    CAUTIONARY INFORMATION This presentation contains forward-looking information within the meaning of applicable Canadian and United States securities legislation. All information contained in this presentation, other than statements of current and historical fact, is forward-looking information. Ofte

  3. Slide 3: H' DBAY

    H' DBAY

  4. Slide 4: Consolidated Copper

    REVENUE BY METAL 2021E1 2022E1 DIVERSIFIED MID-TIER 3% 10% 2% COPPER PRODUCER 17% Cu Au 4% 5% Copper represents $1.7B Ag $1.9B 59% 54% 25% approximately 60% of Hudbay’s Zn 21% Mo revenues Existing operations offer significant near-term growth in ANNUAL COPPER PRODUCTION & CASH COSTS2,3 copper and go

  5. Slide 5: Copper Demand Drivers

    COPPER DEMAND DRIVERS GROWING DEMAND FOR “GREEN” COPPER Global De-carbonization Copper is one of the most heavily utilized metals in renewable energy systems and is the least carbon- intensive Electrification of Vehicles EVs require nearly 4x more copper than a conventional gas vehicle EV production

  6. Slide 6: Copper Supply Gap

    COPPER SUPPLY GAP GLOBAL COPPER MINES AND PROJECTS UNABLE TO MEET LONG-TERM DEMAND EXPECTATIONS Mt Base Case Production Capability Declining Copper Grades Probable Projects 35 Primary Demand Global copper resources continue to be depleted and the average mined copper 30 grade has declined by more th

  7. Slide 7: Hudbay Copper Growth

    HUDBAY COPPER GROWTH INCREASED COPPER RESOURCES & ATTRACTIVE COPPER PRODUCTION GROWTH Increased copper-equivalent resources per share by more than 2.5x over the past 10 years and copper production per share is expected to increase by 36% by 2023 COPPER RESOURCES PER SHARE1 COPPER PRODUCTION PER SHAR

  8. Slide 8: H' DBAY

    H' DBAY

  9. Slide 9: Copper Quality Assets

    Peru – 17-year mine life Constancia Exploration Properties 100% ownership Maria Reyna Open pit copper/molybdenum mine and concentrator Caballito Annual average Cu and Au production 1 of 102kt and 58koz, respectively Kusiorcco Pampacancha 100% ownership Llaguen Open pit copper/gold mine Annual averag

  10. Slide 10: South America Business Unit

    Cusco SOUTH AMERICA CUSCO BUSINESS UNIT Las Bambas CONSTANCIA Yauri PERU Tintaya Antapaccay MINE Lima TOWN AREQUIPA Imata RAIL ROAD CONSTANCIA Arequipa Cerro Verde MOQUEGUA & Peru Economic Risk Business Political Risk Commercial Risk Financing Risk Matarani Environment Risk BB2 Medium Risk 0 TACNA 1

  11. Slide 11: Constancia Mill Throughput

    Cu-Mo 86k tpd CONSTANCIA MINE 17 YEARS MINE LIFE PORPHYRY DEPOSIT MILL CAPACITY 102kt 58koz $1.15/lb 8-YEAR AVG. 8-YEAR AVG. 8-YEAR AVG. CU PRODUCTION1 AU PRODUCTION1 CASH COSTS1 PLANT THROUGHPUT 90 86 86 86 Constancia Mill Throughput 79 Rate (ktpd) 75 76ktpd (original design capacity) 60 2017A 2018

  12. Slide 12: Pampacancha in Full Production

    PAMPACANCHA IN FULL PRODUCTION ACHIEVING TARGETED MINING RATES IN THE PAMPACANCHA PIT Significantly higher gold grades from Pampacancha and record gold recoveries in Q3 Mined 2.1 million tonnes from Pampacancha in Q3, a 109% increase from Q2 On track to achieving increased gold grades in 2021 and hi

  13. Slide 13: Peru Exploration Potential

    PERU EXPLORATION POTENTIAL SEVERAL OPPORTUNITIES EXIST ON HUDBAY’S EXTENSIVE LAND PACKAGE IN PERU CONSTANCIA SATELLITE EXPLORATION TARGETS Geophysics indicate several nearby exploration targets within trucking distance of Constancia’s infrastructure - Maria Reyna and Caballito have Maria Reyna & Kus

