Snowline Gold Corp. · TSX:SGD

Snowline Gold — Investor Presentation (August 2024)

24 slides from Snowline Gold's investor presentation, Aug 20, 2024

  1. Slide 1: A New Light on the Yukon: Investor Presentation

    SNOWLINE GOLD CORP A New Light on the Yukon Investor Presentation August 2024 TSX-V: SGD | OTCQB: SNWGF 1

  2. Slide 2: Cautionary Disclaimer

    CAUTIONARY DISCLAIMER The information in this presentation is in a summary form and does not purport to be complete. It is not intended to be relied upon as advice to investors or potential investors and does not take into account the investment objectives, financial situation or needs of any partic

  3. Slide 3: Investment Highlights

    INVESTMENT HIGHLIGHTS ✓ FOUNDATION OF A DEVELOPER Rapidly advancing our flagship Valley discovery, a best- in-class reduced-intrusion gold system with an initial pit- shell constrained resource 4.05 Moz Au indicated at 1.66 g/t and an additional 3.26 Moz Au inferred at 1.25 g/t* ✓ UPSIDE OF AN EXPLO

  4. Slide 4: A Next-Generation Explorer

    A NEXT-GENERATION EXPLORER 2023 ROBERT E. LECKIE AWARD RECIPIENT FOR EXCELLLENCE IN ENVIRONMENTAL STEWARDSHIP SNOWLINE GOLD IS DRIVEN BY FOUR GUIDING PRINCIPLES: ENVIRONMENTAL RESPECT GOING BIG Recognition that the Yukon’s wilderness is an invaluable Exploring blue-sky concepts in fertile rocks for

  5. Slide 5: Timeline at a Glance

    TIMELINE AT A GLANCE Initial Rogue Project claims Snowline Valley initial MRE staked launched Valley ONGOING discovery 4.1 M oz Au REGIONAL First drill Valley: 554 m indicated & holes at hole: 410 m @ 3.3 M oz Au EXPLORATION 1.9 g/t Au @ 2.5 g/t Au Valley from surface from surface inferred* UPDATED

  6. Slide 6: Creating Shareholder Value

    CREATING SHAREHOLDER VALUE Snowline Gold Developer Peers (Indexed) $8.00 $6.00 $6.04 Share Price (CDN $) $4.00 Snowline outperformed peers by over 750% $2.00 $0.39 -- Jan-22 Apr-22 Jul-22 Oct-22 Jan-23 Apr-23 Jul-23 Oct-23 Jan-24 2022 ACCOMPLISHMENTS 2023 ACCOMPLISHMENTS • Drilled 318.8 m of 2.55 g/

  7. Slide 7: Valley Deposit – Tier 1 Scale

    VALLEY DEPOSIT – TIER 1 SCALE Initial Resource (Moz Au) Current Resource + Cumulative Production (Moz Au) Resource Growth 127% 84% 201% 186% 4,612% 118% 207% 2,193% 942% 160.2 41.3 Valley: Initial indicated resource of 4.1 Moz Au, inferred resource of 3.3 Moz Au* 14.8 13.3 11.9 11.5 9.0 6.5 6.9 5.6

  8. Slide 8: Capital Structure

    CAPITAL STRUCTURE CAPITAL STRUCTURE SHAREHOLDER OWNERSHIP Basic Shares Outstanding 158.4 M Management Options ($0.30 – $5.38 strike price; $25.0M total redemption*) 10.6 M Warrants ($3.50 strike price; $0.7 M total redemption) 0.2 M 7% Other Insiders Restricted Share Units & Deferred Share Units 0.2

  9. Slide 9: The Team

    THE TEAM MANAGEMENT Scott Berdahl, MSc, MBA, PGeo Matthew Roma, CPA Sergio Gamonal, MSc, P.Geo Thomas Branson, MSc, PGeo CEO & Director, Co-Founder CFO Chief Geologist VP Exploration Brian Hegarty, MSc, BSc Stephanie Hansen Steve Rennalls, MSc Admin Zoë Goodyear, BSc Andrew Turner VP Sustainability

  10. Slide 10: Rogue Project - Valley Deposit

    ROGUE PROJECT - VALLEY DEPOSIT • NEW, AT-SURFACE, BULK TONNAGE DRILL DISCOVERY with large, open 3D volume and strong gold grades ideally situated for efficient extraction • GRADE CONSISTENCY Strong continuity within and between holes, with highest grades at surface • EXCEPTIONAL RESULTS Unusually hi

  11. Slide 11: Valley Deposit – Robust Initial Estimate

    VALLEY DEPOSIT – ROBUST INITIAL ESTIMATE • RAPID ADVANCEMENT First ever holes drilled in A A’ September 2021, initial mineral resource estimate based on 28,000 m drilling completed by October 2023 • OPEN TO EXPANSION Strong gold values on multiple open edges of the deposit and large zones of mineral

  12. Slide 12: Valley Deposit – Quality & Quantity

    VALLEY DEPOSIT – QUALITY & QUANTITY B B’ V-23-039 5.0 g/t Au over top 132.0 m Entire hole: 2.5 g/t Au over 553.8 m Pink: >5 g/t Au Red: >2 g/t Au Orange: >1 g/t Au 12

