Abacus Mining & Exploration Corp. · TSXV:AME

Abacus Mining & Exploration — Investor Presentation (June 2011)

28 slides from Abacus Mining & Exploration's investor presentation, June 2011

  1. Slide 1: Uniquely positioned for growth

    Slide 1: Uniquely positioned for growth

    Uniquely positioned for growth Investor Presentation May‐June 2011 Abacus Mining and Exploration Corporation | TSXV:AME | www.amemining.com 1

  2. Slide 2: Forward Looking Information

    Slide 2: Forward Looking Information

    Forward Looking Information This presentation includes certain statements that may be deemed "forward lookingg statements". All statements herein,, other than statements of historical facts, that address events or developments that Abacus Mining and Exploration Corporation (the "Company") expects to

  3. Slide 3: The Vision

    Slide 3: The Vision

    The Vision To build a copper-gold business focused on western C Canada, d producing d i copper metalt l by b 2015 with ith additional dditi l projects in the development phase Growing future value and cashflow through solid sustainable principles and community involvement Abacus Mining and Explorati

  4. Slide 4: Why invest in AME today?

    Slide 4: Why invest in AME today?

    Why invest in AME today? 1. Late feasibility stage Cu-Au Ajax Project near Kamloops, B.C. • Robust economics: NPV to AME est $290M* vs market cap of $40M • Project annual production of 110Mlbs Cu; 100Koz Au (AME has 20%) • Low risk, financed carry, excellent infrastructure 2. Major global copper par

  5. Slide 5: Abacus – Capital Structure

    Slide 5: Abacus – Capital Structure

    Abacus – Capital Structure AME.V Capital Structure (C$) TSXV Symbol AME Share Price (May 26, 2011) $0.19 Share Price (52 week range) $0.35 – 0.14 Issued and Outstanding 197 million Warrants ($0.30) 21 million Options 12 million F ll Diluted Fully Dil t d 230 million illi Market Capitalization $40 mi

  6. Slide 6: 4 step program to Value Creation

    Slide 6: 4 step program to Value Creation

    4 step program to Value Creation 1. Ajax Cu-Au Project Bring g Ajax j project j through g BFS ((autumn 2011)) into production (y (y/e 2014)) 2. Ajax Camp Exploration Enter into a comprehensive exploration program over other surface mineable i bl resources iin th the Aj Ajax camp via i th the JV A Ag

  7. Slide 7: 1. Ajax Project

    Slide 7: 1. Ajax Project

    1. Ajax Project Conventional open open‐pit pit copper copper‐gold gold operation World class copper mining district and former Teck mine British C l bi Columbia Excellent Infrastructure • 10 kms SW of Kamloops • Central transport hub (CN and CP) • Access to skilled work force • Low cost grid power,

  8. Slide 8: Historical Snapshot

    Slide 8: Historical Snapshot

    Historical Snapshot ƒ Ajax East and West open-pits saw intermittent production from 1989 to 1997 by Teck Cominco (14M tonnes grading 0.46% Cu, 0.34 g/t Au) ƒ In 2002 AME signed option agreements with Teck and Discovery Enterprises to earn a 100% interest, subject to a Teck back-in right ƒ In 2005 AM

  9. Slide 9: About Our Partner KGHM

    Slide 9: About Our Partner KGHM

    About Our Partner KGHM ƒ 9TH largest producer of Copper in the world A UNIQUE PARTNERSHIP – Annual Cu production of over ‐ Abacus has a top team of 500,000 tonnes (~3% of world) professionals with proven mine – 2nd largest Ag producer, 1,100 tonnes p.a. p a (~7% of world) buildingg expertise p – Mar

  10. Slide 10: Abacus Operating Team

    Slide 10: Abacus Operating Team

    Abacus Operating Team • Andrew Pooler – EVP & COO Mining Engineer with over 25 years experience in mining operations and development including six years with Pan American Silver as Sr. VP Mine Operations prior to joining Abacus. He has held executive p positions with such miningg companies p as Amax

