White Cliff Minerals Limited · ASX:WCN

White Cliff Minerals — Investor Presentation (August 2026)

28 slides from White Cliff Minerals's investor presentation, August 2026

  1. Slide 1: Advancing A Material Copper Discovery

    OTC: WCL MF | AS X: WCN I N V E S T O R P R E S E N T A T I O N Advancing A Material Copper Discovery ASX WCN | OTCQB WCMLF WCMINERALS.COM.AU W CM IN ERA L S .c om. a u

  2. Slide 2: Company Overview

    COMPANY OVERVIEW The information contained in this presentation has been prepared by White Cliff Minerals Limited (the Company). To the maximum extent permitted by law, the Company and its related bodies corporate, affiliates and each of their respective directors, officers, partners, employees, adv

  3. Slide 3: Investor Highlights

    INVESTOR HIGHLIGHTS Clear Company Defining a large-scale copper opportunity in one of the world’s leading mining jurisdictions Strategy Exciting, Early-Stage White Cliff has secured the largest land position in a rapidly emerging high-grade copper district, providing a clear first-mover advantage. N

  4. Slide 4: Rae Copper-Silver Project

    RAE COPPER-SILVER PROJECT P ROJ EC T O VERV IEW & S C ALE LOCATION Cu Ag Nunavut, Canada RAE PROJECT Ideally located a short flight from the regional mining hub of Yellowknife & 75km from the coastal port town of Kugluktuk CANADA N UN AVU T C RITIC AL M INE RALS RU SH THE RUSH IS ON ▪ Critical miner

  5. Slide 5: Access & Infrastructure

    ACCESS & INFRASTRUCTURE LO C AT ED P R O XI M AL TO PO R T AN D I N FR A S TR UC TU R E T H E R AE PR O J EC T | L OG I S TI C S & I NF R A ST RU CT UR E ▪ Strategically located 75km from Kugluktuk, providing local logistics support and future barge access to the proposed deep-water port at Grays Ba

  6. Slide 6: Rae Project Area

    RAE PROJECT AREA D I S TR I C T- S C AL E C O P PE R S YS TE M C O N FI R M ED | 20 2 6 D R I LLI N G EX PA ND S SC A LE S I GN I FI C A NTL Y Diamond Drilling @ the Rae Project Example of chalcopyrite-bornite hosting quartz-carbonate veining in STK25001 between 181.30 and 181.52m downhole. Core dia

  7. Slide 7: Rae Project Strategy

    RAE PROJECT STRATEGY D UA L - P R ON GED S TR ATE GY UND E R WA Y AT R AE 1. Danvers High-Grade Vein Hosted Copper Deposit AD VA N CI N G D AN VE R S T O R E S OU R CE DE F I N I T I ON N E X T S T E PS ▪ Phase 1 regional drilling complete with 44 holes, 11.8km of prospective strike tested along the

  8. Slide 8: Danvers | 2025 Drilling Results

    DANVERS | 2025 DRILLING RESULTS HIGH -GRA DE CO P PER SYSTEM H I G H L I G H T I NT E R C E P T S (1) DAN 2 5 00 8 175m @ 2.5% Cu & 8.66g/t Ag · incl 14m @ 7.55% Cu · open DAN 2 5 00 5 90m @ 4.0% Cu & 7.5g/t Ag from surface · incl 18m @ 6.5% Cu DA N 2 5 00 6 75m @ 2.0% Cu & 6.8g/t Ag from 7m · incl

  9. Slide 9: Danvers | Tier 1 Scale

    DANVERS | TIER 1 SCALE 2 02 6 D R I LL IN G AD VA NC E S D I S TR I C T - S C AL E C O P PE R T A R GET | > 95 % D R I LL IN G S T R I KE R A T E F OR C U MI NE R ALI S A T I O N T O D A T E Phase 1 Regional Drill Testing Complete 11,800m of strike tested(1) >11.8km >11.2km Phase 1 strike tested Cu