  14. Slide 14: Manitoba Business Unit

    New Britannia Gold Mill MANITOBA BUSINESS UNIT 1,500 tpd capacity Snow Lake Stall Base Metal Mill 3,800 tpd capacity MINE LALOR MINE ~4,650 tpd MILL TOWN RAIL ROAD LALOR 777 0 5km SASKATCHEWAN MANITOBA Winnipeg Snow Lake LALOR MINE 777 MINE ~2,800 tpd Flin Flon Canada Economic Risk Business Flin Flo

  15. Slide 15: Manitoba Operations

    17 / <1 YEARS Au-Zn-Cu 3.8 / 6.0k tpd MANITOBA OPERATIONS SNOW LAKE/ 777 MINE LIFE1 VMS DEPOSITS STALL MILL / FLIN FLON CONCENTRATOR CAPACITY 20-24kt 150-165koz 96-107kt 2021E CU PRODUCTION 2021E AU PRODUCTION 2021E ZN PRODUCTION LALOR & STALL TONNAGE 50% 5.0 Lalor Stall 30% 4.0 Throughput (k tpd) 3

  16. Slide 16: New Britannia Fully Commissioned

    NEW BRITANNIA FULLY COMMISSIONED FIRST GOLD POUR ACHIEVED & COPPER FLOTATION FACILITY IN OPERATION COPPER QUALITY ASSETS SUSTAINABILITY 16

  17. Slide 17: Snow Lake Exploration Potential

    SNOW LAKE EXPLORATION POTENTIAL LALOR IN-MINE EXTENSION POTENTIAL AND REGIONAL UPSIDE EXPLORATION OPPORTUNITIES Snow Lake deposits contain 1.5 million ounces of gold in inferred resources Lalor and 1901 inferred resources estimated using stringent methodology constraining the resource within a stope

  18. Slide 18: Arizona Business Unit

    ARIZONA BUSINESS UNIT Miami Pinto Valley Phoenix Resolution ARIZONA, US Ray Morenci Florence Safford MINE TOWN RAIL ROAD Silver Bell Phoenix Tucson Tucson Gunnison Mission ROSEMONT & COPPER WORLD Sierrita COPPER WORLD ROSEMONT United States Economic Risk Business Political Risk Commercial Risk Finan

  19. Slide 19: Rosemont Project

    19 YEARS CU-MO-AG $1.9B ROSEMONT PROJECT MINE LIFE PORPHYRY DEPOSIT CAPEX $769M / 15.5% 127kt $1.14/lb NPV / IRR FIRST 10-YEARS CU FIRST 10-YEARS CU PRODUCTION1 CASH COST1 COPPER PRODUCTION PROFILE Copper Production (kt in con) 180 $4.00 147 148 Copper Production Copper C1 Cash Costs 134 133 137 128

  20. Slide 20: Copper World Project

    COPPER WORLD PROJECT SIGNIFICANT NEW DISCOVERY ADJACENT TO ROSEMONT Located on private patented mining claims in a historical mining district; 2020 & 2021 exploration work identified 7 deposits as a potential viable open pit operation separate or additive to Rosemont Potential for economic copper su

  21. Slide 21: Nevada Mason Project

    NEVADA MASON PROJECT Power Plant Lyon County NEVADA Douglas County MacArthur Reno MASON PROJECT Yerington Blue Hill Mine (Historic) TOWN MASON Yerington Road HUDBAY MINERAL CLAIMS HUDBAY PRIVATE LAND CLAIMS POWER LINE Mason RAIL Las Vegas MINE / DEPOSIT Pumpkin Hollow Mason Valley Mines United State

  22. Slide 22: Mason Project

    2.2Bt $1.76/lb 27 YEARS MASON PROJECT M&I TONNAGE CU SUSTAINING CASH COST MINE LIFE 0.29% 112kt $773M / 15% M&I CU GRADE ANNUAL CU PRODUCTION NPV / IRR 1 MASON ECONOMICS1 $3,000 40% $2,500 After-Tax NPV10% (US$M) Unlevered IRR (%) $2,019 30% 23% $2,000 $1,500 18% 20% $1,191 15% 14% $1,000 $773 $519

  23. Slide 23: ESG

    SEE a Pine ESG H' DBAY

  24. Slide 24: Our Approach to Sustainability

    OUR APPROACH TO SUSTAINABILITY MUTUAL RESPECT, TRUST AND CONTINUOUS DIALOGUE By living our values, we build strong relationships with our employees, host communities and governments, making us a better partner and a better company Our Values are: Dignity & Respect: Caring: We treat our stakeholders

