Slide 1: Open House: Introduction to the Updated Site Management Plan (2014)
Due to changes to the Competition Act, pending regulatory guidance, this document is provided for historical En raison des changements apportés à la Loi sur la concurrence, en attendant l'orientation réglementaire, ce document information purposes only and does not constitute an active or current re
Slide 2: Presentation Overview
Presentation Overview • Introductions and General Information • Statement from Sears Canada • Site History Summary • Introduction to the Updated SMP (2014) • Closing Remarks • Breakout to Stakeholder Tables for Questions
Slide 3: Introductions and General Information
Introductions and General Information • Sears Canada, Clifton and Intrinsik • Stakeholders: Sears Gas Plume Committee (representing the residents of the Hounsfield Heights – Briar Hill (HH-BH) Community), Alberta Environment and Sustainable Resource Development (AESRD), Alberta Health Services (AHS)
Slide 4: Statement from Sears Canada
Statement from Sears Canada Sears Canada has been a member of the North Hill Community for nearly 60 years. Our Vision is to create lifelong relationships built on trust. A key value we live by is our responsibility to care for the people in our communities and the world around us. Sears has been co
Slide 5: Site History
Site History • Discovery • Source Removal • Source Remediation Excavation • Liquid Petroleum Hydrocarbons • Dual Phase Vapour Extraction Former Sears Service Centre
Slide 6: Site History: Discovery
Site History • Discovery • Originally developed 1958 • Sears Service Centre from 1958 – 1984 • Operated as Sunoco from 1984 – 1995 • Site decommissioned as a fuel retailer in 1995 • Environmental Site Assessments beginning in 1995 North Hill Mall - City of Calgary Archives
Slide 7: Site History: Source Removal
Site History • Source Removal • Original USTs replaced 1984 (source of release) • Second generation USTs removed 1995 (fiberglass, not damaged) Example of an Underground Storage Tank Removal.
Slide 8: Site History: Source Remediation Excavation
Site History • Source Remediation Excavation • Completed in 2006 through 2008 • 69,000 m3 of contaminated soil removed Secondary source removal to the east of Kal Tire
Slide 9: Site History: Liquid Petroleum Hydrocarbons
Site History • Liquid Petroleum Hydrocarbons • Identification of LPH in monitoring wells within the Hounsfield Heights area • Removed initially by bailing LPH in monitoring well bailer.
Slide 10: Site History: Dual Phase Vapour Extraction
Site History • Dual Phase Vapour Extraction • Removes LPH from the top of the groundwater • Removed dissolved hydrocarbons from within the groundwater DPVE treatment system in Lions Park.
Slide 11: Introduction to the Updated SMP
Introduction to the Updated SMP (2014) • Reasons for the Updated SMP (2014) • Highlights of the new SMP • Schedules • Work plan moving forward Calgary as viewed from the Bow River near Beaver Dam Flats.
Slide 12: Reasons for the Updated SMP (2014)
Introduction to the Updated SMP (2014) • Reasons for the Updated SMP (2014) • AESRD correspondence of 20 July 2012 • Changes in regulatory guidelines between 2007 and 2010 • Continue to ensure that there are not any risks to human health and the environment. Aerial Photograph of the Site area
Slide 13: Highlights of the new SMP
Introduction to the Updated SMP (2014) • Highlights of the new SMP • Conceptual Site Model Preparation • Public Meeting • Monitoring Well Abandonment • Soil Boring and Monitoring Well Installation • Groundwater Sampling • Hydrogeologic and Plume Modeling • Revised Risk Assessment Conceptual Site Mod
Slide 14: Schedules
Introduction to the Updated SMP (2014) • Schedules • Conceptual Site Model Preparation (Completed) • Public Meeting (27 May 2014) • Monitoring Well Abandonment (June and July 2014) • Soil Boring and Monitoring Well Installation (August – November 2014) Monitoring well abandonment 2008.
Slide 15: Schedules
Introduction to the Updated SMP (2014) • Schedules • Groundwater Sampling (November – December 2014) • Hydrogeologic and Plume Modeling (Spring 2015) • Revised Risk Assessment (Spring 2015) • DPVE System Operation (Continuously) Monitoring wells to be abandoned and new monitoring well locations.
Slide 16: Work plan moving forward
Introduction to the Updated SMP (2014) • Work plan moving forward • Continual groundwater monitoring and sampling • Contamination plume modelling • Revision of the CSM • Continued operation of DPVE • Evaluation of other remedial approaches Benzene Plume Map from the October 2012 Groundwater Sampling
Slide 17: Closing Remarks
Closing Remarks • Thank-you for your time! • Please visit us at our stations • Please provide us with your completed questionnaire and ask us any additional questions you may have! Lions Park - City of Calgary Archives