Cerro De Pasco Resources, Inc. · TSXV:CDPR

Cerro De Pasco Resources — Investor Presentation (May 2023)

35 slides from Cerro De Pasco Resources's investor presentation, May 2023

  1. Slide 1: CDPR Corporate Presentation | May 2023

    CDPR CORPORATE PRESENTATION | MAY 2023 CSE: CDPR

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation, prepared by Cerro de Pasco Resources Inc. (herein referred to as the “Company” or “CDPR”), is solely for informational purposes. Disclosure of this presentation, its contents, extracts or abstracts to third parties is not authorized without express and prior written con

  3. Slide 3: Forward Looking Statements

    FOWARD LOOKING STATEMENTS Certain statements contained in this presentation constitute “forward-looking information” or “forward-looking statements” under Canadian securities legislation. Generally, forward-looking information can be identified using forward-looking terminology such as “plans”, “see

  4. Slide 4: Company Goals

    Company Goals OVERVIEW Cerro de Pasco Resources Inc. (CDPR) is a mining and resource management company, with the goal to become the next mid-tier producer of base metals in Peru. CDPR is currently engaged in mining, developing and exploring our wholly-owned 6,000 hectare Santander Mine in the highl

  5. Slide 5: Assets Overview

    ASSETS OVERVIEW EL METALURGISTA • 100% Ownership El Metalurgista (95.74 ha). • Project for re-processing Tailing (Quiulacocha) and Stockpiled material(Excelsior) Zn and Pb concentrate +. • Quiulacocha TSF estimated 70MT 1.44 %Zn , 0.79 % Pb & 36 gpt Ag. • Excelsior Stockpile estimated 35MT 1.5% Zn,

  6. Slide 6: Proven Path for Growth

    PROVEN PATH FOR GROWTH ✓ Stabilize Mining Operations ✓ Meet Production Goals & Establish track-record ✓ Develop low-complexity Brownfield mining projects ✓ Advance large-scale Tailings-reprocessing Project ✓ Exploration of greenfield targets ✓ Pursue Quality M&A ➢ Generate substantial investor retur

  7. Slide 7: Building a Track Record – May 2023 Update

    BUILDING A TRACK RECORD – May 2023 Update ON TRACK WITH GUIDANCE ACHIEVED GUIDANCE & STABILIZED OPERATIONS EXECUTED 23.9K METERS DRILLED OF EXPLORATION DEMOSTRATED VIABILITY PIPE PROJECT - PEA 7

  8. Slide 8: Investing in the Future – May 2023 Update

    INVESTING IN THE FUTURE – May 2023 Update • PRODUCTION GUIDANCE AISC costs reflect the sustaining capex required at Santander, such as tailings expansion, pumping & power infrastructure, and catching up on development; in preparation for Pipe production. • DEVELOP CONNECTING TUNEL MAGISTRAL-PIPE AND

  9. Slide 9: Investing in the Future – May 2023 Update

    INVESTING IN THE FUTURE – May 2023 Update CAPEX US$ 2023 2024 2025 Ma gi s tra l es Devel opment 4,954,920 4,039,834 Pi pe Devel opment 0 5,884,184 7,968,024 Pi pe Ra mp (Portal ) 765,000 2,730,000 459,783 Tunnel Ma gi s tra l Pi pe (BP3680) 1,920,000 960,000 - Ra i s bore Ventil a tion 140,625 140,

  10. Slide 10: Santander Mine

    SANTANDER MINE v Brownfield Project: The Santander Pipe vy Potential 10+ Years Life ¥ 400k+dmt Zn Con next 5-years vy $0.96 — $1.00 alsc,., CERRO DE PASCO RESOURCES. THE SANTANDER PIPE PROJECT

  11. Slide 11: Santander Mining Unit – Unlocking Value

    SANTANDER MINING UNIT – UNLOCKING VALUE PUAJANCA *BROWNFIELD PROJECT* • 2023 Exploration Campaign 5km NATY Greenfield Project • INDEPENDENT MRE: Indicated 0.25 Mt at 2.23% Zn 39 • 2023 Exploration Campaign 5km g/t Ag and an Inferred 0.21 Mt at 1.99% Zn 30 g/t Ag • Skarn system. Relation to: Puajanca

  12. Slide 12: Santander Mining Unit – Resources and Potential

    SANTANDER MINING UNIT – RESOURCES AND POTENTIAL INDEPENDENTELY VALIDATED MRE INDEPENDENTELY VALIDATED MRE MAGISTRAL: MAIN PIPE: INDEPENDENT MRE INDEPENDENT MRE as of November 2022 as of June 2022 UPPER ZONE - POTENTIAL 3 - 4 M Tonnes 5.0 - 6.0% Zn PIPE NORTH EXTENSION - POTENTIAL 0.8 – 1.3 M Tonnes

