverage ratio ➢ 0.67x Net Debt/Equity 19

  20. Slide 20: IPTO selected items

    IPTO selected items IPTO S.A. Group IPTO S.A. Group P&L Balance sheet 31.12.2020 31.12.2019 Chg yoy 31.12.2020 31.12.2019 31.12.2020 31.12.2019 31.12.2020 31.12.2019 System rent 273.6 229.1 19.4% 273.6 229.1 Non-current assets 2.689,5 2.327,7 2.489,5 2.128,6 Total revenues 285.1 248.8 14.6% 286.7 24

  21. Slide 21: ADMIE Holding FY 2020 Highlights

    ADMIE Holding FY 2020 Highlights €43.3m €419k -1.6% y/y Share of -19.6% y/y Reported Investments (Income) OPEX €264k €0.103 -12.7% y/y -16.7% y/y Net Financial Dividend Income Per Share Active cash management benefits offset higher OPEX 21

  22. Slide 22: ADMIE Holding selected items

    ADMIE Holding selected items Balance sheet 31.12.2020 31.12.2019 P&L 31.12.2020 31.12.2019 Non-current assets 722.6 704.6 Income from Affiliate 43.3 53.9 Current assets 27.8 22.5 EBITDA 38.8 53.4 of which: Cash & equiv. 7.0 8.5 Operating Income 43.2 53.4 Total Assets 750.4 727.2 Net profit 43.2 53.9

  23. Slide 23: Dividend Policy

    Dividend Policy ✓ Average dividend yield since listing ~% 0,0289 0,0179 0,0285 ✓ Bound to distribute 0,089 0,0854 based on a minimum 0,06 0,0316 payout ratio of 50% 2018 2019 2020 2021 (IPTO SA) Interim Dividend Remaining Dividend 2019 2020 2021 ✓ ADMIE Holding SA is Dividend per share 0,09 0,12 0,1

  24. Slide 24: IPTO 2019-2023 outlook

    IPTO 2019-2023 outlook EUR 2019 Guidance Comments Regulated €1.68B ~€2.60B (2023-24) Increase 53% Asset Base (RAB)* Investments Ariadne Interconnection €248M ~ €1.80B (2023-24) (System & Users) included Consolidated with Ariadne EBITDA* €176.5M ~ €280M (2023-24) Interconnection * Figures from ‘’Grid

  25. Slide 25: GRID Telecom

    4. GRID at a glance Telecom 25

  26. Slide 26: Services

    Services In the near future Grid Telecom will be Having direct access to the extended proving collocation services to mobile (2.500 km) fiber optic network throughout telecom operators on IPTO’s Powers Pylons Greece owned by IPTO, Grid Telecom which are set up all over Greece. provides super high sp

  27. Slide 27: Our Vision

    Our Vision ✓ Submarine cables transfer 99% of internet traffic. ✓ Many local operators (East Europe) seek routes to major gateways (Athens and Chania) ✓ Balkans are currently under- served and by-passed by the main fiber corridors connecting Asia, Africa and Western Europe ✓ IPTO could provide acces

  28. Slide 28: Thank you

    Thank you For additional information please contact ADMIE Holding Investor Relations Tel: +30 210 3636 936 E-mail: office@admieholding.gr or visit: www.admieholding.gr

  29. Slide 29: Appendix

    Appendix IPTO key financial items/ Regulatory Framework 29

  30. Slide 30: Regulatory overview

    €m Regulatory overview Year 2018 2019 2020 2021 Average RAB 1,449.8 1,684.5 1,941.3 2,059.8 x WACC (real, pre-tax) 7.0% 6.9% 6.5% 6.3% = Allowed remuneration 101.5 116.2 126.2 129.8 + Authorized OPEX 77.3 77.9 78.5 79.1 + Regulatory Depreciation 55.2 58.3 76.4 77.1 = Allowed revenue 234.0 252.4 281.