  25. Slide 25: Environment

    ENVIRONMENT WE AIM TO DEVELOP, OPERATE AND CLOSE MINES IN A MANNER THAT DEMONSTRATES OUR COMMITMENT TO ENVIRONMENTAL STEWARDSHIP TOTAL ENERGY CONSUMPTION Over 50% of our total energy consumption in 2020 was from renewable sources 9000 All electricity at operations supplied by regional grids 8500 ter

  26. Slide 26: Social Impact

    SOCIAL IMPACT ONE KEY LESSON WE HAVE LEARNED IN EXPLORING, DEVELOPING AND OPERATING MINES IS THE IMPORTANCE OF EARLY ENGAGEMENT WITH KEY STAKEHOLDERS 2020 community activities: Economic Contributions In Peru, we invested more than $4.6 million to support a wide range of community programs Community

  27. Slide 27: Health & Safety

    HEALTH & SAFETY CULTURE COMMITTED TO CONTINUOUSLY IMPROVING SAFETY PERFORMANCE Reduced both total recordable injury frequency and lost time injury severity in 2020 Fatality prevention is a priority after our first fatality in over 13 years occurred in 2021 Constancia first mine in Peru to obtain Saf

  28. Slide 28: Governance

    GOVERNANCE WE RECOGNIZE THE TREMENDOUS OPPORTUNITY THAT WE HAVE TO POSITIVELY CONTRIBUTE LOCALLY AND GLOBALLY TO A MORE SUSTAINABLE WORLD Focused on increased disclosure transparency Data mapped to GRI, SASB and TCFD Disclosure provided through CDP Climate, Water and Forests questionnaires In 2020,

  29. Slide 29: Sustainable Value Creation

    SUSTAINABLE VALUE CREATION WE ALLOCATE RISK-ADJUSTED CAPITAL TO CREATE VALUE ACROSS EVERY STAGE OF THE MINING LIFECYCLE WHILE ACHIEVING OUR SUSTAINABILITY TARGETS Health & Safety Successful Proven Mine Exploration Development Zero fatalities and a focus on fatality prevention Match or improve on our

  30. Slide 30: Executing Our Plan

    EXECUTING OUR PLAN 2021 KEY OBJECTIVES FOCUS on operational efficiencies, maintain low-costs of production to continue to generate positive cash flow and strong returns on invested capital EXECUTE development and commence mining activities at the high-grade Pampacancha satellite deposit DELIVER the

  31. Slide 31: Growing Production and EBITDA Outlook

    GROWING PRODUCTION AND EBITDA OUTLOOK ENTERING A PERIOD OF SIGNIFICANT PRODUCTION AND EBITDA GROWTH Completed period of investment and now at an inflection point in terms of meaningful copper and gold production growth, potentially leading to significant year-over-year growth in EBITDA Cu1 +46% Au1

  32. Slide 32: Copper Landscape Positioning

    COPPER LANDSCAPE POSITIONING HUDBAY OFFERS LEADING EXPOSURE TO COPPER, ATTRACTIVE COST POSITIONING AND STRONG ESG PERFORMANCE AMONG PEERS COPPER PRODUCTION GROWTH (2021-2023) 2022E COPPER AISC CURVE1 30% 20% 10% – (10%) TRQ CS LUN ERO FM ANTO HBM NAV SENSITIVITY TO +10% CHANGE IN COPPER PRICE PEER O

  33. Slide 33: Slide 33

  34. Slide 34: Near-Term Catalysts

    NEAR-TERM CATALYSTS NUMEROUS ORGANIC GROWTH OPPORTUNITIES EXIST Advance 3rd phase of Snow Lake gold strategy with updated mine plan ✓ Q1 2021 MANITOBA New Britannia gold plant ramp-up and first production ✓ Q3 2021 New Britannia copper flotation circuit ramp-up and first production ✓ Q4 2021 Prepara

  35. Slide 35: Leading Organic Growth Pipeline

    LEADING ORGANIC GROWTH PIPELINE HUDBAY HAS BUILT A DIVERSIFIED PORTFOLIO FOCUSED ON GROWTH THROUGH EXPLORATION AND M&A, WHILE DIVESTING NON-CORE ASSETS RESOURCE FEASIBILITY STUDY EXPLORATION PRODUCTION DEFINITION COMPLETE Constancia Norte Constancia Mine evaluating underground potential Cu-Mo-Au-Ag

