Slide 1: Hamilton Works Community Liaison Committee Meeting
Hamilton Works Community Liaison Committee Meeting October, 2018 Andy Sebestyen
Slide 2: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 20 June 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Technical St
Slide 3: Know Your Emergency Exits
Know Your Emergency Exits Review Evacuation Routes of the room you are located in
Slide 4: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 20 June 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Technical St
Slide 5: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 20 June 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Technical St
Slide 6: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 20 June 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Technical St
Slide 7: Site-Specific Standard Order (Particulates): Performance Review – Daily
Site-Specific Standard Order (Particulates): Performance Review – Daily Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% June 11 to Sep 30, 2018 0 – 3.24% 0 – 1.28% 0 – 3.85% Range (0.28%) (0.15%) (1.09%) (Average) Jan. 1 to June 10, 2018 0 – 4.
Slide 8: Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages
Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2017-2019 Limits 7% 0.8% 4.2% 12 s 2020 Limits 4% 0.4% 2.5% 12 s June 11 to Sep 30, 2018 Range 0.19 – 0.35% 0.06 – 0.25% 0.76 – 1
Slide 9: Performance Review – Daily Observations – Pushing Emissions
Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – Pushing Emissions Date Pushing Emission (opacity %) 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% June 11 to Sep 30, 2018 Range 0 – 51.67 % (Average) (10.88 %) Jan. 1 to June 10, 2018 Range 0 – 45 % (Average) (10.97 %)
Slide 10: Performance Review – Additional Items
Site-Specific Standard Order (Particulates): Performance Review – Additional Items Community complaints since the last CLC meeting : A. Complaints registered with HIEA and MECP; shared cleanup costs 1. Fallout (23 Bayfield Ave.) - July 31, 2018 2. Fallout (2 Fourth Ave) - Aug. 18, 2018 B. Observatio
Slide 11: Road Dust Emission
Road Dust Emission March, 2018 Conclusion: Dust from roadway Probable Cause: A gust of wind picked up some dust from the roadway between the coal piles, where the vehicles travel. The coal piles themselves were sealed off quite well. Resolution: The Operators, at the time, did react to the issue and
Slide 12: Quenching Emission
Quenching Emission June, 2018 Conclusion: Inefficient removal of particulates during the quenching of coke. Probable Cause: As designed, the quench tower has baffles that capture most coke particulates. New baffles were completely installed May 2017. Green coke will also result in more fine dust in
Slide 13: CBS boiler stack emissions
CBS boiler stack emissions On the afternoon of Thursday, July 12, 2018, one of the boilers developed a large split in one of the boiler water tubes. This caused a large leak of boiler water into the boiler itself, and required the emergency shut-down of the boiler. During the shutdown process, the f
Slide 14: CBS boiler stack emissions
CBS boiler stack emissions Result • As the flares open, an ignition system lights the gas to burn the gas. The coke battery was then placed on idle until the steam supply was restored. • With only one boiler operating to consume the coke oven gas, the pressure in the gas coke ovens remained higher t
Slide 15: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 20 June 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Technical St
Slide 16: Benzene
Benzene
Slide 17: Sampling Strategy – Benzene
Sampling Strategy – Benzene The goal is to identify additional fugitive sources of benzene to assess the quantity and frequency to answer the question, Is the source significant and can it be reduced? • Monitor – Hand-held with Photoionization Detector for VOCs (specific for benzene) • Monitor the p
Slide 18: Sampling Locations – Benzene
Sampling Locations – Benzene
Slide 19: Sampling Locations – Benzene
Sampling Locations – Benzene 1 #7 Battery Underfiring Waste 13 Flushing Liquor Sump 25 Light Oil Loading Pump 37 Process Water Decanter Gas Tunnel Sump 2 #7 Battery COG Line to Stack 14 Excess Liquor Sump 26 Cold Wash Oil Decanter 38 Ammonia Plant Depurator Burner 3 Coke Shed 15 #1 or #2 Tar Product
Slide 20: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 20 June 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Technical St
Slide 21: Technical Standard for Integrated Steel Plants
Technical Standard for Integrated Steel Plants Compliance options under O.Reg. 419: • Meet the Point of Impingement (POI) limits for all the parameters being released • Site Specific Standard (SSS) – POI limit specific to a facility based on the technical options available to reduce emissions • Tech
Slide 22: Technical Standard for Integrated Steel Plants
Technical Standard for Integrated Steel Plants Technical Standard A technical standard is a technology-based solution designed for two or more facilities in a sector that are not able to meet an air standard due to technical or economic limitations. This approach can include technology, operation, m
Slide 23: Technical Standard for Integrated Steel Plants
Technical Standard for Integrated Steel Plants If the technical standards published address all sources of a contaminant from a facility, then the registered facility is exempt from the relevant air standard – and instead must abide by the requirements of the technical standard. If the published tec
Slide 24: Technical Standard for Integrated Steel Plants
Technical Standard for Integrated Steel Plants In the development of a technical standard, the Ministry of the Environment assesses all sources of a contaminant related to a North American Industry Classification System (NAICS) code, and makes a decision as to whether or not that source needs to be
Slide 25: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 20 June 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Technical St
Slide 26: Agenda
Agenda 1. Welcome and Safety Contact 2. Review and Approval of Agenda 3. Review and Approval of Minutes of 20 June 2018 4. Performance under O.Reg. 419/05 Site Specific Standard Order – Particulates 5. Monitoring Requirements under O.Reg. 419/05 Site Specific Standard Order – Benzene 6. Technical St
Slide 27: Thank You.
Thank You. stelcocanada.com