  13. Slide 13: Santander Mining Unit – Resources and Potential

    SANTANDER MINING UNIT – RESOURCES AND POTENTIAL RECOGNIZED TARGET AND INDEPENDENTELY VALIDATED MRE Average Value PUAJANCA: Category Mass Zn Pb Ag Cu NSR NATY: Naty is a hidden target located 1.8 km to N- kt % % g/t % USD $ MRE by SRK NE of Los Toros target, north of the MRE by SRK Indicated 250 2.23

  14. Slide 14: Santander – Independent Validation (NI 43-101 PEA DRA)

    SANTANDER – INDEPENDENT VALIDATION (NI 43-101 PEA DRA) ✓ FOCUSED JUST ON MAIN SANTANDER PIPE ✓ ECONOMIC VALIDATION OF THE PIPE PROJECT ✓ SIGNIFICANT POTENTIAL RESOURCES • UPPER-ZONE, ESTIMATED TO CONTAIN SOME 3 TO 4 MILLION TONNES AVERAGING 4 TO 6% ZN, MINED OUT • THE NEWLY DISCOVERED PIPE NORTH ZON

  15. Slide 15: Santander – Detail Consolidated Plan

    SANTANDER – DETAIL CONSOLIDATED PLAN CAPEX REDUCED BY OPENING UP A NEW PORTAL WITH RAMP ACCESS FROM THE OLD OPEN PIT THROUGH OLD UNDERGROUND MINING AREA OVER THE SHAFT-WINCH COST 15

  16. Slide 16: Santander – Consolidated Production Schedule

    SANTANDER – CONSOLIDATED PRODUCTION SCHEDULE 2023 BUDGET & LOM PLAN PRODUCTION KPI's 2023 5Y LOM Ore Mined 831,886 6,255,332 14,245,913 Ore Milled 831,886 6,255,332 14,245,913 Zn Head Grade % 3.2% 4.3% 4.3% Pb Head Grade % 0.2% 0.1% 0.1% Ag Head Grade Toz/t 0.3 0.5 0.4 Zn Recovery % 92.4% 94.4% 94.1

  17. Slide 17: Santander – 2023/2024 Plan Optimization

    SANTANDER – 2023/2024 PLAN OPTIMIZATION 17

  18. Slide 18: Santander – Consolidated Plan - Economics

    SANTANDER – CONSOLIDATED PLAN - ECONOMICS PROJECT ECONOMICS METAL PRICES 2023 5Y LOM Zinc $/lb 1.40 1.34 1.27 Lead $/lb 1.01 0.90 0.86 Silver $/oz 23.26 22.35 21.00 Copper $/lb 3.59 3.82 3.65 KPIs 2023 5Y LOM Operating cost per tonne milled 56.7 42.5 40.8 C1 Cash Cost per pound* 1.49 0.93 0.91 All-i

  19. Slide 19: Santander – Potential Strong Cash Generator

    SANTANDER – POTENTIAL STRONG CASH GENERATOR PROJECT HIGHLIGHTS (000)s Units Total ✓ MAGISTRAL PRODUCTION IN 2023-2025 (1) Project Life (2) years 13 ✓ THE SANTANDER PIPE PROJECT IN 2025-2030 Production ZnEq lbs 1,393,552 Production Zn lbs 1,277,289 ✓ PLANT THROUGHPUT: 2,500 TPD IN 2023 Production Pb

  20. Slide 20: Santander – Strategic Growth Plan

    SANTANDER – STRATEGIC GROWTH PLAN PHASE-2 – CONSOLIDATED MODEL BENCHMARKING: ATTRACTIVE VALUE PROPOSITION ✓ PHASE-1: completed 2022 ❖ PHASE-2: Budget Model developed. Close on financing, currently ON-TRACK • PHASE-3: Develop Puajanca Ore deposit. +25% throughput increase. Exporation Portal 2nd half

  21. Slide 21: El Metallurgista

    CERRO DE PASCO RESOURCES bee El Metalurgista mining concession ior deposit EL METALLURGISTA ONE OF THE LARGEST ABOVE THE GROUND MINERALIZED RESOURCES IN THE WORLD Non-Dilutive funding in place for drilling, sampling and metallurgical studies.

  22. Slide 22: El Metallurgista – Quiulacocha & Excelsior

    EL METALLURGISTA – QUIULACOCHA & EXCELSIOR EXCELSIOR MINERAL PILE DIA* has been approved ORE TYPE Sulphide Estimated at 104 Mt Received drilling permit 30.1 Mt Resource Supported from MINEM by NI 43-101 MRE Finalizing agreement for Quiulacocha Tailings surface access, June 2023 expectation. USD $2M

  23. Slide 23: El Metallurgista – Quiulacocha

    EL METALLURGISTA – QUIULACOCHA • 100% interest in the El Metalurgista mining concession (95.74 ha) incorporating mineral rights covering 57 ha of the Quiulacocha Tailings Storage Facility. • Located approximately 175 km NNE of the city of Lima in the Region of Pasco, Peru. • Roads accessible, power

