Slide 1: Corporate Presentation April 2015
Corporate Presentation April 2015 Acquisiton & development of gold assets on the Cadillac fault, in the Val-d’Or area Monarquesgold.com | 1.888.994.4465 1
Slide 2: Cautionary Statement on Forward Looking Information
Cautionary Statement on Forward Looking Information Certain information included in this presentation, including any information as to our future exploration, financial or operating performance and other statements that express management's expectations or estimates of future performance, constitute
Slide 3: Monarques in few words
Monarques in few words…. Our Vision To become the next Gold producer in Val-d’Or, Québec Our Mission To discover, develop and extract Québec’s mineral resources profitably safely and efficently Our Values Our People, Our Community, Our Environment, Our Company 3
Slide 4: Mining District
Mining District • Infrastructures • Social Acceptability: ( Val-d’Or ) • Cadillac break produced over 175M Oz Au in the past century 4
Slide 5: Monarques at a glance
Monarques at a glance Gold exploration play in Québec 199 km² of Gold properties on the 581 claims, 2 mining concessions, 1 mining lease Cadillac Break, Val-d’Or area and more than $ 9.4 M in work credits. *As of November 15th 2014 5
Slide 6: 13 acquisitions – Consolidated in 4 properties
13 acquisitions – Consolidated in 4 properties Properties Claims Area MRN Credits NSR Properties before km2 ($) (%) consolidation Croinor Gold Croinor, Croinor-Pershing, Lac 1 mining lease 293 126 7,414,858 1,5% * Tavernier, Bel-Rive Simkar Gold 2 mining concessions 21 5 586,447 $ 1,5% Simkar, Tex-S
Slide 7: Cadillac Break, Val-d'Or, Québec
Cadillac Break, Val-d’Or, Québec 7
Slide 8: 4 mills in the area
4 mills in the area pres Table 17.1 — Potential plants for custom milling Mill Company Process Capacity | Distance Aurbel Gold Mill Alexis Minerals flotation & leaching 1,200 tod | 69 km | Siama-Lamaque Complex | Century Mining __|_aravity concentration & leaching | 2.500 tpd | 73 km__| Camfio Mill
Slide 9: Rail Road possibility
Rail Road possibility Transport minerai de Senneterre - Moulin Camflo = ae J ® he Se Voie ferrée - 85.5km —— Route - 98.0km AURIFERE k WoAhOU ES ; . GOLD
Slide 10: Croinor Gold – Prefeasibility study highlights
Croinor Gold – Prefeasibility study highlights Parameters Results Proven & Probable mineral reserves 541 534 @ 6.77 g/t Total Contained gold Reserve 117 862 oz Mine life 5 years Daily mine Production (t/day) 425 - 675 Gold Recovery 97.50% Capital Cost $27.3 M Sustaining Capital/ working capital $15
Slide 11: Croinor Gold – Mineral Resource Estimate
Croinor Gold – Mineral Resource Estimate Mineral Resources Estimate Measured Indicated Measured + Indicated Inferred Cut-off (g/t) Tonnes Au g/t Oz Au Tonnes Au g/t Oz Au Tonnes Au g/t Oz Au Tonnes Au g/t Oz Au › 6 g/t 46 800 10.98 16 500 355 800 12.13 138 800 402 600 12,00 155 300 84 500 12.02 32 7
Slide 12: Croinor Gold – Potential to increase the resource
Croinor Gold – Potential to increase the resource Source : Prefeasibility Study | Delivered by Monarques Resources effective as of October 7th 2014, and issued on October 30th 2014 12
Slide 13: Croinor Gold - Proposed site Infrastructure
Croinor Gold - Proposed site Infrastructure 13
Slide 14: Current drill campaign at Croinor Gold
Current drill campaign at Croinor Gold 14
Slide 15: Section 690W (regard N292°)
Section 690W (regard N292°) 15
Slide 16: Health & Safety
Health & Safety • Actual processing method 16
Slide 17: New Technology – Minrail.ca
New Technology – Minrail.ca Productivity Profitability Health & Safety Environmental Impact Multifunctional Technology • Long Tom Drilling • Blasting • Slusher • Mucking Readers should note that as at the date of this presentation, assessment of the factory-tested S.A.M.S.™ technology was considered
Slide 18: Simkar Gold project
Simkar Gold project • Produced 50,000 oz Au • 100 % own by MQR • NI 43-101 resources calculation (oct 2013) Measured Indicated Measured + Indicated Inferred Cut off: grams Tonnes Grade Tonnes Grade Tonnes Grade Tonnes Grade Ounces Ounces Ounces Ounces per tonne (gpt) (x1000) (gpt) (x1000) (gpt) (x10
Slide 19: Simkar Gold Project
Simkar Gold Project Potential to increase the actual resource 19
Slide 20: Other Assets
Other Assets Regcourt Gold - Belcourt Gold • 100% owned by MQR • 275 Claims on 60km2 • Over $1 M in Credits from MNR Next…… • Developping a new exploration strategy. • Open for option agreement 20
Slide 21: What's next
What’s next…. • Croinor Gold • Fieldwork to identify new zones and increase actual resources • Work with local community • Simkar Gold • Fieldwork - Geophysics to identify new drill targets • Follow up with drill campaign The corporation is also looking for new opportunities to develop and increase
Slide 22: Management & Directors
Management & Directors Management Jean-Marc Lacoste President & CEO Vincent Janelle VP Investor Relations Steve Nadeau Chief Financial Officer Valère Larouche* Chief Geologist Antoine Fournier Geologist Gilles Provost Geologist Directors **Michel Baril Chairman Jean-Marc Lacoste Director Christian P
Slide 23: Capital Structure
Capital Structure • Working Capital: ≈ $2,2 M • 52 week trading price: $0.09 – $0.14 • Shares oustanding: 80 M • Options (avg. $0.25): 3.7 M • Warrants(avg. $0.21): 26.7 M • Distribution of outstanding shares 23
Slide 24: Corporative contact
Corporative contact Jean-Marc Lacoste Monarques Resources Inc. President & Chief Executive Officer jm.lacoste@monarquesgold.com 1-888-99-44-GOLD (4653) 24