  36. Slide 36: World-Class Management Team

    WORLD-CLASS PETER KUKIELSKI PRESIDENT & CEO More than 30 years of sector MANAGEMENT TEAM experience in base metals, precious metals and bulk materials across the PROVEN MINING INDUSTRY EXPERIENCE globe, including leadership positions at Nevsun, Anemka, ArcelorMittal, Teck and Noranda CASHEL MEAGHER

  37. Slide 37: Board of Directors

    BOARD OF STEPHEN A. LANG CHAIR DIRECTORS Stephen has over 40 years of experience in the mining industry, including engineering, development and production at gold, copper, coal and platinum group metals operations CAROL T. BANDUCCI IGOR GONZALES RICHARD HOWES DIRECTOR DIRECTOR DIRECTOR Carol was for

  38. Slide 38: Ample Liquidity & Long-Dated Debt Profile

    AMPLE LIQUIDITY & LONG-DATED DEBT PROFILE PRUDENT BALANCE SHEET MANAGEMENT LONG-TERM DEBT STRUCTURE PROVIDES SIGNIFICANT FLEXIBILITY Cash and Equivalents1 $297 million 4.5% Callable starting in 2023 due 2026 $600M $600M Revolver Availability2 $347 million (October 2025 Maturity) 6.125% Callable star

  39. Slide 39: 3-Year Production Outlook

    3-YEAR PRODUCTION OUTLOOK GROWING COPPER AND GOLD PRODUCTION CONTAINED METAL IN CONCENTRATE1 2021 GUIDANCE 2022 GUIDANCE 2023 GUIDANCE PERU Copper tonnes 72,000 - 88,000 95,000 - 120,000 105,000 - 130,000 Gold ounces 40,000 - 50,000 85,000 - 105,000 85,000 - 105,000 Silver ounces 1,800,000 - 2,170,0

  40. Slide 40: 2021 Cost Guidance

    2021 COST GUIDANCE CAPITAL EXPENDITURE GUIDANCE EXPLORATION EXPENDITURES 2021 2021 ($ MILLIONS) ($ MILLIONS) SUSTAINING CAPITAL Peru 20.0 Peru1 135.0 Manitoba 10.0 Manitoba 90.0 Arizona and other4 34.0 Total sustaining capital 225.0 Total exploration expenditures 64.0 GROWTH CAPITAL Capitalized spen

  41. Slide 41: Constancia Production Profile

    CONSTANCIA PRODUCTION PROFILE Incorporates higher grades from Pampacancha from 2022 to 2025 and the new Constancia Norte reserves to extend the medium-term production profile Average annual copper production increases to 102,000 tonnes over the next 8 years at an average cash cost of $1.15/lb Total

  42. Slide 42: Constancia 2021 Mine Plan

    CONSTANCIA 2021 MINE PLAN 17-YEAR MINE PLAN BASED ON PROVEN AND PROBABLE RESERVES ONLY Updated mine plan for Constancia operations reflects an increase in copper and gold production from 2022 to 2025 as the higher grades from the Pampacancha deposit enter the mine plan 2021 2022 2023 2024 2025 2026

  43. Slide 43: Constancia Norte

    CONSTANCIA NORTE UNDERGROUND POTENTIAL TO BE FURTHER INVESTIGATED There is an additional opportunity to include more reserves and/or improve the life of mine plan by mining some of the steeply dipping/narrower high-grade skarn mineralization as a satellite underground operation to the main Constanci

  44. Slide 44: Maria Reyna Historical Drill Results

    MARIA REYNA HISTORICAL DRILL RESULTS A summary of the historical drill results from Maria Reyna is contained in the table below, however a qualified person has not independently verified this historical data or the quality assurance and quality control program that was applied during the execution o

  45. Slide 45: Snow Lake Gold Strategy

    SNOW LAKE GOLD STRATEGY PHASE 1: Repositioning PHASE 2: Optimization PHASE 3: Historical Work Lalor as a Gold Mine & Execution Expansion Potential ✓2008 & 2009 – Au zone and Cu- ✓2018 – Completion of tradeoff ✓2020 – Optimized mine plan with ✓2021 – Further optimized mine plan Au zone identified stu

