Slide 1: August 2017
TSX: LYD August 2017
Slide 2: Cautionary Statements
Cautionary Statements Forward Looking Information & Estimates of Reserves and Resources Certain information contained in this presentation, including any information relating to Amulsar's expected future performance, is "forward looking". All statements in this presentation, other than statements of
Slide 3: Amulsar Gold Project: Compelling Asset – Re-rate Opportunity
Amulsar Gold Project Compelling Asset – Re-rate Opportunity Large Scale Low All in Upside Potential Operation Average Annual LOM Sustaining Costs From Current Production Profile of Resources & Open Production $579/oz Extensions 225,000 oz Construction 100% Owned Underway First Gold Financed Construc
Slide 4: Capital Structure Established for Development
Lydian International Capital Structure Established for Development Capital Structure Ordinary Shares LYD Trading Symbols Publicly-traded Warrants LYD.WT Ordinary Shares 699 MM Shares Publicly-traded Warrants 99 MM Outstanding Unlisted Warrants 5 MM Market C$258 MM Camp water management system. Capit
Slide 5: Strong Investor and Analyst Support
Lydian International Strong Investor and Analyst Support Key Shareholders Analyst Coverage Resource Capital Fund BMO Andrew Breichmanas Orion Mine Finance Management I Limited GMP Oliver Turner European Bank for Reconstruction & Development National Bank Shane Nagle Franklin Resources, Inc. Scotiaba
Slide 6: Armenia: Infrastructure, Government & Workforce
Armenia Infrastructure, Government & Workforce Located on Armenia’s Primary Infrastructure Corridor • Paved access to site • High-voltage power and water on site • Internet and telecom in place Supportive Government • Mining Right, Environmental Impact Assessment, and Technical Safety Program approv
Slide 7: Amulsar Site Plan
Amulsar Site Plan Conventional Open-Pit Heap Leach 7 TSX: LYD
Slide 8: Amulsar Operating Scale and Economics
Amulsar Operating Scale and Economics Amulsar Mine Profile Supports Powerful Economics Operating Profile1 Economic Results $1,250 $1,150 (Unleveraged Gold1 Gold1 Initial Mine Life (Years) 10.0 After-Tax) Annual Tonnes Processed (Mt) 10.2 Free Cash Flow From Operations $1,190MM $1,038 MM Waste : Ore
Slide 9: Large Scale Oxide Deposit
Large Scale Oxide Deposit One of the Largest New Producing Gold Mines in 2018 Tonnes Gold Grade Contained (000s) (g/t) Gold (Koz) Measured and Indicated 142,200 0.76 3,470 Inferred 72,200 0.55 1,280 Proven and Probable 102,653 0.79 2,606 • Waste : ore ratio = 2.2 : 1 • Life-of-mine gold recovery = 8
Slide 10: Amulsar Development: 75% of Capex Committed
Amulsar Development 75% of Capex Committed1 Materials Handling System – Crushing, screening and conveying • Initial components of conveyor on site • Two crushers and screens have arrived on site • Earthworks for the crushing and screening plant platform continue with grading and cut/fill operations
Slide 11: Amulsar Development: Construction Continues to Advance
Amulsar Development Construction Continues to Advance Heap Leach Facility (HLF) • Topsoil stripping is complete • Temporary sediment control dam is complete • Cut and fill for the sub-base and layering for the underdrain is in process Processing Plant (ADR) HLF earthworks. • Equipment fabrication un
Slide 12: Amulsar Development: Construction Continues to Advance
Amulsar Development Construction Continues to Advance Infrastructure • Construction power and water in place • Primary access roads complete • Construction warehouse erected • Detailed design and fabrication of site electrical distribution equipment in process • 250-bed hotel completely renovated an
Slide 13: Near-term Project Milestones
Lydian International Near-term Project Milestones • Complete major earthworks for the HLF, mine haul road, and barren rock storage facility • Complete civils for primary mining and processing facilities • Continued fabrication and delivery to site of major components of the mobile mine fleet, crushi
Slide 14: Comparable Development Stage Companies
Comparable Development Stage Companies Re-Rate Opportunity as Project Advances to First Gold Pour Further Upside – 76.3% 1.3x Implied Upside – 76.1% 0.8x 0.7x 0.7x P / NAV 0.7x 0.6x 0.6x 0.6x 0.5x 0.4x Senior Producer Sabina Atlantic Gold Dalradian Victoria Lundin Gold Pershing Gold Belo Sun Lydian
Slide 15: Investment Thesis
Investment Thesis Amulsar: High Quality Gold Asset Under Construction In construction, with 75%1 of capex committed Multi-million ounce deposit, with upside potential from current resource Low all-in sustaining costs to generate high cash flows Catalyst-rich year with construction milestones First g
Slide 16: Thank You
LYDIAN INTERNATIONAL TSX: THANK YOU
Slide 17: Appendix
Amulsar Gold Project Appendix 17 TSX: LYD
Slide 18: Board of Directors
Board of Directors Development Oriented – Independent, Diverse Experience Gordon Wylie, Non-Executive Director & Chair 32 years mining experience; AngloGold-Ashanti Global, Exploration manager Howard Stevenson, President & CEO 25 years global mining experience; former President & COO of Alacer Gold;
Slide 19: Board of Directors (continued)
Board of Directors (continued) Development Oriented – Independent, Diverse Experience Steve Altmann, Non-Executive Director Managing Director at Morrison Park; former Head of Mining at Desjardins; banking and corporate experience Josh Parrill, Non-Executive Director Resource Capital Funds; formerly
Slide 20: Management
Management Experienced, Committed to Construction Excellence Howard Stevenson, Hayk Aloyan, M.D. – Lydian Armenia President & CEO • 20 years mineral exploration and • 25 years global mining management experience experience • Armenian metallogenesis and • Alacer Gold President & COO resource speciali
Slide 21: Large Scale Oxide Deposit: Upside Potential from Inferred Resources
Large Scale Oxide Deposit Upside Potential from Inferred Resources Mineral Resource Statement AMC Consultants (UK) Limited - February 27, 2017 Quantity Gold Contained Silver Contained Tonnes Grade Gold Grade Silver Classification (000s) (g/t) (Koz) (g/t) (Koz) Measured 51,500 0.83 1,370 4.7 7,700 In
Slide 22: Large Scale Oxide Deposit: Initial 10-Year Mine Plan from Reserves
Large Scale Oxide Deposit Initial 10-Year Mine Plan from 2.6 MM Oz P+P Reserves Mineral Reserve Statement (0.24 g/t gold cutoff) Mine Development Associates, February 27, 2017 Quantity Gold Contained Silver Contained Tonnes Grade Gold Grade Silver Classification (000s) (g/t) (Koz) (g/t) (Koz) Proven