Mkango Resources Ltd. · TSXV:MKA

Mkango Resources — Investor Presentation (October 2012)

22 slides from Mkango Resources's investor presentation, October 2012

  1. Slide 1: Mkango Resources

    Mkango Resources Strategic metals - frontier markets September 2011 1

  2. Slide 2: Disclaimer

    This presentation (the “Presentation”) has been prepared by Mkango Resources Limited (the “Company”) solely for its use at informational meetings relating to it or is being delivered for information purposes only. By attending the meeting where this Presentation is made, or by reading the presentati

  3. Slide 3: Forward-looking statements

    This presentation may contain forward-looking statements, including 'forward-looking statements' within the meaning of the United States Private Securities Litigation Reform Act of 1995. Words such as 'expects', 'anticipates', 'intends' or the negative of these terms and other similar expressions of

  4. Slide 4: Mkango Resources - advanced exploration in Malawi

    Mkango Resources - advanced exploration in Malawi Capital structure Executive Directors Shares outstanding 37.4m William Dawes, CEO Alexander Lemon, President Fully diluted 49.1m - Bristol University (BSc Geology), - Oxford Brookes (BSc Geology), Share price (26/10) C$0.28 RSM (MSc Mineral Explorati

  5. Slide 5: Why Malawi?

    Why Malawi?  Stable country - smooth transition to new President, Her Excellency Mrs Joyce Banda  Strong government support for new mining initiatives  Year round exploration and mining, low cost exploration environment  Significant geological potential with improving infrastructure Strong footh

  6. Slide 6: Major infrastructure developments planned or in progress

    Major infrastructure developments planned or in progress  Tete – Nacala railway development will provide access to Nacala deep water port  Both Thambani and Phalombe licences serviced by existing and planned road network  Potential for further hydro and coal fired power stations Planned rail, roa

  7. Slide 7: Main project Songwe is easily accessible by road

    Main project Songwe is easily accessible by road 7

  8. Slide 8: Songwe rare earth project

    Songwe rare earth project 8

  9. Slide 9: Songwe rare earth project

    Songwe rare earth Cartwright Drilling rig project Songwe exploration camp 9

  10. Slide 10: Management team

    Management team Burton Kachinjika Sandra Beaulieu Country manager & local company Director Chief Financial Officer Aoife Brady, PhD James Mtegha Principal geologist & mineralogist Exploration geologist Effie Likaku Ansel Zabula Country Administrator & local company Director Exploration geologist Con

  11. Slide 11: Work completed to date

    Work completed to date  Review of historical data – JICA / MMAJ  Geological mapping  Niton XRF / geochemical grab sampling  Geophysics  Ground radiometrics, gravity and magnetics  Mineralogy  QEMSCAN analysis  SEM, EMPA & LA-ICP-MS • Systematic surface channel sampling using rock saws • Diam

  12. Slide 12: Strong focus on mineralogy

    Strong focus on mineralogy Scanning Electron Microscope, NHM, UK Electron Microprobe (EMP), NHM, UK • REE identified in synchysite, apatite & minor florencite • Synchysite often associated with baryte & strontianite • Apatite mainly occurs as bands & veins • EMP indicates that apatite contains signi

  13. Slide 13: Scoping metallurgical test work underway

    Scoping metallurgical test work underway  Mintek, South Africa engaged to complete scoping metallurgical test work  Longstanding experience in rare earths  Supported by significant mineralogical dataset generated in house by Mkango  Scope of work focused on:  Flotation  Hydrometallurgy PX3 col

  14. Slide 14: Other initiatives at Songwe

    Other initiatives at Songwe SOCIO ENVIRONMENTAL  Employment of local people at the exploration site  Water borehole drilled to supply Mphembezu school and Namalamba village  Two other water boreholes refurbished in the area  Improvement of local infrastructure  Donations of school and sporting

  15. Slide 15: In-situ Mineral Resource estimate

    In-situ Mineral Resource estimate 0.5% TREO cut off grade 1.0% TREO cut off grade 1.5% TREO cut off grade Million TREO TREO Million TREO TREO Million TREO TREO tonnes % tonnes tonnes % tonnes tonnes % tonnes Indicated Indicated Indicated Carbonatite 16.31 1.35 219,978 Carbonatite 11.10 1.62 179,499

  16. Slide 16: Resource upside – open to northeast and to depth

    Resource upside – open to northeast and to depth Stage 1 & 2 drill holes superimposed on Th / K radiometrics Carbonatite outcrops and radiometric anomalies yet to be drilled 16

  17. Slide 17: Why Mkango?

    Why Mkango?  Favourable operating environment  Stable country with major infrastructure developments planned or in progress  Year round exploration and mining operations, low cost exploration  Resource stage rare earth project with strong technical team  Substantial in-situ tonnage defined with

  18. Slide 18: Contact Details

    Contact Details Will Dawes Alex Lemon Chief Executive President will@mkango.ca alex@mkango.ca Mkango Resources Ltd Suite 1400, 700 – 2nd Street SW, Calgary, Alberta T2P 4V5 P +1 403 444 5979 F +1 403 351 1703 18

  19. Slide 19: In-situ Mineral Resource estimates

    In-situ Mineral Resource estimates 19

  20. Slide 20: In-situ Mineral Resource estimates at 1.0% TREO cut-off grade

    In-situ Mineral Resource estimates at 1.0% TREO cut–off grade1 In-situ Indicated Mineral Resource at 1% TREO Cut-Off Indicated Million La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 LREO Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 HREO TREO TREO Th U Tonnes ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm

  21. Slide 21: In-situ Mineral Resource estimates at different cut-off grades

    In-situ Mineral Resource estimates at different cut–off grades1 In-situ Indicated Carbonatite Mineral Resource Cut-Off Million La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 LREO Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 HREO TREO TREO Th U %TREO Tonnes ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm ppm pp

  22. Slide 22: REO distribution at different cut-off grades

    REO distribution at different cut-off grades In-situ Indicated Carbonatite Mineral Resource - REO Distributions at 0.5%, 1.0% and 1.5% TREO Cut-Offs Cut-Off La2O3 Ce2O3 Pr2O3 Nd2O3 Sm2O3 Eu2O3 Gd2O3 Tb2O3 Dy2O3 Ho2O3 Er2O3 Tm2O3 Yb2O3 Lu2O3 Y2O3 Total HREO %TREO % % % % % % % % % % % % % % % % % 0.5

Mkango Resources — Investor Presentation (October 2012) on 6ix