  46. Slide 46: Snow Lake Gold Production Profile

    SNOW LAKE GOLD PRODUCTION PROFILE Incorporates early production of gold at New Britannia in 2021 in addition to several near-to- medium term optimization initiatives: Increasing Lalor’s mining rate to 5,300 tpd starting in 2023 after the 777 mine closes Adding 1901 zinc-rich reserves to the mine pla

  47. Slide 47: Snow Lake 2021 Mine Plan

    SNOW LAKE 2021 MINE PLAN 17-YEAR MINE PLAN BASED ON PROVEN AND PROBABLE RESERVES ONLY Mine plan enhancements optimize processing capacity of the Snow Lake operations to maximize the NPV of the operations. As a result, the production of gold, copper and silver are expected to increase by 18%, 35% and

  48. Slide 48: Snow Lake Process

    SNOW LAKE PROCESS FLOW CHART - 2023 Lalor Crushed Ore Stall Mill New Britannia Mill Grinding Grinding Flotation Flotation Tails to Tails Zn Concentrate Cu Concentrate Cyanide Destruction Anderson TIA or Leaching/CIP Dewatering Dewatering Process Lalor Paste Plant Electrowinning Tails to Stall Mill (

  49. Slide 49: Snow Lake Processing Logistics

    SNOW LAKE PROCESSING LOGISTICS LALOR MINE 2021 11 years 2031 Source Ore 1901 DEPOSIT 2026 6 years 2031 SATELLITE GOLD DEPOSITS 2030 8 years 2037 (WIM, 3 ZONE) Processing STALL BASE METAL MILL Location 2021 11 years 2031 (WITH GOLD BY-PRODUCT) NEW BRITANNIA GOLD MILL 2021 17 years 2037 (WITH COPPER B

  50. Slide 50: Snow Lake Growth Over Time

    SNOW LAKE GROWTH OVER TIME OVER 2.9 MM OUNCES OF GOLD HAS BEEN IDENTIFIED AS RESERVES / PRODUCED TO DATE +300% INCREASE IN IDENTIFIED RESERVES / PRODUCED GOLD FROM INITIAL RESERVE ESTIMATE Cumulative Production 9% increase from Reserves 32% increase from resource conversion Inferred inclusion of sat

  51. Slide 51: Snow Lake Exploration Potential

    SNOW LAKE EXPLORATION POTENTIAL LARGE PROSPECTIVE LAND PACKAGE IN THE SNOW LAKE BELT WITH SIGNIFICANT UPSIDE POTENTIAL MINE MILL Asset Metal Type Reserves & Resources1 TOWN WIM PROJECT WIM Cu-Au Probable – 2,448kt @ 1.63% Cu; 1.6g/t Au 40kt Cu; 126koz Au RAILROAD Osborne Lake ROAD Indicated – 469kt

  52. Slide 52: Manitoba Regional Mines and Discoveries

    MANITOBA REGIONAL MINES AND DISCOVERIES RESERVES IN THE FLIN FLON AND SNOW LAKE CAMP (MILLION TONNES) Flin Flon Lalor Chisel U/G 777 Trout Lake Chisel Initial Reserves WIM Callinan Added Reserves Reed 1901 Centennial Chisel Pit Anderson Additional Deposits (not yet in reserves): Stall Lake Pen II 3

  53. Slide 53: Updated Flin Flon Closure Cost Plan

    UPDATED FLIN FLON CLOSURE COST PLAN 75% OF CLOSURE AND RECLAMATION COSTS ARE TO BE INCURRED AFTER 2037 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2122 $23M in tailings stability $13M in demolition costs between the close of Flin Flon

  54. Slide 54: Flin Flon Tailings Reprocessing

    FLIN FLON TAILINGS REPROCESSING OPPORTUNITY TO REPROCESS TAILINGS IN FLIN FLON Identified new opportunity to reprocess tailings at the Flin Flon Tailings Impoundment System Over 90 years of tailings deposition through several commodity cycles Could create operating and economic benefits for Flin Flo

  55. Slide 55: Copper World Project

    COPPER WORLD PROJECT EXPANDED PRIVATE LAND PACKAGE TO SUPPORT AN OPERATION ENTIRELY ON PRIVATE LAND Increased private land to the west, which together with patented mining claims, now totals ~4,500 acres to support an operation entirely on private land Review suggests the potential for both copper s

