Slide 1: Anawil Wire and Engineering Ltd (AWAEL)
www.anawilvapi.in ANAWIL WIRE AND ENGINEERING LTD (AWAEL) Onshore Wind Turbine Tower Manufacturing Private & Confidential Precision-led wind tower manufacturing platform for India’s renewable infrastructure buildout.
Slide 2: Company Overview
Company Overview Anawil Wire and Engineering Limited is engaged in the manufacturing of onshore windmill towers. Operates 2 48.05 acres 612 Towers 459 Order Book: Received LOI for Manufacturing Facility Combined Combined Annual Capacity Towers 359.81 Cr 38 Towers amounting to Koppal, Karnataka ƫ!.0%
Slide 3: India's Ambitious Renewable Energy Goals Are Transforming Its Power Sector
INDIA’S AMBITIOUS RENEWABLE ENERGY GOALS ARE TRANSFORMING ITS POWER SECTOR • India aims to become a global wind power Installed Renewable Capacity Breakup (GW) Installed Wind Capacity by State hub, with policy support driving local January 2025 (cumulative achievement) as of 31 December 2024 manufac
Slide 4: Potential of India's Wind Energy
POTENTIAL OF INDIA’S WIND ENERGY National Institute of Wind Energy (NIWE), has installed over 900 Windmonitoring Stations Assessment indicates a potential of 1859.4 GW. Eight Windy States: Sl.No. State Wind Potential Wind Potential at 120m (GW) at 150m (GW) 1 Andhra Pradesh 74.9 123.3 2 Gujarat 142.
Slide 5: Core Product Offering
CORE PRODUCT OFFERING TOWER ASSEMBLY Windmill Towers Power and Control Cables • Tubular steel structures used in onshore wind power projects Yaw Bearing • Comprise multiple cylindrical sections fabricated through precision engineering Yaw Deck • Designed and manufactured as per Drip Loop 1/0+)!.ġ/,!
Slide 6: Geographic Revenue Concentration
GEOGRAPHIC REVENUE CONCENTRATION Revenue by State: (RS. In Lakhs) State FY 26 % FY 25 % FY 24 % Karnataka ₹134.49 Cr 93.87% ₹78.55 Cr 99.95% ₹43.92 Cr 81.23% Gujarat ₹8.78 Cr 6.13% ₹0.04 Cr 0.05% ₹7.06 Cr 13.06% Rajasthan - - - - ₹3.09 Cr 5.71% Total ₹143.27 Cr 100.00% ₹78.59 Cr 100.00% ₹54.07 Cr 10
Slide 7: Seasonality of Business
SEASONALITY OF BUSINESS The Installation of Project Revenues and Company’s wind turbine !4!10%+* ,.+ü0%(%050!* business is towers is typically to be higher inherently /%#*%ü*0(5 slows during during seasonal in impacted April–Septe October–March, nature. during the mber when weather monsoon/rainy con
Slide 8: Order Book
ORDER BOOK As of March 31, 2026, the company had orders in hand from 6 customers aggregating to Rs. 35,981.72 lakhs, covering 379 towers. Order Amount 359.81Cr. Customer Product Description Towers (`In lakhs) Customer A Sany WTG Tower, Hight - 140 M 123 7,224.15 of order book -- Envision WTG Tower,
Slide 9: Manufacturing Capabilities
MANUFACTURING CAPABILITIES Facility Details • Location: Vapi, Gujarat (GIDC Industrial Park) • Strategic location near major ports • Well-connected to wind energy projects in South and West India • Skilled workforce availability Quality Standards • ISO 9001:2015 - Quality Management System • ISO 450
Slide 10: Manufacturing Process
MANUFACTURING PROCESS Production Flow: 01 02 03 04 Raw Material Procurement Design & Engineering Cutting & forming Welding Operations Ŷ ƫ!.0%ü! /1,,(%!. Ŷ CAD/CAM design Ŷ CNC precision cutting Ŷ Longitudinal Seam Ŷ selection capabilities Ŷ Cold roll forming (L.S.) Welding Ŷ High-grade steel Ŷ .+&!0
Slide 11: Competitive Strengths
COMPETITIVE STRENGTHS Core Advantages 1. IN-HOUSE MANUFACTURING & QUALITY 3. POSITIONED TO CAPTURE WIND GROWTH CONTROL Ŷ Windmill tower demand supported by Ŷ ġ!.0%ü! "+.3%* )%((0+3!./Č renewable energy adoption components and heavy fabrication Ŷ Annual manufacturing capacity of 612 Ŷ Facilities spre
