TransGlobe Energy — Q2 2014 Earnings Presentation
17 slides from TransGlobe Energy's earnings presentation, Aug 13, 2014
Slide 1: Q2 2014 Results Conference Call
Q2 2014 RESULTS CONFERENCE CALL AUGUST 13, 2014
Slide 2: Cautionary Statement
CAUTIONARY STATEMENT This presentation may include certain statements that may be deemed to be “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Such statements relate to possible future events. All statements other than statements of histo
Slide 3: Q2 2014 Financial Highlights
Q2 2014 FINANCIAL HIGHLIGHTS Funds flow of Earnings of $43.2MM* $26.2MM* ($0.57/share) ($0.35/share) Spent $110.1MM in $17.1MM on cash and cash expl and dev equivalents Positive Collected working capital $45.1MM from of $271MM EGPC • Dividend of $0.05 per share will be paid on September 30, 2014 to
Slide 4: EGPC Accounts Receivables
EGPC ACCOUNTS RECEIVABLES • Targeting $250 Million in 2014, 2013 Collections of $275 Million • Collections in Q2 were $45.1 Million AR outstanding vs Months outstanding AR outstanding vs Production per day $250,000 12 $250,000 20,000 18,000 10 $200,000 $200,000 16,000 8 14,000 $150,000 $150,000 12,0
Slide 5: Q2 Sales
Q2 SALES Sales (Bopd) Q2 July West Gharib 9,987 9,422 West Bakr 5,182 4,946 East Ghazalat 786 687 Egypt Total 15,955 15,055 Yemen 529 220 Sales Total 16,485 15,275 Production 16,112 5
Slide 6: Current Daily Production
CURRENT DAILY PRODUCTION PCP Failures/Declines Q2 – 16,112 BOPD JULY – 15,275 BOPD Q3 Est – ~15.0 MBOPD 6
Slide 7: 2014 Guidance – Under Review
2014 GUIDANCE – UNDER REVIEW • Q1 + Q2 ~ 17.2 MBopd • Q3 ~ 15.0 Mbopd Production • West Gharib pump uncertainties • Yemen S-1 shut in • $126.5MM ($1.67/share) 2014 • $117.2MM excluding $9.3MM Caracal termination fee Funds Flow • Q3 & Q4 at 15.0 Mbopd and $100 Brent • $6MM ($0.07/share) Funds Flow se
Slide 8: Egypt Assets: Eastern Desert
EGYPT ASSETS: EASTERN DESERT East Ghazalat (50%) South Alamein (100%) • Acquired 2010 • Acquired 2012 • 102,000 Gross acres • 197,000 Gross acres • Dev & Expl • Expl CAIRO West Gharib (100%) • Acquired 2007 West Bakr (100%) • 28,000 Gross acres • Acquired 2011 • Dev South Ghazalat (100%) • 12,000 Gr
Slide 9: West Gharib: 100% WI - Operated
WEST GHARIB: 100% WI - OPERATED 2014 Plan 9 wells Waterflood optimization Hoshia ASP flood simulation/lab work Facility centralization and upgrades Q2 9,987 Bopd Drilled 3 oil wells YTD drilled 8 wells 7 oil wells, 1 D&A Drilling last well in program Rig moving to NWG #10 in
Slide 10: NW Gharib: 100% WI - Operated
NW GHARIB: 100% WI - OPERATED Prospective Resources * Chance of Wells Description (millions of Success barrels) Nukhul pools proximal NWG 1,2,3,4,5,7 6.9 40 to 60% to Arta / East Arta NWG 6 Nukhul structure 11.8 16% NWG 8 Nukhul structure 1.9 24% NWG 9 Nukhul structure 1.8 12% Markhu / Rudies NWG 10
Slide 11: West Bakr: 100% WI - Operated
WEST BAKR: 100% WI - OPERATED 2014 Plan 17 wells H Water flood optimization Facility upgrades and optimization M Q2 K 5,182 Bopd Drilled 4 oil wells YTD drilled 7 wells 3 oil wells K field 4 oil wells, 1 injector well H field 11
Slide 12: Eastern Desert: 100% WI - Operated
EASTERN DESERT: 100% WI - OPERATED Planning large seismic program for 2014/15 in Egypt NW Gharib Total program ~ 1,400 km² 3-D & 300 km 2-D Eastern Desert ~ 1,000 km² 3-D & 300 km 2-D Western Desert ~ 400 km² 3-D NW Gharib 2014 Plan: up to 17 wells, 3-D seismic 79 exploration and appra
Slide 13: Egypt Assets: Western Desert
EGYPT ASSETS: WESTERN DESERT East Ghazalat (50%) South Alamein (100%) • Acquired 2010 • Acquired 2012 • 102,000 Gross acres • 197,000 Gross acres • Dev & Expl • Expl CAIRO West Gharib (100%) • Acquired 2007 West Bakr (100%) • 28,000 Gross acres • Acquired 2011 • Dev South Ghazalat (100%) • 12,000 Gr
Slide 14: East Ghazalat: 50% WI - Non-Operated
EAST GHAZALAT: 50% WI - NON-OPERATED 2014 Plan North Dabaa Dev Lease 5 wells Safwa Field N Dabaa Dev Q2 795 Bopd to TG 1 Safwa oil well YTD drilled 3 wells EG #3 expl D&A 2 Safwa oil wells Drilling N.Dabaa #2 appraisal well Next well Safwa Horizontal Dev well 14
Slide 15: South Ghazalat: 100% WI - Operated
SOUTH GHAZALAT: 100% WI - OPERATED North Dabaa Dev Lease 2015 Plan 400 km² 3-D seismic program on SW portion of block 15
Slide 16: Q&A
Q&A 16
Slide 17: Q2 2014 Results Conference Call
Q2 2014 RESULTS CONFERENCE CALL AUGUST 13, 2014