  24. Slide 24: El Metallurgista – Potential Economics

    EL METALLURGISTA – POTENTIAL ECONOMICS Metal Grade Price Value /tonne Zinc 2% $3000 $60 Lead 1% $1800 $18 $118/tonne in-situ Silver 2oz $20 $40 In-Situ Value / tonne 100% $118 Avg. Metal Recovery = 50% (x) 50% $59 Concentrate Selling Fees (TC/RC) (x) 70% $41.3 Deduct 30% from value after metal recov

  25. Slide 25: El Metallurgista – Excelsior

    EL METALLURGISTA – EXCELSIOR • 100% interest in the El Metalurgista mining concession (95.74 ha) incorporating mineral rights covering approximately 35 ha of the Excelsior Stockpile. • Located approximately 175 km NNE of the city of Lima in the Region of Pasco, Peru. • Roads accessible, power grid,

  26. Slide 26: German Aerospace Center (DLR)

    Deustche Zentrum für Luft- und Raumfahrt German Aerospace Center

  27. Slide 27: H2Sphere – The Problem: Pyrite

    H2SPHERE THE PROBLEM: Pyrite FeS2 UNCONTROLLED PYRITE OXIDATION FeS2 + 15/4O2 + 7/2H2O --> Fe(OH)3 + 2SO42- + 4H+ => Acid Mine Drainage = No.1 Environmental problem of metal mining 2FeS2 + 15/2O2 + 4H2O--> Fe2O3 + 4H2SO4 27

  28. Slide 28: H2Sphere

    H2SPHERE olar Hybride yrite- ydrog n actor: Electrolysis H2SO4 = 0.17 V cell potential Green Hydrogen from Pyrite and simultaneous Electrolysis H2O = 1.23 V cell potential elimination of Acid Mine Drainage (AMD) Energy Requirement of Electrolysis H2SO4 /H2O = 14% SO2 and Electrolysis of H2SO4 to pro

  29. Slide 29: Sustainable Mining – Resource Cycling Cerro de Pasco

    SUSTAINABLE MINING – Carbonate, Lime RESOURCE CYCLING CERRO DE PASCO Pb, Zn, Cu concentrates Deustche Zentrum für Luft- und Raumfahrt German Aerospace Center Pyrite Concentrate: H2 H2SO4 Fe-oxide Pellets Au, Ag, Bi recovery As203 confinement Quartz Concentrate: - Glass industry - Solar panel industr

  30. Slide 30: CDPR – 2023 Catalyst

    CDPR – 2023 CATALYST PEA Study on Santander Pipe > February 2023 Construction Santander Pipe > 2023/2024 Puajanca Drilling Results > April 2023 PEA Study Puajanca > Q4 2023 QT Easement / Commencement of drilling program > Q2 2023 Project Santander Naty – Project Santander Pipe – Production 2028 Prod

  31. Slide 31: CDPR – Corporate Overview

    CDPR – CORPORATE OVERVIEW Ownership CORPORATE – OVERVIEW CSE ǀ CDPR OTCMKTS ǀ GPPRF Frankfurt ǀ N8HP *As of March 31, 2023 * Shares Outstanding 313.2 M Options Outstanding 11.0 M Warrants Outstanding 42.1 M Convertible debenture (conv. price $0.25) 6.0 M Fully Diluted Shares Outstanding 372.3 M Publ

  32. Slide 32: CDPR – Peru Mining

    CDPR – PERU MINING PERU – A WORLD CLASS PRODUCER OF PRECIOUS AND BASE METALS, WITH A FRIENDLY INVESTMENT ENVIRONMENT • Peru has a promotional investment framework for mining in place for several decades, including: ➢ No discrimination between national and foreign investments. ➢ Access to stability a

  33. Slide 33: CDPR – The Management Team

    CDPR – THE MANAGEMENT TEAM MANUEL RODRIGUEZ STEVEN ZADKA GUY GOULET President and Director Executive Chairman Executive Director and CEO 30+ years of management and Founding partner of CDPR with 15+ 30+ year track record of investment in investment experience in the Peruvian years of transactional a

  34. Slide 34: CDPR – Board of Directors

    CDPR – BOARD OF DIRECTORS STEVEN ZADKA JOHN G. BOOTH, LLM Executive Chairman / Member of the Audit, GUY GOULET Lead Independent Director / Chair of Audit Governance and Compensation Executive Director and CEO and Governance Committees Committees 30+ year track record of investment in the 30+ years o

  35. Slide 35: Contact – Lima and Québec offices

    Av. Santo Toribio 115 – Piso 7 203 – 22 Lafleur AV. N San Isidro – Lima Saint-Sauveur, Québec Perú J0R 1R0, Canada +51.1.616.3400 +1.579.476.7000

Cerro de Pasco Resources — Investor Presentation (May 2023) on 6ix