Rockhaven Resources Ltd. · TSXV:RK
Rockhaven Resources — Investor Presentation (December 2017)
25 slides from Rockhaven Resources's investor presentation, December 2017
Slide 1: Corporate Presentation December 2017
Corporate Presentation December 2017 TSX-V: RK
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Certain information regarding the Company contained herein may constitute forward-looking statements within the meaning of applicable securities laws. Forward-looking statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance or other
Slide 3: Focus on Flagship Klaza Project
FOCUS ON FLAGSHIP KLAZA PROJECT • 100% owned by Rockhaven with no underlying royalties on resource areas • Road accessible with the Village of Carmacks and an electrical power grid located nearby • 1.36 million ounces of gold at 4.48 g/t and 26 million ounces of silver at 89 g/t in the inferred mine
Slide 4: Road-Accessible Location
ROAD-ACCESSIBLE LOCATION Klaza Deposit TSX-V:RK 4
Slide 5: Developed Area with Excellent Infrastructure
DEVELOPED AREA WITH EXCELLENT INFASTRUCTURE TSX-V:RK 5
Slide 6: Klaza Setting
2 KLAZA SETTING Looking Southeast • Local elevations range between 1,200 and 1,800 m • Limited bedrock exposure across belt • Roads, an historical hard rock mine and numerous placer operations TSX-V:RK 6
Slide 7: Klaza Setting
2 KLAZA SETTING Looking Southeast Camp • Eleven main mineralized structures identified to date • 1.8 km wide by 2.5 km long • Porphyry to epithermal transition model • Grades generally increase towards the northwest TSX-V:RK 7
Slide 8: Klaza Property Expanded to 287 km2
2 KLAZA PROPERTY EXPANDED TO 287 KM2 • Since 2010, Rockhaven has expanded the Klaza property from 4 km2 to 287 km2 • Exploration expenditures of $30M spent to date • Drill costs average ~$200/m all-in TSX-V:RK 8
Slide 9: Since 2010 Diamond Drilling
>78,000>90,000 m of mDiamond Drilling OF DIAMOND Since DRILLING SINCE2010 2010 • 94,000 m of drilling in 434 holes completed between 2010 and 2017 • 22,000 m of excavator trenching • 2016 and 2017 drill programs (total of 24,000 m) is not included in resource estimate • Eleven structurally controlle
Slide 10: Western BRX Zone Plan Map and Drill Highlights
WESTERN BRX ZONE PLAN MAP AND DRILL HIGHLIGHTS Central BRX Zone Western BRX Zone TSX-V:RK 10
Slide 11: Western BRX Zone Longsection and Photo
WESTERN BRX ZONE LONGSECTION AND PHOTO Central BRX Zone Western BRX Zone TSX-V:RK 11
Slide 12: BRX Zone: High-Grade West End
BRX ZONE: HIGH-GRADE WEST END 94.09 g/t gold, 545 g/t silver, 2.86% lead and 4.21% zinc over 2.63 m KL-17-401 TSX-V:RK
Slide 13: BRX Zone: High-Grade West End
2 BRX ZONE: HIGH-GRADE WEST END KL-17-413 139.29-140.76 m – 13.81 g/t gold and 113 g/t silver over 1.47 m TSX-V:RK 13
Slide 14: Klaza Zone: Large Mineralizing System
KLAZA ZONE: LARGE MINERALIZING SYSTEM Central Klaza Zone Western Klaza Zone TSX-V:RK 14
Slide 15: Inferred Mineral Resource Estimate
INFERRED MINERAL RESOURCE ESTIMATE Klaza Property - Total Inferred Mineral Resource Estimate Summary Grade Contained Metal Au Au Tonnes Au Ag Pb Zn EQ4 Au Ag EQ4 (kt) (g/t) (g/t) (%) (%) (g/t) (koz) (koz) Pb (klb) Zn (klb) (koz) Pit- Constrained2,3 2,366 5.12 94.51 0.93 1.18 6.71 389 7,190 48,258 61
Slide 16: Block Model
BLOCK MODEL Central Klaza 599,000 oz AuEQ Western Klaza 145,000 oz AuEQ Eastern BRX* 374,000 oz AuEQ Central BRX *not included in the current PEA 227,000oz AuEQ Total Inferred Mineral Resources Gold Silver Lead Zinc Tonnes Zone Gold Equivalent (kt) Western BRX koz g/t Koz g/t M lbs % M lbs % ≥10 g/t
Slide 17: PEA Highlights
PEA HIGHLIGHTS Total Capital Cost Estimate With the base case gold price of US$1200/oz, silver price of US$16/oz and an exchange rate Description Cost (C$M) of CAD$1.00 equal to US$0.75 are as follows: Underground development 136 Flotation tailings storage & residue 10 • Pre-tax NPV5% at CAD$150 mil
Slide 18: Proposed Mine Plan
PROPOSED MINE PLAN Central Central BRX Klaza Western BRX Western Klaza • Contractor open-pit mining • Owner-operated longhole open stoping underground mining • 30 m stope heights with a 2 m minimum mining width • Approximately 42 km of underground development (21 km for access & 21 km in veins) For
Slide 19: Recent Exploration Targeting Near-Surface Mineralization
Recent Exploration Targeting Near-Surface Mineralization TSX-V:RK 19
Slide 20: Simplified Conceptual Process Flow Sheet
SIMPLIFIED CONCEPTUAL PROCESS FLOW SHEET Lead (1.1% Mass Pull) Acacia Leach 59.8% Pb 5,957 g/t Ag Sequential Flotation 129.9 g/t Au Zinc 94% Au Recovery Crushing & Grinding (2.2% Mass Pull) 87% to Doré 1,500 tpd 48.0% Zn 1,318 g/t Ag 13.5 g/t Au Arsenopyrite (12.1% Mass Pull) POX & CIP ~200 tpd TSX-
Slide 21: Drivers for Discovery at Klaza
DRIVERS FOR DISCOVERY AT KLAZA Au, Ag, Pb, Zn, As, Sb, Cu, Cd, Te, Bi TSX-V:RK 21
Slide 22: Magnetic Lows Indicate Additional Targets
MAGNETIC LOWS INDICATE ADDITIONAL TARGETS TSX-V:RK 22
Slide 23: VFL-EM Conductors Also Correlate Well
VFL-EM CONDUCTORS ALSO CORRELATE WELL 500 m TSX-V:RK 23
Slide 24: Promising Untested Soil Geochemical Anomalies
Promising Untested Soil Geochemical Anomalies TSX-V:RK 24
Slide 25: Strong Management & Insider Ownership
STRONG MANAGEMENT & INSIDER OWNERSHIP Management / Directors / Advisors SHARES OUTSTANDING: 153,718,093 Matt A. Turner, B.Sc. President, CEO and Director Ian J. Talbot, B.Sc., LLB. COO SHARES FULLY DILUTED: 172,885,418 Larry Donaldson, CA CFO MARKET CAPITALIZATION: $20,000,000 Marc G. Blythe, P.Eng.
Rockhaven Resources — Investor Presentation (December 2017) on 6ix