Slide 12: Business Strategies
BUSINESS STRATEGIES Capacity Expansion • Existing facility at Koppal, Karnataka spread across 20.75 acres • Installed capacity of 420 windmill towers p.a. • Capability to manufacture up to 35 towers per month • New Kutch, Gujarat facility commenced in March 2026 • Kutch unit adds 16 towers per month
Slide 13: Management
MANAGEMENT Strategic planning, Compliance and legal business development, formalities, inventory and operational efficiency management, and business development Client acquisition and driving sustained Stakeholder engagement business growth. to support stability & growth. 20 years of experienc 5 yea
Slide 14: Key Performance Indicators
KEY PERFORMANCE INDICATORS (Rs. In Lakhs Except Percentage & Ratios) REVENUE FROM OPERATIONS EBTIDA & EBITDA MARGIN PAT & PAT MARGIN 6108.9 14326.69 42.64% 3662.83 25.57% 7858.86 2997.57 38.14% 1230.58 5406.65 15.66% 2222.28 41.10% 439.18 8.12% FY24 FY25 FY26 FY24 FY25 FY26 FY24 FY25 FY26
Slide 15: Key Performance Indicators
KEY PERFORMANCE INDICATORS (Rs. In Lakhs Except Percentage & Ratios) NET WORTH RETURN ON NET WORTH ROCE (%) 40.92% 8951.16 23.05% 30.71% 4007.59 21.84% 2776.75 13.68% 15.82% FY 24 FY 25 FY 26 FY 24 FY 25 FY 26 FY 24 FY 25 FY 26
Slide 16: Expanding Scope, Expanding Profit Pool
Three Business Models EXPANDING SCOPE, EXPANDING PROFIT POOL Flexible customer engagement models drive higher absolute profit scale over optical margins. Pure Conversion Conversion + Internals Integrated Supply Why Margin % Changes Customer supplies material Manufacturing + Material procurement + • P
Slide 17: Restated Statement of Assets and Liabilities
RESTATED STATEMENT OF ASSETS AND LIABILITIES (Rs. in Lakhs) Particlars Mar 31, 2026 Mar 31, 2025 Mar 31, 2024 A) EQUITY AND LIABILITIES 1. Share Capital 1971.5 965 965 Reserves & Surplus 6979.66 3042.59 1811.75 Money received against share warrants 0 0 0 Shareholders' Funds Total 8951.16 4007.59 277
Slide 18: Restated Statement of Assets and Liabilities
RESTATED STATEMENT OF ASSETS AND LIABILITIES (Rs. in Lakhs) Particlars Mar 31, 2026 Mar 31, 2025 Mar 31, 2024 B) ASSETS 1. Non Current Assets Property, Plant & Equipment 13590.31 5886.38 6298.96 Intangible Assets 31.87 25.87 27.9 Capital Work in Progress 584.8 124.46 0 Intangible Assets under Develo
Slide 19: Restated Statement of Profit and Loss
RESTATED STATEMENT OF PROFIT AND LOSS (Rs. in Lakhs) Particlars Mar 31, 2026 Mar 31, 2025 Mar 31, 2024 Revenue From Operation 14326.69 7858.86 5406.65 Other Income 35.98 80.98 1.27 Total Income 14362.68 7939.84 5407.92 4,!* %01.! Cost of Material Consumed 4731.58 2500.72 1915.92 Purchases of Stock i
Slide 20: Restated Cash Flow Statement
RESTATED CASH FLOW STATEMENT (Rs. in Lakhs) Particlars Mar 31, 2026 Mar 31, 2025 Mar 31, 2024 A) Cash Flow from Operating Activities: !0.+ü0!"+.!04 ąąĆĀċąĈ āąĉĈċĈć Ćăąċăć Adjustment for: Depreciation 1130.14 1005.13 1134.00 Interest Paid 564.27 585.66 555.19 Provision of Gratuity 10.57 7.40 6.64 Div
Slide 21: Restated Cash Flow Statement
RESTATED CASH FLOW STATEMENT (Rs. in Lakhs) Particlars Mar 31, 2026 Mar 31, 2025 Mar 31, 2024 Net cash flow from investing activities (B) (9727.16) (700.77) (696.01) C) Cash Flow From Financing Activities : Proceeds from Issue of Share Capital 138.00 0.00 0.00 Proceeds from Securities Premium 1142.7
Slide 22: Disclaimer
ANAWIL WIRE AND ENGINEERING LTD (AWAEL) D I S C L A I M E R This presentation or any other documentation or information (or any part thereof ) delivered or supplied should not be deemed to constitute a prospectus or placement memorandum or an offer to acquire any securities. No representation or war