  1. Slide 1: Southern Africa Site Visit

    SOUTHERN AFRICA SITE VISIT 21st November 2016 Jwaneng mine

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT Disclaimer: This presentation has been prepared by Anglo American plc (“Anglo American”) and comprises the written materials/slides for a presentation concerning Anglo American. By attending this presentation and/or reviewing the slides you agree to be bound by the following con

  3. Slide 3: Welcome and Agenda

    WELCOME AND AGENDA Paul Galloway - Monday morning Introduction and business update - Monday afternoon De Beers Global Sightholder Sales - Monday evening De Beers management dinner - Tuesday Jwaneng diamond mine - Tuesday evening Platinum management dinner - Wednesday Mogalakwena mine - Wednesday eve

  4. Slide 4: What You Will See This Week

    WHAT YOU WILL SEE THIS WEEK OUR RESOURCES  Jwaneng and Mogalakwena: World class RESOURCE endowments support the building of world ENDOWMENT class assets. OUR BUSINESS PROCESSES PEOPLE  Operating Model: Provides the structure DRIVING and discipline to build world class operations. COMPETITIVE ADVAN

  5. Slide 5: Commodity Prices

    COMMODITY PRICES Indexed commodity prices1 (1 Jan 2016 = 1) Indexed commodity price (1 Jan 2016 = 1) 2016 YTD Var. 1 Jan ‘16 3.6 Vs. 10 Nov ’16 3.4 3.2 Met Coal(2) +249% 3.0 2.8 2.6 2.4 2.2 Iron ore(3) +73% 2.0 1.8 Thermal Coal(4) +52% 1.6 (5) +40% 1.4 Copper +21% 1.2 1.0 Platinum(6) +17% 0.8 Diamon

  6. Slide 6: In Delivery Mode…

    IN DELIVERY MODE… • Focus on Resource Potential and Asset Quality. Portfolio • Repositioning to focus on Leading Positions. • Top tier assets in other commodities support cash flow and returns. • Deleveraging to enhance flexibility. Balance Sheet • Dividend the priority once balance sheet strength r

  7. Slide 7: Safety & Environment

    SAFETY & ENVIRONMENT Safety: Loss of life and TRCFR(1) SAFETY 20 1.29 1.4  Regrettably, 10 fatalities at end-October 2016. 1.08 1.2 0.93 15 0.8 1  Total recordable injuries rate and lost time injures 1 5 0.72 10 2 0.8 rate continue to improve – down 23% and 19% 2 3 2 0.6 respectively when compared

  8. Slide 8: In Delivery Mode…Key Milestones

    IN DELIVERY MODE…KEY MILESTONES Grosvenor decline  GAHCHO KUÉ COMMISSIONING • On time and on budget.  BARRO ALTO RAMP-UP COMPLETE • Nameplate capacity achieved in Q3.  DELIVERY OF GROSVENOR • Ahead of schedule and under budget.  MINAS-RIO RAMP-UP PLAN • Step 2 Licence received. • On track for 20

  9. Slide 9: In Delivery Mode…Portfolio Restructuring

    IN DELIVERY MODE…PORTFOLIO RESTRUCTURING Number of assets 2016 Key Portfolio Changes 26 assets Rustenburg 70 68 Callide 65 60 Foxleigh 55 Completed 55 sales Niobium & Phosphates 50 Disposal 45 45 Tarmac Middle East 42 40 Kimberley 35 Pandora 30 Sale Announced 25 Dartbrook 20 Thabazimbi 15 Closure 10

  10. Slide 10: In Delivery Mode…Organisation Restructuring

    IN DELIVERY MODE…ORGANISATION RESTRUCTURING Employee and contractor numbers Support Operations -41% 162,000 151,000 13,000 128,000 11,500 120,000 10,500 95,500 95,500 8,800 Other Coal Iron ore De Beers Copper Platinum 2013 2014 2015 H1 2016 2016F 2016F 10

  11. Slide 11: In Delivery Mode…The Impact of Change

    IN DELIVERY MODE…THE IMPACT OF CHANGE 11

  12. Slide 12: Portfolio Choices Driven by Asset Potential

    PORTFOLIO CHOICES DRIVEN BY ASSET POTENTIAL De Beers Platinum Copper Bulks and Other Minerals  Jwaneng  Mogalakwena  Los Bronces Botswana Iron ore • Kumba  Orapa  Amandelbult Chile and • Minas-Rio  Collahuasi manganese • Samancor  Venetia • BRPM South Africa South • Voorspoed Africa • Mototol

  13. Slide 13: Capital Allocation

    CAPITAL ALLOCATION “Disciplined capital planning to achieve our balance sheet objectives whilst maximising the value of the business” • Strict value criteria applied. • 2016 cost and volume savings of • Syndication considered on major $1.6bn targeted. projects. • Working capital improvement of • No

  14. Slide 14: Delivering Change to Unlock Our Potential

    DELIVERING CHANGE TO UNLOCK OUR POTENTIAL 1  Key project delivery: Minas-Rio, Barro Alto, Gahcho Kué and Grosvenor. Repositioning Our  Disposal programme continues to drive focus on highest priority assets. Portfolio  Restructured with 41% fewer people and 26 fewer assets than 2013. 2  Operating

