Equinox Gold Corp. · AMEX:EQX

Equinox Gold — Investor Presentation (August 2023)

28 slides from Equinox Gold's investor presentation, August 2023

  1. Slide 1: Creating the Premier Americas Gold Producer

    equinoxgold.com Creating the Premier Americas Gold Producer CORPORATE PRESENTATION August 2023

  2. Slide 2: Cautionary Notes

    Cautionary Notes Forward-looking Statements. This presentation contains certain forward-looking information and forward-looking prices for energy inputs, labour, materials, supplies and services; fluctuations in currency markets; operational risks statements within the meaning of applicable securiti

  3. Slide 3: Equinox Gold: Creating the Premier Americas Gold Producer

    Equinox Gold: Creating the Premier Americas Gold Producer In its first five years Equinox Gold has grown from a single-asset developer to a diversified gold producer with the assets in place to produce more than 1 Moz of gold annually1 2018 2019 2020 2021 2022 20232 25,601 oz 201,017 oz 477,186 oz 6

  4. Slide 4: Diversified Producer: Mines, Countries, New Mine

    Diversified Producer: 7 Mines, 4 Countries, 1 New Mine in 2024 7 1 3 Producing Mine in Expansion Mines Construction Projects Greenstone (60%) Castle Mountain / Expansion ~17 Moz ~16 Moz Mesquite P&P Gold M&I Gold Reserves Resources1 Los Filos / Expansion Aurizona / Expansion Santa Luz ~590 Koz ~$300

  5. Slide 5: Seven Operating Mines: 555,000 - 625,000 oz of Gold Expected in 2023

    Seven Operating Mines: 555,000 - 625,000 oz of Gold Expected in 20231 Aurizona, Maranhão, Brazil Mesquite, California, USA 120,000 - 130,000 oz of gold 80,000 - 90,000 oz of gold Fazenda, Bahia, Brazil Castle Mountain, California, USA 60,000 - 65,000 oz of gold 25,000 - 30,000 oz of gold Santa Luz,

  6. Slide 6: Greenstone: On Budget and On Track for H1 2024 Production

    Greenstone: On Budget and On Track for H1 2024 Production ~400,000 oz gold expected per year1 ~$170 M remaining spend2 1.27 g/t gold average grade ~5.5 Moz P&P Reserves1 ~2.6 Moz M&I Resources1 1. Average annual production for the first five years, of which 60% is attributable to Equinox Gold. See T

  7. Slide 7: Greenstone: Building one of Canada's Largest Gold Mines

    Greenstone: Building one of Canada’s Largest Gold Mines ~400,000 oz gold/year for first five years1, 14+ year mine life • Developed by Equinox Gold (60%) and Orion (40%) • More than 5 Moz1 of gold expected to be produced over initial mine life • Expansion and extension potential from additional depo

  8. Slide 8: Greenstone: On Budget and On Track for H1 2024 Production

    Greenstone: On Budget and On Track for H1 2024 Production Progress at July 21, 2023 • Overall project 85% complete • Construction 83% complete • Procurement 87% complete • Concrete 93% complete • Structural steel 89% complete • Piping and electrical 67% complete Ball mills • Capital spend 76% comple

  9. Slide 9: Organic Growth: Expansion Projects

    Organic Growth: Expansion Projects Castle Mountain Mine, California, USA Increase mining to stack over 45,000 t/d on heap leach pads ~218,000 oz/year expected average annual production, 14-year mine life1 Aurizona Mine, Maranhão, Brazil Mining of new underground and additional open-pit deposits conc

  10. Slide 10: Peer-leading Growth Profile: Organic Growth from Existing Assets

    Peer-leading Growth Profile: Organic Growth from Existing Assets P/NAV1 (x) 2025E Production1 (Moz Au) 2022E - 2025E Prod. Growth1 (%) Total Reserves1,2 (Moz Au) Evolution 1.24x Northern Star 1.9 Equinox Equinox Gold 64% Northern Star 20.2 Alamos 1.09x Endeavour 1.4 New Gold 48% Equinox Gold Equinox

  11. Slide 11: Investing in Growth: Assets in Place for 1+ Moz Annual Production

    Investing in Growth: Assets in Place for 1+ Moz Annual Production Potential for ~575 Koz incremental growth1 Revaluation potential with growth2 • Enhanced scale and diversity with Greenstone • Increased production, higher cash flow, lower costs • Catalyst rich investment plans • Enhanced diversifica

  12. Slide 12: Financial Strength: Funded to Deliver Growth

    Financial Strength: Funded to Deliver Growth1 Cash 2 Debt Available 3 Investments 6 Resilience Unrestricted cash Corporate revolver Equity investments $75 M available through ~$174 M $127 M 4 ~$140 M ATM facility pursuant to $500 M base shelf Ongoing cash flow Accordion prospectus 7 from seven $100

  13. Slide 13: ESG: Committed to Responsible and Ethical Mining

    ESG: Committed to Responsible and Ethical Mining Target to achieve 25% reduction in GHG emissions by 2030 ENVIRONMENT SOCIAL GOVERNANCE • Beat 2022 environmental • Beat 2022 health and safety • Expanded ESG disclosure incident target by 61%1 target by 36%2 and performance metrics • Improved environm

  14. Slide 14: Aligned with Investors: Peer-leading Insider Ownership

    Aligned with Investors: Peer-leading Insider Ownership 8.2% 1.4% Insider Ownership2 Ross Beaty Equinox Gold Other Insiders Endeavour Mining 18.1% Shareholders1 12% High Net Worth EquinoxEquinox Gold 8.6% 12% Retail/Other Evolution 1.1% 65% Corporate B2Gold 0.9% 2% Institutional Eldorado 0.8% SSR Min

