TransGlobe Energy Corporation

TransGlobe Energy — Q2 2014 Earnings Presentation

17 slides from TransGlobe Energy's earnings presentation, Aug 13, 2014

  1. Slide 1: Q2 2014 Results Conference Call

    Q2 2014 RESULTS CONFERENCE CALL AUGUST 13, 2014

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation may include certain statements that may be deemed to be “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Such statements relate to possible future events. All statements other than statements of histo

  3. Slide 3: Q2 2014 Financial Highlights

    Q2 2014 FINANCIAL HIGHLIGHTS Funds flow of Earnings of $43.2MM* $26.2MM* ($0.57/share) ($0.35/share) Spent $110.1MM in $17.1MM on cash and cash expl and dev equivalents Positive Collected working capital $45.1MM from of $271MM EGPC • Dividend of $0.05 per share will be paid on September 30, 2014 to

  4. Slide 4: EGPC Accounts Receivables

    EGPC ACCOUNTS RECEIVABLES • Targeting $250 Million in 2014, 2013 Collections of $275 Million • Collections in Q2 were $45.1 Million AR outstanding vs Months outstanding AR outstanding vs Production per day $250,000 12 $250,000 20,000 18,000 10 $200,000 $200,000 16,000 8 14,000 $150,000 $150,000 12,0

  5. Slide 5: Q2 Sales

    Q2 SALES Sales (Bopd) Q2 July West Gharib 9,987 9,422 West Bakr 5,182 4,946 East Ghazalat 786 687 Egypt Total 15,955 15,055 Yemen 529 220 Sales Total 16,485 15,275 Production 16,112 5

  6. Slide 6: Current Daily Production

    CURRENT DAILY PRODUCTION PCP Failures/Declines Q2 – 16,112 BOPD JULY – 15,275 BOPD Q3 Est – ~15.0 MBOPD 6

  7. Slide 7: 2014 Guidance – Under Review

    2014 GUIDANCE – UNDER REVIEW • Q1 + Q2 ~ 17.2 MBopd • Q3 ~ 15.0 Mbopd Production • West Gharib pump uncertainties • Yemen S-1 shut in • $126.5MM ($1.67/share) 2014 • $117.2MM excluding $9.3MM Caracal termination fee Funds Flow • Q3 & Q4 at 15.0 Mbopd and $100 Brent • $6MM ($0.07/share) Funds Flow se

  8. Slide 8: Egypt Assets: Eastern Desert

    EGYPT ASSETS: EASTERN DESERT East Ghazalat (50%) South Alamein (100%) • Acquired 2010 • Acquired 2012 • 102,000 Gross acres • 197,000 Gross acres • Dev & Expl • Expl CAIRO West Gharib (100%) • Acquired 2007 West Bakr (100%) • 28,000 Gross acres • Acquired 2011 • Dev South Ghazalat (100%) • 12,000 Gr

  9. Slide 9: West Gharib: 100% WI - Operated

    WEST GHARIB: 100% WI - OPERATED  2014 Plan  9 wells  Waterflood optimization  Hoshia ASP flood simulation/lab work  Facility centralization and upgrades  Q2  9,987 Bopd  Drilled 3 oil wells  YTD drilled 8 wells  7 oil wells, 1 D&A  Drilling last well in program  Rig moving to NWG #10 in

  10. Slide 10: NW Gharib: 100% WI - Operated

    NW GHARIB: 100% WI - OPERATED Prospective Resources * Chance of Wells Description (millions of Success barrels) Nukhul pools proximal NWG 1,2,3,4,5,7 6.9 40 to 60% to Arta / East Arta NWG 6 Nukhul structure 11.8 16% NWG 8 Nukhul structure 1.9 24% NWG 9 Nukhul structure 1.8 12% Markhu / Rudies NWG 10

  11. Slide 11: West Bakr: 100% WI - Operated

    WEST BAKR: 100% WI - OPERATED  2014 Plan  17 wells H  Water flood optimization  Facility upgrades and optimization M  Q2 K  5,182 Bopd  Drilled 4 oil wells  YTD drilled 7 wells  3 oil wells K field  4 oil wells, 1 injector well H field 11

  12. Slide 12: Eastern Desert: 100% WI - Operated

    EASTERN DESERT: 100% WI - OPERATED  Planning large seismic program for 2014/15 in Egypt NW Gharib  Total program ~ 1,400 km² 3-D & 300 km 2-D  Eastern Desert ~ 1,000 km² 3-D & 300 km 2-D  Western Desert ~ 400 km² 3-D  NW Gharib  2014 Plan: up to 17 wells, 3-D seismic  79 exploration and appra

  13. Slide 13: Egypt Assets: Western Desert

    EGYPT ASSETS: WESTERN DESERT East Ghazalat (50%) South Alamein (100%) • Acquired 2010 • Acquired 2012 • 102,000 Gross acres • 197,000 Gross acres • Dev & Expl • Expl CAIRO West Gharib (100%) • Acquired 2007 West Bakr (100%) • 28,000 Gross acres • Acquired 2011 • Dev South Ghazalat (100%) • 12,000 Gr

  14. Slide 14: East Ghazalat: 50% WI - Non-Operated

    EAST GHAZALAT: 50% WI - NON-OPERATED  2014 Plan North Dabaa Dev Lease  5 wells Safwa Field  N Dabaa Dev  Q2  795 Bopd to TG  1 Safwa oil well  YTD drilled 3 wells  EG #3 expl D&A  2 Safwa oil wells  Drilling N.Dabaa #2 appraisal well  Next well Safwa Horizontal Dev well 14

  15. Slide 15: South Ghazalat: 100% WI - Operated

    SOUTH GHAZALAT: 100% WI - OPERATED North Dabaa Dev Lease  2015 Plan  400 km² 3-D seismic program on SW portion of block 15

  16. Slide 16: Q&A

    Q&A 16

  17. Slide 17: Q2 2014 Results Conference Call

    Q2 2014 RESULTS CONFERENCE CALL AUGUST 13, 2014

TransGlobe Energy — Q2 2014 Earnings Presentation on 6ix