  56. Slide 56: Copper World Project

    COPPER WORLD PROJECT MINERALIZATION CLOSER TO SURFACE THAN ROSEMONT & FURTHER EXPLORATION POTENTIAL EXISTS Mineralization occurs at depths much shallower than Rosemont, indicating possibility of lower strip ratios at Copper World Potential for continuity between Bolsa and Rosemont Three new holes on

  57. Slide 57: Peru Mineral Reserves (as at January 1, 2021)

    PERU MINERAL RESERVES (AS AT JANUARY 1, 2021) CATEGORY TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CONSTANCIA Proven 436,500,000 0.29 83 0.041 2.88 Probable 56,100,000 0.25 69 0.045 3.09 TOTAL PROVEN AND PROBABLE 492,600,000 0.29 82 0.042 2.90 PAMPACANCHA Proven 32,400,000 0.59 178 0.368 4.48 Probable

  58. Slide 58: Peru Mineral Resources (as at January 1, 2021)

    PERU MINERAL RESOURCES (AS AT JANUARY 1, 2021) CATEGORY TONNES Cu (%) Mo (g/t) Au (g/t) Ag (g/t) CONSTANCIA Measured 125,200,000 0.22 65 0.038 2.11 Indicated 118,300,000 0.22 65 0.037 2.05 Inferred 46,600,000 0.30 73 0.054 2.72 PAMPACANCHA Measured 11,400,000 0.41 101 0.245 4.95 Indicated 6,000,000

  59. Slide 59: Snow Lake Reserves & Resources

    SNOW LAKE RESERVES & RESOURCES (AS AT JANUARY 1, 2021) PROPERTY CATEGORY TONNES Cu (%) Zn (%) Au (g/t) Ag (g/t) Proven Lalor 6,860,000 0.50 5.79 2.6 29 Base Metal Zone 1901 890,000 0.40 6.61 2.0 28 Probable Lalor 1,190,000 0.64 4.32 3.2 32 1901 690,000 0.25 9.49 1.4 30 Gold Zone Proven Lalor 3,950,0

  60. Slide 60: Snow Lake Reserves & Resources Cont.

    SNOW LAKE RESERVES & RESOURCES CONT. (AS AT JANUARY 1, 2021) PROPERTY CATEGORY TONNES Cu (%) Zn (%) Au (g/t) Ag (g/t) PEN II Indicated 470,000 0.49 8.89 0.3 7 Talbot1 Indicated 2,190,000 2.33 1.79 2.1 36 TOTAL INDICATED (BASE METALS) 2,660,000 2.01 3.04 1.8 31 Watts River Inferred 3,150,000 2.34 2.5

  61. Slide 61: Flin Flon Reserves & Resources

    FLIN FLON RESERVES & RESOURCES (AS AT JANUARY 1, 2021) PROPERTY CATEGORY TONNES Cu (%) Zn (%) Au (g/t) Ag (g/t) Proven 1,125,000 1.59 5.09 2.23 31 777 Reserves Probable 399,000 1.11 4.46 1.86 30 TOTAL 777 PROVEN AND PROBABLE 1,524,000 1.46 4.93 2.13 31 Measured 120,000 1.21 7.12 2.31 39 777 Resource

  62. Slide 62: Rosemont and Mason Reserves & Resources

    ROSEMONT AND MASON RESERVES & RESOURCES (AS AT JANUARY 1, 2021) PROPERTY CATEGORY TONNES Cu (%) Mo (%) Ag (g/t) Proven 426,100,000 0.48 0.012 4.96 Rosemont Reserves Probable 111,000,000 0.31 0.010 3.09 TOTAL ROSEMONT PROVEN AND PROBABLE 537,100,000 0.45 0.012 4.58 Measured 161,300,000 0.38 0.009 2.7

  63. Slide 63: Additional Reserves & Resources Information

    ADDITIONAL RESERVES & RESOURCES INFORMATION The reserve and resource estimates included in this presentation were prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum Standar

  64. Slide 64: For more information contact

    For more information contact: Candace Brûlé Vice President, Investor Relations 416.814.4387 | candace.brule@hudbay.com

Hudbay Minerals — BofA Leveraged Finance Conference 2021 on 6ix