  15. Slide 15: Equinox Gold: Creating the Premier Americas Gold Producer

    Equinox Gold: Creating the Premier Americas Gold Producer USA Canada ~4.6 Moz Reserves ~3.3 Moz Reserves3 ~115 Koz annual production1 ~240 Koz annual production3 ~300 Koz with expansion2 First production in H1 20241 Mexico Brazil ~5.4 Moz Reserves ~3.6 Moz Reserves ~170 Koz annual production1 ~310 K

  16. Slide 16: Appendix

    Appendix 16

  17. Slide 17: Equinox Gold: Corporate Summary

    Equinox Gold: Corporate Summary Common Shares 1 313.0 M Avg. Daily Shares Traded 5 TSX: 1.4 M + NYSE-A: 2.0 M Options @ avg. C$5.61 1,2 1.2 M Cash 6 ~ US$174 M Restricted Share Units 3 6.8 M Net Debt 7 ~ US$661 M Potential Shares from Convertible Notes 44.5 M Convertible Notes @ avg. US$6.52 8 US$27

  18. Slide 18: 2023 Plan: Production and Cost Guidance

    2023 Plan: Production and Cost Guidance Sustaining Growth Production Cash Costs1,2 AISC1,2 Expenditure Expenditure (ounces) ($/ounce) ($/ounce) 70,000 ounces more ($M)1,2 ($M)2 than normalized Mesquite 80,000-90,000 $1,345-$1,410 $1,415-$1,480 $5 $16 2022 production6 Castle Mountain 25,000-30,000 $1

  19. Slide 19: Greenstone: Near-Mine & Belt-Scale Exploration Potential

    Greenstone: Near-Mine & Belt-Scale Exploration Potential Belt-scale potential Near-mine potential 1 10km 1 Hosts the unexploited Kailey Deposit) 1. Northern Empire, Sand River and Greenstone Satellite Mineral Resource Estimate Leitch held 100%(Exclusive by Equinox Gold. of Mineral Reserves) Deposit

  20. Slide 20: Castle Mountain: Easy Site Access, Synergies with Mesquite

    Castle Mountain: Easy Site Access, Synergies with Mesquite Phase 2 expansion will be contained within existing approved mine Castle Mountain boundary Mesquite 20

  21. Slide 21: Aurizona: Mine Life Extension Along Strike and Underground

    Aurizona: Mine Life Extension Along Strike and Underground PIABA NORTH Numerous TREND deposits within Tatajuba grades similar GENIPAPO MESTRE or higher than Piaba: CHICO trucking • 13.74 g/t Au/ 35 m distance of • 2.71 g/t Au/ 56 m PIABA MICOTE • 2.47 g/t Au/ 69 m existing plant • 1.42 g/t Au/ 34 m

  22. Slide 22: Bahia: District-scale Potential Between Fazenda – Santa Luz Mines

    Bahia: District-scale Potential Between Fazenda – Santa Luz Mines 22

  23. Slide 23: Non-core Assets: Bringing Value to Equinox Gold

    Non-core Assets: Bringing Value to Equinox Gold Divest: Mercedes & Pilar Launch: Solaris Create: i-80 Gold Create: Sandbox Royalties Sold non-core assets Spin-out to shareholders Spinco from Premier acquisition Spin-out non-core royalties ~$175 M (Total value) $640 M (Current market cap) $630 M (Cur

  24. Slide 24: Equinox Gold: Proven & Probable Mineral Reserves

    Equinox Gold: Proven & Probable Mineral Reserves1 Proven Probable Proven & Probable Mine/Project Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained (kt) (g/t) gold (koz) (kt) (g/t) gold (koz) (kt) (g/t) gold (koz) Mesquite 34 0.79 1 30,264 0.48 470 30,298 0.48 471 Castle Mountain 8

  25. Slide 25: Equinox Gold: Measured & Indicated Mineral Resources

    Equinox Gold: Measured & Indicated Mineral Resources1,2 Measured Indicated Measured & Indicated Mine Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained (kt) (g/t) gold (koz) (kt) (g/t) gold (koz) (kt) (g/t) gold (koz) Mesquite 81 0.77 2 104,910 0.41 1,382 104,991 0.41 1,384 Castle

  26. Slide 26: Equinox Gold: Inferred Mineral Resources

    Equinox Gold: Inferred Mineral Resources1 Contained Gold Mine Tonnes (kt) Grade (g/t) (koz) Mesquite 84,030 0.34 912 Castle Mountain 69,890 0.63 1,422 Los Filos 135,935 0.74 3,237 Aurizona 12,689 2.19 895 Fazenda 3,283 1.50 158 RDM 3,614 1.95 226 Santa Luz 7,254 2.09 490 2 Greenstone 14,969 3.83 1,8

  27. Slide 27: Equinox Gold: Technical Disclosure

    Equinox Gold: Technical Disclosure National Instrument 43-101 Scientific and technical information concerning the Los Filos Mine Complex is summarized, derived, or Scientific and technical information concerning the Hasaga Property is summarized, derived, or extracted extracted from the “Updated Tec

  28. Slide 28: ir@equinoxgold.com www.equinoxgold.com

    +1 604.558.0560 ir@equinoxgold.com www.equinoxgold.com 28 TSX: EQX | NYSE-A: EQX

Equinox Gold — Investor Presentation (August 2023) on 6ix