Anson Resources Limited · ASX:ASN

Anson Resources — IMARC 2026

11 slides from Anson Resources's conference presentation, Oct 28, 2026

  1. Slide 1: Green River Lithium Project - IMARC 2026

    Anson Resources | A1 Lithium rsonal use only Green River Lithium Project Bruce Richardson, CEO Green River, Utah, USA Anson Resources IMARC 2026 A1 Lithium’s flagship project, The Green River Lithium Project is in the Paradox Basin, Utah, USA. The Paradox Basin is potentially the largest and most co

  2. Slide 2: Disclaimer and Important Notice

    Disclaimer and Important Notice The information contained in this confidential document ("Presentation") has been prepared by Anson Resources Competent Person’s Statement Limited (the "Company"). It has not been fully verified and is subject to material updating, revision and further amendment. The

  3. Slide 3: Market and Strategy

    Market and Strategy To develop the low-cost Green River Lithium Project into a US Lithium-ion Battery Demand Outlook multi-phase operation capable of supplying approximately rsonal use only 10% of North America's lithium demand, strengthening North America's domestic supply chain and creating long-

  4. Slide 4: Investment Overview | Lowest-Cost US Lithium Supply

    A1 Lithium Green River Lithium Project Investment Overview | Lowest-Cost US Lithium Supply rsonal use only • Advanced Development Stage o De-risked, fully permitted lithium carbonate production project in Utah. o Near-term demonstration plant, leading to phase-1; 10,000tpa commercial facility * • Lo

  5. Slide 5: Low Capex | Private Land & Existing Infrastructure

    A1 Lithium Green River Lithium Project Low Capex | Private Land & Existing Infrastructure rsonal use only 5

  6. Slide 6: Recent Milestones Accomplished

    Recent Milestones Accomplished Utah State $406 M incentive increases Post Tax NPV to US$1,050 M 1 • DFS – Lead Engineer Sedgman, JordProxa, Baker Hughes 2 • POSCO Funding Accelerates Green River – Anson has received • Baker Hughes completed preliminary well field design end Sept rsonal use only the

  7. Slide 7: Lithium Project Development Timeline

    Green River Lithium Project Development Timeline Near Term Targeted Project Milestones rsonal use only Q3 2026 Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027 Permitting Permitting Completed Demonstration Plant Resource Additional JORC Resource Engineering Phase 1 DFS Phase 1 FEED Construction Commences Fin

  8. Slide 8: Engineering Study - Lowest Cost US Project

    Green River Lithium Project Engineering Study1 – Lowest Cost US Project rsonal use only Key Project Metrics % Production Total Revenue NPV pre-tax IRR 10,000 tpa $5.2B $1.4B 27% C1 OPEX/t LCE CAPEX Annual EBITDA Project Life $3,837 $569M $216M 20 years The information is extracted from the report en

  9. Slide 9: Resource Update - Resource Expansion

    Green River Resource Update Resource Expansion • JORC Resource estimate increased by 650% 1 Indicated Resource – 183,000 t lithium carbonate, an 863% increase rsonal use only o o Inferred Resource – 590,000 t lithium carbonate, a 602% increase • FFSL: Anson has won the bid to acquire the mineral rig

  10. Slide 10: Resource Update - Exploration Target Determination

    Green River Resource Update Exploration Target Determination rsonal use only Tonnage Ranges • Based on calculated brine volume 1 • Area, formation thickness (700 ft), specific yield (6%), brine density (1.13g/cm3) Grade Ranges • Determined from assay results from the Bosydaba and Mt Fuel-Skyline Gey

  11. Slide 11: Potential Capital Stack

    Potential Capital Stack Project Funding rsonal use only Focus on Non-Dilutive Funds • POSCO lease fee • UILPA Bond • Offtake partner investment • US Government Grants • Export Credit Agency Funding 11