    FORWARD LOOKING STATEMENTS Certain information regarding the Company contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other

  3. Slide 3: Focus on Flagship Klaza Project

    FOCUS ON FLAGSHIP KLAZA PROJECT • 100% owned by Rockhaven with no underlying royalties on resource areas • Road accessible with the Village of Carmacks and an electrical power grid located nearby • 1.36 million ounces of gold at 4.48 g/t and 26 million ounces of silver at 89 g/t in the inferred mine

  4. Slide 4: Road-Accessible Location

    ROAD-ACCESSIBLE LOCATION Klaza Deposit TSX-V:RK 4

  5. Slide 5: Developed Area with Excellent Infrastructure

    DEVELOPED AREA WITH EXCELLENT INFASTRUCTURE TSX-V:RK 5

  6. Slide 6: Klaza Setting

    2 KLAZA SETTING Looking Southeast • Local elevations range between 1,200 and 1,800 m • Limited bedrock exposure across belt • Roads, an historical hard rock mine and numerous placer operations TSX-V:RK 6

  7. Slide 7: Klaza Setting

    2 KLAZA SETTING Looking Southeast Camp • Eleven main mineralized structures identified to date • 1.8 km wide by 2.5 km long • Porphyry to epithermal transition model • Grades generally increase towards the northwest TSX-V:RK 7

  8. Slide 8: Klaza Property Expanded to 287 km2

    2 KLAZA PROPERTY EXPANDED TO 287 KM2 • Since 2010, Rockhaven has expanded the Klaza property from 4 km2 to 287 km2 • Exploration expenditures of $30M spent to date • Drill costs average ~$200/m all-in TSX-V:RK 8

  9. Slide 9: Since 2010 Diamond Drilling

    >78,000>90,000 m of mDiamond Drilling OF DIAMOND Since DRILLING SINCE2010 2010 • 94,000 m of drilling in 434 holes completed between 2010 and 2017 • 22,000 m of excavator trenching • 2016 and 2017 drill programs (total of 24,000 m) is not included in resource estimate • Eleven structurally controlle

  10. Slide 10: Western BRX Zone Plan Map and Drill Highlights

    WESTERN BRX ZONE PLAN MAP AND DRILL HIGHLIGHTS Central BRX Zone Western BRX Zone TSX-V:RK 10

  11. Slide 11: Western BRX Zone Longsection and Photo

    WESTERN BRX ZONE LONGSECTION AND PHOTO Central BRX Zone Western BRX Zone TSX-V:RK 11

  12. Slide 12: BRX Zone: High-Grade West End

    BRX ZONE: HIGH-GRADE WEST END 94.09 g/t gold, 545 g/t silver, 2.86% lead and 4.21% zinc over 2.63 m KL-17-401 TSX-V:RK

  13. Slide 13: BRX Zone: High-Grade West End

    2 BRX ZONE: HIGH-GRADE WEST END KL-17-413 139.29-140.76 m – 13.81 g/t gold and 113 g/t silver over 1.47 m TSX-V:RK 13

  14. Slide 14: Klaza Zone: Large Mineralizing System

    KLAZA ZONE: LARGE MINERALIZING SYSTEM Central Klaza Zone Western Klaza Zone TSX-V:RK 14

  15. Slide 15: Inferred Mineral Resource Estimate

    INFERRED MINERAL RESOURCE ESTIMATE Klaza Property - Total Inferred Mineral Resource Estimate Summary Grade Contained Metal Au Au Tonnes Au Ag Pb Zn EQ4 Au Ag EQ4 (kt) (g/t) (g/t) (%) (%) (g/t) (koz) (koz) Pb (klb) Zn (klb) (koz) Pit- Constrained2,3 2,366 5.12 94.51 0.93 1.18 6.71 389 7,190 48,258 61

  16. Slide 16: Block Model

    BLOCK MODEL Central Klaza 599,000 oz AuEQ Western Klaza 145,000 oz AuEQ Eastern BRX* 374,000 oz AuEQ Central BRX *not included in the current PEA 227,000oz AuEQ Total Inferred Mineral Resources Gold Silver Lead Zinc Tonnes Zone Gold Equivalent (kt) Western BRX koz g/t Koz g/t M lbs % M lbs % ≥10 g/t

  17. Slide 17: PEA Highlights

    PEA HIGHLIGHTS Total Capital Cost Estimate With the base case gold price of US$1200/oz, silver price of US$16/oz and an exchange rate Description Cost (C$M) of CAD$1.00 equal to US$0.75 are as follows: Underground development 136 Flotation tailings storage & residue 10 • Pre-tax NPV5% at CAD$150 mil

  18. Slide 18: Proposed Mine Plan

    PROPOSED MINE PLAN Central Central BRX Klaza Western BRX Western Klaza • Contractor open-pit mining • Owner-operated longhole open stoping underground mining • 30 m stope heights with a 2 m minimum mining width • Approximately 42 km of underground development (21 km for access & 21 km in veins) For

  19. Slide 19: Recent Exploration Targeting Near-Surface Mineralization

    Recent Exploration Targeting Near-Surface Mineralization TSX-V:RK 19

  20. Slide 20: Simplified Conceptual Process Flow Sheet

    SIMPLIFIED CONCEPTUAL PROCESS FLOW SHEET Lead (1.1% Mass Pull) Acacia Leach 59.8% Pb 5,957 g/t Ag Sequential Flotation 129.9 g/t Au Zinc 94% Au Recovery Crushing & Grinding (2.2% Mass Pull) 87% to Doré 1,500 tpd 48.0% Zn 1,318 g/t Ag 13.5 g/t Au Arsenopyrite (12.1% Mass Pull) POX & CIP ~200 tpd TSX-

  21. Slide 21: Drivers for Discovery at Klaza

    DRIVERS FOR DISCOVERY AT KLAZA Au, Ag, Pb, Zn, As, Sb, Cu, Cd, Te, Bi TSX-V:RK 21

  22. Slide 22: Magnetic Lows Indicate Additional Targets

    MAGNETIC LOWS INDICATE ADDITIONAL TARGETS TSX-V:RK 22

  23. Slide 23: VFL-EM Conductors Also Correlate Well

    VFL-EM CONDUCTORS ALSO CORRELATE WELL 500 m TSX-V:RK 23

  24. Slide 24: Promising Untested Soil Geochemical Anomalies

    Promising Untested Soil Geochemical Anomalies TSX-V:RK 24

  25. Slide 25: Strong Management & Insider Ownership

    STRONG MANAGEMENT & INSIDER OWNERSHIP Management / Directors / Advisors SHARES OUTSTANDING: 153,718,093 Matt A. Turner, B.Sc. President, CEO and Director Ian J. Talbot, B.Sc., LLB. COO SHARES FULLY DILUTED: 172,885,418 Larry Donaldson, CA CFO MARKET CAPITALIZATION: $20,000,000 Marc G. Blythe, P.Eng.

Rockhaven Resources — Investor Presentation (December 2017) on 6ix