  10. Slide 10: Danvers | Scale Redefined

    DANVERS | SCALE REDEFINED D I S TR I C T- S C AL E C O P PE R S YS TE M C O N FI R M ED | HI GH - GR A D E A S S AYS VA LI D AT E S C A LE AC R O S S D A NVE R S HIGHLIGHTS FROM ASSAYS (1) ▪ Regional scale confirmed with DAN26001 collared >5.2km SW of Danvers 1 ▪ Phase 1 regional drilling complete a

  11. Slide 11: Danvers | A Copper System Capable of Expansion

    DANVERS | A COPPER SYSTEM CAPABLE OF EXPANSION T W O C L E AR S T R U C T U R E S P R O V I D E A C ON T I N U OU S , O PE N C OP P E R S Y S T E M C ON F I R M E D AC R O S S 1 1K M + O F S T R IK E (1) Transitioning from a High-Grade Discovery into an Understood, Vertically Continuous Copper Syste

  12. Slide 12: Project Pipeline & Exploration Upside

    PROJECT PIPELINE & EXPLORATION UPSIDE 2 02 4 F IELD CAM PA IGN PRO VIDES UN TAP P ED E XP LO RA TION U PS IDE Vision A newly discovered ±10km NE/SW structural corridor along the Herb Dixon fault where assays included 64.02% Cu & 152g/t Ag (F005965), 62.02% Cu (F005966) from a recent field sampling c

  13. Slide 13: Sedimentary Copper

    SEDIMENTARY COPPER MA IDEN DRILL ING ▪ Sediment Hosted Copper Systems - Drilling is targeting a laterally extensive, sheet-like, copper horizon where copper mineralisation is typically hosted within a vertically constrained interval ranging from approximately 2m to 30m thick ▪ 2026 drilling continue

  14. Slide 14: Sedimentary Copper

    SEDIMENTARY COPPER A 1 20 K M2 S EDIME NTA RY BAS IN N OW UNDE R S YS TE MATIC DIAM ON D T ES TING ▪ 2026 diamond drilling confirms visible chalcopyrite in all Hulk holes drilled to date ▪ 2025 results from the first diamond drillhole confirmed sediment-hosted copper mineralisation: • STK25001 retur

  15. Slide 15: Upcoming Activity

    SS UPCOMING ACTIVITY NE W SF L OW & W HA TS N EX T At Danvers drilling focusses on testing depth continuity and building out the resource volume of the Drilling & Assay highest-priority, high grade mineralised zones. At the sedimentary targets, drilling is vectoring toward Results from Rae the core

  16. Slide 16: Board

    BOARD EXPERIENCE D · COMMITTE D · INV ESTED Gavin Rezos Troy Whittaker Eric Sondergaard Sara Kelly John Hancock Non-Executive Chairman Managing Director Executive Director Non-Executive Director Non-Executive Director Chairman & CEO roles across 25+ years spanning Registered Professional 20+ years a

  17. Slide 17: Corporate Overview

    CORPORATE OVERVIEW Capitalisation A$0.018 3,304M A$59.5M A$8.34m(2) A$51.1m A$4.5m(3) Data(1) VALUE OF WCN’S GBL HOLDING SHAREHOLDER INFO $0.025 Top 20 40.44% Board & Management 15.83% $0.023 # of Shareholders 3740 $0.021 $0.019 WCN 52W PERFORMANCE 52w high $0.028​ $0.017 52w low $0.012 $0.015 Avera

  18. Slide 18: Competent Person Statement

    COMPETENT PERSON STATEMENT THE INFORMATION CONTAINED IN THIS PRESENTATION HAS BEEN This presentation relies on information previously released to the Australian Securities Exchange: PREPARED BY WHITE CLIFF MINERALS LIMITED (THE COMPANY). 13 August 2026 "Assays confirm high-grade copper continuity to