  11. Slide 11: Feasibility Study Consultants

    Slide 11: Feasibility Study Consultants

    Feasibility Study Consultants • Wardrop p - Primary y QP, Concentrator and Infrastructure • AMEC - QP for Mining and In Pit Crushing and Conveying • Knight Piesold – QP for Environmental and Lead Consultant for Permitting • BGC – Geotechnical G t h i l ffor Pit Walls, W ll PlPlant, t and dWWaste t D

  12. Slide 12: PEA Resource

    Slide 12: PEA Resource

    PEA Resource Category Tonnes(Mt) Cu (%) Au (g/t) Cu (M lb) Au(K oz) Measured 231 0.29 0.18 1,454.8 1,300 I di t d Indicated 193 0.27 0 27 0 0.18 18 1 1,153.6 153 6 1 1,100 100 Inferred 78 0.21 0.15 357.5 400 Total 502 0.27 0.17 2,965.9 2,800 Abacus Mining and Exploration Corporation | TSXV:AME | www

  13. Slide 13: PEA Results July 31, 2009

    Slide 13: PEA Results July 31, 2009

    PEA Results July 31, 2009 Prepared by Wardrop Engineering Inc., AMEC Americas Limited, K i ht Piésold Knight Pié ld Ltd., Ltd andd BGC E Engineering i i IInc. Total tonnes mined (000’s tonnes) 1,345,000 Ore tonnes (000’s tonnes) 502,000 Waste tonnes (000’s tonnes) 842,000 Strip ratio 1.67:1 Mine lif

  14. Slide 14: Ajax Economics – PEA 2009

    Slide 14: Ajax Economics – PEA 2009

    Ajax Economics – PEA 2009 Annual production of 110 million lbs of copper a coppe andd 100,000 00,000 o ozssoof go gold daat 60,000 tpd over a 23 year mine life NPV per PEA (base case) NPV per PEA (3-yr avg prices) US$2 $ Cu and US$700 $ Au US$2.99 Cu and US$900 Au US$192.7M pre‐tax on capex of $535M

  15. Slide 15: Increasing Project Value

    Slide 15: Increasing Project Value

    Increasing Project Value PEA F Feasibility ibilit Inferred resource of 80.6mt @ Drill plan to convert inferred 0 22 % Cu and 0 0.22 0.16 16 g/t Au resource to M&I p production Drilling - 30,000 m of exploration geotechnical, and test blasting Conventional tailings dam storage High density tailing de

  16. Slide 16: Project General Layout

    Slide 16: Project General Layout

    Project General Layout * *Project description for environmental assessment Abacus Mining and Exploration Corporation | TSXV:AME | www.amemining.com 16

  17. Slide 17: Ajax Project Schedule

    Slide 17: Ajax Project Schedule

    Ajax Project Schedule 2008 2009 2010 2011 2012 2013 2014 2015 Combined Ajax Resource Preliminary Economic A Assessmentt Feasibility Permitting Mine Construction Metal Production Abacus Mining and Exploration Corporation | TSXV:AME | www.amemining.com 17

  18. Slide 18: Milestones in last 12 months

    Slide 18: Milestones in last 12 months

    Milestones in last 12 months 2010 May: Investment Agreement with KGHM signed Jun: AME shareholders approve deal Feasibility y Study y on Ajax j Project j commences Aug: Infill drilling program at Ajax underway Oct: Definitive Joint Venture Agreement with KGHM signed Dec: Advanced Exploration Agreeme

  19. Slide 19: Milestones in last 12 months

    Slide 19: Milestones in last 12 months

    Milestones in last 12 months 2011 Jan : Ajax infill and delineation drilling program completed, results announced Feb: Project Description accepted Mar: Public Consultation underway Apr: Teck Asset Purchase Agreement concluded (includes removal of Teck back-in right) Abacus Mining and Exploration Co

