Slide 1: The DuPont Bold Energy Plan
The DuPont Bold Energy Plan Five Steps on the Journey to Sustainability Gordon Skerry Senior Consultant – Energy Mining and Metals DuPont Sustainable Solutions 1
Slide 2: Committed to Zero
Our Core Values Are More Than Just Goals. They reflect the way we work and how we operate every day – with our customers, with our partners from around the world, and in the communities in which we operate. Committed to Zero 2
Slide 3: The DuPont Bold Energy Plan
The DuPont Bold Energy Plan In 1999 DuPont decided to “HOLD” energy use flat • No increase in GJ (or Millions of BTU) against 1990 baseline (Achieved 2010) • Reduce GHG by 65% against 1990 (Achieved 2004) • Business must continue (Business not as usual) In 2008, DuPont believed that it could exceed
Slide 4: DuPont has achieved a significant footprint reduction
DuPont has achieved a significant footprint reduction * TRI = Toxic Release Inventory Sources: Cost savings: Over US$6 Billion DuPont Global Reporting Initiative (GRI) report: Industry recognition: “Laggard” to “Leader” http://www2.dupont.com/Sustainability/en_US/assets/downloads/2 011_DuPont_GRI_
Slide 5: The DuPont Five Step Process
The DuPont Five Step Process: 1 Elevate Energy Cost as a Strategic Business Issue 2 Execute the Right projects to drive Maximum Gains 3 Connect Diverse and Complex Components of Energy Management 4 Vertically Integrate Management Structures to Drive Results Develop Skills and Capabilities to 5 Suppo
Slide 6: Elevate Energy Cost as a Strategic Business Issue
1 Elevate Energy Cost as a Strategic Business Issue Assume a $100 million energy cost business: • 5% saving is $5 million (Year on year); • a 15% stretch target is $15 million per annum? • DuPont assumes 40% from Low Cost actions; • This leaves 60% of projects requiring Capital? Assume 60% of projec
Slide 7: Execute the Right Projects to drive the Highest Gains
2 Execute the Right Projects to drive the Highest Gains Review the total list of EE projects available Sort projects and Opportunities: • 40% savings from asset optimisation? • Low cost or no cost? • Projects requiring major capital works? • Maximize Government Programs; Prioritise high gain / low i
Slide 8: Connect Diverse Components of Energy Efficiency
Connect Diverse Components of Energy 3 Efficiency STRONG LEADERSHIP APPROPRIATE STRUCTURE FOCUSED PROCESSES AND ACTIONS 8
Slide 9: Connect Diverse Components of Energy Efficiency
Connect Diverse Components of Energy Efficiency Leadership Engaged & Committed Board Structure Corporate Energy Efficiency Leader Challenging Goals, Policies, & Integrated Energy Efficiency Principles Organization Process Access to capital for efficiency Responsible Line Organization imp
Slide 10: Vertically Integrate Management Structures to Drive Results
4 Vertically Integrate Management Structures to Drive Results • Senior Leadership Commitment and Oversight • Local Manager with improvement objectives • Tracking performance against targets • Capital for improvements • Energy Centre of Competence • Peer networks and communities • Hundreds of Site Ch
Slide 11: Develop Skills and Capabilities to Support Cultural Change
5 Develop Skills and Capabilities to Support Cultural Change Cultural Change Requires Sustainability to be Integrated into Production 1. Build the Business Case for Sustainability 2. Understand the Impact of the Key Drivers 3. Integrate Sustainability into the Ambition, Strategy and Objectives 4. Ma
Slide 12: The DuPont Production System
The DuPont Production System “Everyone, everyday in pursuit of Operations Excellence” “Get it right the first time, every time” Bold Energy Plan 12
Slide 13: Integrated Operations Management Systems
Integrated Operations Management Systems Managing Technical Model Capabilities Mindsets and Process Engine Behaviors Current and Required future Business Role modeling/ requirements outcomes Delivery example coaching for capability dialogue/ and difficult performance 6 discussions Focus on what The
Slide 14: Tracking Performance vs. Target
14 Tracking Performance vs. Target Smaller Footprint • Having a target is useless unless you “keep score” • DuPont uses a BEP spreadsheet that tracks performance • Progress is measured by the savings achieved from individual improvement projects at each plant • The database currently tracks over 1,6
Slide 15: The DuPont Bold Energy Plan Results
The DuPont Bold Energy Plan Results Year 2008 2009 2010 2011 2012 Number of Sites 49 73 98 103 122 Corporate Savings 5% 5% 5% 4% 4% Target % spend Savings Achieved 5.3% 4.3% 6.0% 6.9% 3.9% Projects Completed 285 305 301 326 239 Energy Savings PJ 4.7 2.1 2.2 5.8 6.5 CO2 Reduction ~kt 255 120 128 529
Slide 16: The DuPont Bold Energy Plan Results
The DuPont Bold Energy Plan Results Total savings of $229M from new projects: • 5.2% of the ~US$4.4 Billion spent from 2008- 2012; What is not shown here is the ongoing savings from energy projects being maintained from prior years; • This ~5%, year-over-year (combined with production growth indicat
Slide 17: DuPont is on track to deliver 2015 Footprint and Market Facing Goals
DuPont is on track to deliver 2015 Footprint and Market Facing Goals Reducing Environmental Footprint Greenhouse Gas Emissions > 14.62 Million t CO2-e Water Conservation > 8 billion litres Fleet Fuel Efficiency > 100% leading tech vehicles Air Carcinogens > 400 tonnes 100% Independent Veri
Slide 18: The Bold Energy Plan in Summary
The Bold Energy Plan in Summary The DuPont “Bold Energy Plan” • Continues to deliver up to 5% energy savings year on year DuPont uses a five-step process to ensure: • Projects are understood and supported by business leaders, managed and tracked and • Have capital available, wherever practicable. A