  19. Slide 19: Technical Annexures

    Technical Annexures ASX WCN | OTCQB WCMLF WCMINERALS.COM.AU 18

  20. Slide 20: Danvers | Regional Structure & Diamond Drilling

    DANVERS | REGIONAL STRUCTURE & DIAMOND DRILLING A R EGIO NAL STR UCTUR E W ITH C LEAR C OPP ER EN DO WMENT ▪ The Teshierpi fault zones is a major regional structure, trending south west / north east - with clear copper endowment ▪ Drilling (both RC & Diamond) has targeted the magnetic lows - interpr

  21. Slide 21: Danvers | Key Mineralisation Styles

    DANVERS | KEY MINERALISATION STYLES F OUR STYLES C ONTROL CO PPER DIS TRIBUTION Figure - Danvers Copper Distribution Figure - Danvers Breccia System ▪ Crackle & Mosaic Breccias • Early formed breccias with only minor clast movement and disaggregation; chalcocite-bornite-chalcopyrite-calcite cement ▪

  22. Slide 22: Danvers Geology

    SS DANVERS GEOLOGY Figure - Long section of Danvers 1, with the Company’s first diamond drill hole DAN26026 highlighted Di amo n d Dri l li n g th e K ey to Un l o ck in g Geo l og i cal Mo de l Danvers 1 & Extensions ▪ Mineralisation at Danvers 1 is hosted within a chaotic breccia that is strongly

  23. Slide 23: Danvers Geology

    SS DANVERS GEOLOGY Figure - Photographs of NQ2 diameter diamond drill core. Clockwise from top left depths are 208m, 211m, 229.3m, 241.1m. Images show variably altered (chlorite and hematite) chalcocite bearing basalts. Chalcocite forming breccia cement and veinlets with calcite and chlorite. Di amo

  24. Slide 24: Danvers Drill Targeting

    SS DANVERS DRILL TARGETING ADV AN C ED G EOP HYS IC S DRIVE TARGE T GENE RATIO N >95% Drilling success rate - Hitting Cu mineralisation ▪ Latest generation airborne geophysics used - HeliTEM® helicopter time-domain AEM provided high-resolution earth conductivity imaging with enhanced sensitivity to

  25. Slide 25: Sedimentary Copper | Rae District

    SEDIMENTARY COPPER | RAE DISTRICT T R UE R E G I ON AL S C AL E | T H E G RE AT E R R A E O P PO R T UN I T Y ▪ One of the largest emerging sedimentary copper targets worldwide ▪ The Rae project area is similar in age, geology and formation to both the Central African Copperbelt and the European Per

  26. Slide 26: Sediment Hosted Copper | Formation

    SEDIMENT HOSTED COPPER | FORMATION AL L K EY REQ UIREME NTS : 1 . S O URC E ROC K S ; 2 PA THW AY S & 3. HO S T RO C K S Fertile structures - semi-massive chalcopyrite structures below Rae Group Rae Copper Project now proven host to all 1st order required controls for Sedimentary Copper - Identified

  27. Slide 27: Sediment Hosted Copper | Formation

    SEDIMENT HOSTED COPPER | FORMATION S C H EMA TI C S EC TI O N OF S ED I MEN T H O ST ED CO P PE R F O R MAT IO N ASX WCN | OTCQB WCMLF WCMINERALS.COM.AU 26

  28. Slide 28: Contact

    M I N E R A L S CONTACT Troy Whittaker Harry Spillane Managing Director | White Cliff Minerals Investor Relations | Blackwater Advisors E: info@wcminerals.com.au E: harry@blackwateradvisors.com.au P: +61 8 9486 4036 P: +61 447 757 550 O T C :ASX W CWCN L M F | |OTCQB A S XWCMLF : WCN WCMINERALS.COM.

White Cliff Minerals — Investor Presentation (August 2026) on 6ix