  31. Slide 31: Regulatory period 2018 – 2021

    €m Regulatory period 2018 – 2021 Regulated Asset & Rate of Return Allowed Revenue build out 2.500,0 8,0% 7,0% 6,9% 6,5% 6,3% 7,0% 1,5 2.000,0 6,0% 126 130 1.500,0 5,0% 116 101 4,0% 2.060 281 286 1.000,0 1.941 3,0% 254 1.684 234 76 77 55 58 1.450 2,0% 500,0 1,0% 77 78 78 79 0,0 0,0% 2018 2019 2020 20

  32. Slide 32: WACC calculation

    WACC calculation WACC components 2018 2019 2020 2021 Risk-free 0.7% 0.7% 0.7% 0.7% Market risk 5.0% 5.0% 5.0% 5.0% Equity beta 0.68 0.73 0.67 0.72 Country risk 2.3% 2.0% 1.8% 1.5% Cost of equity post-tax 6.4% 6.4% 5.9% 5.8% Tax rate 29.0% 29.0% 29.0% 29.0% Cost of equity pre-tax 9.0% 9.0% 8.3% 8.2%

  33. Slide 33: Required Revenue calculation

    Required Revenue calculation Regulatory Period Four years Regulatory Asset Base Undepreciated invested capital + maintenance/ (RAB) development CapEx/ WiP + working capital - disposals - subsidies Allowed Revenue (AR) Operator's Allowed Revenue In real terms for each year AR = O + Dep + R O annual o

  34. Slide 34: IPTO – Regulated Revenue analysis

    IPTO – Regulated Revenue analysis In thous’ euros 2020 2019 Difference Comments: Items comprising AR in RAE 235/2018 OPEX 78.461 77.862 599 Depreciation 76.370 58.335 18.035 • For 2020, Allowed Revenue (AR) was Total expenses 154.831 136.197 18.634 budgeted with an increase of €28.6m, RAB 1.941.335

  35. Slide 35: Islands Interconnection

    Islands Interconnection Main Objectives System stability Ensuring a safe supply of energy for the islands electricity system Cost Reduction • Drastic reduction of electricity generation cost in the islands • Substitution of oil units with RES plants and imports from the mainland PSOs elimination Mor

  36. Slide 36: Cycladic Interconnection

    Cycladic Interconnection Phase A Phase B 150kV 150kV 66kV 66kV 150kV 200MVA 150kV 200MVA Lavrio Tinos 150kV 140MVA Lavrio Tinos 150kV 140MVA Mykonos Mykonos Syros Syros Paros Naxos Paros Interconnection of Naxos island with Paros and Mykonos islands (close Radial Interconnection of Syros island with

  37. Slide 37: Cycladic Interconnection

    Cycladic Interconnection Phase C Phase D 150kV 66kV Lavrio Tinos 150kV 200MVA 150kV 140MVA Mykonos Syros Paros Naxos Expansion to the West and Southern Cycladic Islands Construction of second submarine cable between Lavrio and Syros Interconnection of Lavrio - Serifos – Milos – Folegandros - Thira –

  38. Slide 38: Crete- Peloponnese Interconnection (Phase A)

    Crete- Peloponnese Interconnection (Phase A) Interconnection of Crete with the mainland through two distinct links The project is implemented in two phases (A, B) Phase A’ : Connection Peloponnese - Crete Attica Commissioning: 2021 Estimated budget: c. €292m Peloponnese Contractualisation: 11.2018 -

  39. Slide 39: Crete- Attica Interconnection (Phase B)

    Crete- Attica Interconnection (Phase B) The company Ariadne Interconnection SPSA, a currently 100% subsidiary of IPTO, has been established as a SPV (Special Purpose Vehicle – SPV) in order to finance and construct the project of Crete – Attica Interconnection Phase ’B : Connection Crete - Attica At

ADMIE Holding — 4th Athex Mid Cap Conference, Athens, May 2021 on 6ix