  20. Slide 20: Fast Track to Development

    Slide 20: Fast Track to Development

    Fast Track to Development • Target date for completion of BFS autumn 2011 - includes new resource estimate following 27,000 metre drill program • Permitting ongoing, expected completion in 2012 • KGHM decision d i i tto proceed d with ith mine i d development l t and d construction t ti required 90

  21. Slide 21: 2. Ajax Exploration Targets

    Slide 21: 2. Ajax Exploration Targets

    2. Ajax Exploration Targets ƒ JV has a large underexplored Railway DM l db land base – 8,000 8 000 h hectares t ƒ Currently collecting all existing Rainbow data into new area geology model ƒ Structural trends unfolding Haul Road AJAX PITS ƒ KGHM and AME support a major multi-year exploration program

  22. Slide 22: 3. JV Acquisition Opportunities – Development Stage

    Slide 22: 3. JV Acquisition Opportunities – Development Stage

    3. JV Acquisition Opportunities A. Development Stage ƒ Evaluating acquisition targets in North America based on success criteria: - 50Kt of Cu metal p.a. in concentrate or cathode - 10+ year mine i life lif - $1/lb operating cost - At or near PEA stage ƒ Program has commenced to narrow opportunities

  23. Slide 23: 3. JV Acquisition Opportunities – Advanced Exploration

    Slide 23: 3. JV Acquisition Opportunities – Advanced Exploration

    3. JV Acquisition Opportunities B. Advanced Exploration ƒ Evaluating advanced exploration projects for future development pipeline ƒ Exploration p expenditures p p proportionate p to ownership p (KGHM/AME) ƒ Focus on BC/Yukon and Western USA ƒ Lever exploration opportunities from the KGHM Ajax brand

  24. Slide 24: 4. Abacus Exploration Projects

    Slide 24: 4. Abacus Exploration Projects

    4. Abacus Exploration Projects Grassroots exploration ƒ Seeking greenfield exploration projects for future development ƒ 100% Abacus ownership or option to obtain ƒ Develop pipeline of future projects for potential development ƒ Focus initially on BC and Western USA ƒ Lever opportunities from the AM

  25. Slide 25: Low Risk, High Reward Investment

    Slide 25: Low Risk, High Reward Investment

    Low Risk, High Reward Investment 1. Late feasibility stage Cu-Au Ajax Project near Kamloops, B.C. • Robust economics: NPV to AME est $290M* vs market cap of $40M • Project annual production of 110Mlbs Cu; 100Koz Au (AME has 20%) • Low risk, financed carry, excellent infrastructure 2. Major global co

  26. Slide 26: Highly Experienced Management Team

    Slide 26: Highly Experienced Management Team

    Highly Experienced Management Team • Jim Excell – President & CEO For over 30 years with BHP Billiton in Canada and internationally, serving as President d and d COO off BHP Billiton ll Diamonds d Inc. from f 1999 to 2003, and as its Chairman to June 2005. A metallurgical engineer, he oversaw the de

  27. Slide 27: Board of Directors

    Slide 27: Board of Directors

    Board of Directors • Tom McKeever – Exec Chairman Over 40 years experience in senior management in the mining and metal trading industry for companies such as AMAX Inc., MG plc. He was Chairman of Sempra Metals Group until his retirement in 2006. • James D. Excell (see previous) • Michael D. McInnis

  28. Slide 28: TSXV:AME

    Slide 28: TSXV:AME

    Donna Yoshimatsu TSXV:AME Director of Investor Relations dyoshimatsu@amemining.com 647‐345‐0826 Abacus Mining and Exploration Corporation | TSXV:AME | www.amemining.com 28

Source: Internet Archive copy of amemining.com

More decks from Abacus Mining & Exploration Corp.

All 5 Abacus Mining & Exploration decks