  13. Slide 13: Front-Loaded, Robust Resource

    FRONT-LOADED, ROBUST RESOURCE Incremental Pit Mineral Resources Tonnage Grade Contained Gold Gold Cut-off Mineral Resource Tonnage Grade Contained Gold Shells and Waste (t x 1000) (Au g/t) (oz x 1000) Category (Au g/t) (t x 1000) (Au g/t) (ounces x 1000) Between Indicated Resources 25,463 2.45 2,006

  14. Slide 14: Valley Deposit – Strong Metallurgy

    VALLEY DEPOSIT – STRONG METALLURGY • NON-REFRACTORY METALLURGY with average gold recoveries between 94.1% (bottle roll) and 95.7% (carbon-in-leach) on 75 µm grind (48 hrs) • CLEAN MINERALIZATION with strong natural buffering, low sulphur, low levels of deleterious elements • ADVANCED METALLURGICAL T

  15. Slide 15: Rogue Project - Gracie Target

    ROGUE PROJECT - GRACIE TARGET Valley Snowline drilling to 2.5 g/t Au over 553.8 m GRACIE Reid TARGET • GRACIE: Kilometers-scale gold-in-soil/talus fines anomaly above intact intrusion • 43 talus fine samples from a 1,600 x 800 m central area average 0.49 g/t Au, with 8 samples >1 g/t Au • Visible go

  16. Slide 16: Unlocking a District

    UNLOCKING A DISTRICT >360,000 HECTARE LAND PACKAGE AND 30+ PRIMARY TARGETS Einarson Project – Venus: Historical (2012) drilling to 9.67 g/t Au over 38.7 m, surface grab samples to 191 g/t Au Rogue Project – Aurelius Target: Newly discovered (2023) 2,000 by 500 m anomaly with trench 2.01 g/t Au over

  17. Slide 17: Unexplored, Prospective Ground

    SYDNEY VALLEY UNEXPLORED, PROSPECTIVE GROUND Drill discovery, e.g. 519.6 m averaging 2.46 g/t Au, VALLEY Drill discovery, e.g. 6.0 m averaging 13.9 g/t JUPITER including 3.60 g/t Au over 265.6 m from surface Au, including 45.0 g/t Au over 1.5 m • SNOWLINE DRILL DISCOVERIES: Large mineralized systems

  18. Slide 18: Einarson Project - Jupiter Discovery

    EINARSON PROJECT - JUPITER DISCOVERY • EPIZONAL OROGENIC GOLD system – a novel discovery for this region • WIDESPREAD MINERALIZATION to 13.9 g/t Au over 6.0 m (including 45.0 g/t Au over 1.5 m) encountered in first- ever drill testing at Jupiter • MULTIPLE HIGH-GRADE INTERCEPTS along individual dril

  19. Slide 19: Delivering on 2024 Exploration

    DELIVERING ON 2024 EXPLORATION VALLEY DEPOSIT REGIONAL DRILLING REGIONAL GREENFIELDS (15,000m+ planned) (10,000m+ planned) EXPLORATION • Phase IV drilling towards expansion of • Phase II drilling of multiple regional • Extensive geochemical, geological and the still-open system and resource targets

  20. Slide 20: From Decades of Exploration

    APPENDIX FROM DECADES OF EXPLORATION 1998 1999 • YUKON-BASED FATHER-SON PROSPECTING TEAM Snowline’s portfolio spun out from private, Yukon-based, family-owned prospecting company • DECADES SPENT IN THE YUKON’S SELWYN BASIN Over 30 years’ Scott Berdahl: CEO, Director Scott & Andrew Berdahl on what is

  21. Slide 21: Committed to Land & People

    APPENDIX COMMITTED TO LAND & PEOPLE Seeds of native plants harvested locally from Snowline’s Year-round water quality and hydrology monitoring initiated at project area in 2021, used in ongoing reclamation discovery stage, with local First Nations participation Photo courtesy of Yukon Seed & Restora

  22. Slide 22: Other Gold Assets: Tosh & Cliff

    Due to the recent exploration downturn, the large geochemical anomaly on the Cliff has not been APPENDIX revisited since the soils survey in 2013. The anomaly extends some 1.7 km laterally along a steep OTHER GOLD ASSETS: TOSH & CLIFF mountain slope, so dispersion from a high-grade source alone cann

  23. Slide 23: Other Gold Assets: Ursa

    APPENDIX OTHER GOLD ASSETS: URSA GOLD TARGET: • 9-kilometer trend of elevated gold in heavily folded carbonaceous black shales and cherts. • Geological setting similar to Russia’s Sukhoi Log deposit (67 Moz Au at 1.9 g/t*) SILVER AND BASE METAL TARGET: • 14-kilometer trend of highly anomalous zinc,

  24. Slide 24: Contact Us

    SNOWLINE SNOWLINE GOLD CORP. 1012-1030 W Georgia St GOLD CORP Vancouver, BC V6E 2Y3 Contact Us info@snowlinegold.com snowlinegold.com Follow Us: Investor Presentation TSX-V: SGD | OTCQB: SNWGF 24

Snowline Gold — Investor Presentation (August 2024) on 6ix