  15. Slide 15: Redefining Mining Through Operating Best Practice and Innovation

    REDEFINING MINING THROUGH OPERATING BEST PRACTICE AND INNOVATION

  16. Slide 16: Operating Model – The Foundation

    OPERATING MODEL – THE FOUNDATION  Operating Model is our operating and technical platform  3 essential components that are interlinked – initial focus on Work Management but key elements of Operational Planning and Feedback now in place  Work Management ensures execution  Applying high capabilit

  17. Slide 17: Implementation Well Under Way – Multi-Stage Process

    IMPLEMENTATION WELL UNDER WAY – MULTI-STAGE PROCESS Work management continues with operational planning ramping up Project Iron ore Platinum De Beers Copper *WM = Work Management OP = Operational Planning 17

  18. Slide 18: Operating Model – Impact Showing in the Numbers

    OPERATING MODEL – IMPACT SHOWING IN THE NUMBERS Jwaneng - live in September 2016 Mining 2013 2016 YTD  Mining productivity benefits Productivity already being realised through Shovels Shovel productivity the implementation process 1,427 1,672 (t/hr) well above target  Additional productivity benef

  19. Slide 19: Mogalakwena North Concentrator

    MOGALAKWENA NORTH CONCENTRATOR Technical Expertise combined with the Tonnes Milled (daily average) Operating Model Implementation (Kt) +26%  Operating Model live in December 2015 20.9 21.5 22.6 19.9 18.0  To date it delivered: • 26% increase in tonnage throughput from 2013 2012 2014 2015 Q1 2016 Q

  20. Slide 20: Minas-Rio – Benefits of Stability & Ore Control

    MINAS-RIO – BENEFITS OF STABILITY & ORE CONTROL  Stability of processing plant and proper ore blending have led to recovery improvements  Defining the operating parameters, work management and monitoring have delivered the benefits Mass Recovery (%) Metallurgical Recovery (%) Mass Recovery (%) Met

  21. Slide 21: Focus – Cash Generation

    Jwaneng mine FOCUS – CASH GENERATION Delivering our targets

  22. Slide 22: Operating Performance

    OPERATING PERFORMANCE In 2014 we highlighted “What good looks like” Mining “What good looks like” Asset Strategy “What good looks like” Drill & blast  Mine-to-Plan compliance >90% Delivering  Plant OEEs of 90-95% design OEE* Load & haul  Payloads consistently at 95-100% of design Maintenance  Ac

  23. Slide 23: Los Bronces – End-Value Estimation

    LOS BRONCES – END-VALUE ESTIMATION Moving beyond ‘grade only’ to value based ore selection (VBOC) Overview  Ore control determines ore destination (flotation, leach, stockpile, waste)  Traditional grade control has been based on copper grade only  Additional value now realised by taking into acco

  24. Slide 24: Copper Improvement – Recovery Optimisation

    COPPER IMPROVEMENT – RECOVERY OPTIMISATION  Over 40% improvement in molybdenum recovery Molybdenum Recovery - Plant 2 with a ‘back to good technical basics’ approach, Recovery % +40% focussing on: 49.8 • Process Optimisation 43.0 44.1 35.5 • Process Efficiency Q1 2015 Q2 2015 - Q4 2015-Q1 2016 Q2 2

  25. Slide 25: Pit Slope Optimisation – Mogalakwena Mine

    PIT SLOPE OPTIMISATION – MOGALAKWENA MINE Waste reduction  $700M increase in Discounted Cash Flow (+22%) over 15 years Additional ore  Phase 1 Project increased wall angles from 45 to 50 degrees  5 million tonnes less waste in 2017, and 15% 50o wall reduction over next 15 years Slope design  Was

  26. Slide 26: What Does the Future Look Like

    WHAT DOES THE FUTURE LOOK LIKE Redefining Mining Polokwane smelter robotics

  27. Slide 27: Redefining Mining Innovation – A Fresh Approach

    REDEFINING MINING INNOVATION – A FRESH APPROACH Our opportunity is to aggressively move to leading edge performance with rapid adoption of current / near technologies… Consider entire Open Forums Technology SmartPath value chain Programmes Use multiple Ideate Internal Valued defined Entrepreneurial

  28. Slide 28: Our Open Forum – Collaborative Ideation

    OUR OPEN FORUM – COLLABORATIVE IDEATION ~50 themes ~4500 ideas… 9 Programmes Sustainability (Water) Processing Mining Closed loop water system Concentrating the mine Alternate Transport Waterless Separation Modular Plant Modern Mine Smart Intensifiers Swarm Robotic Mining System-Wide Enablers Mining

  29. Slide 29: Step Change in Capital Efficiency - Concentrate the Mine

    STEP CHANGE IN CAPITAL EFFICIENCY - CONCENTRATE THE MINE Objective and approach  Increase plant throughput by improved ore fragmentation Coarse Mine to  Increase the effective head grade - early stage Particle Mill waste rejection Recovery  Incorporate coarse particle recovery Early stage waste P

  30. Slide 30: Concentrate the Mine – Advanced Mine to Mill

    CONCENTRATE THE MINE – ADVANCED MINE TO MILL Approach  Applying advanced blasting techniques • High energy explosives (VOD ~6000 m/s) • Short inter-hole delay timing to increase explosive energy interaction • Detailed timing sequence to encapsulate blast volume and buffer vibration levels • 25% imp

  31. Slide 31: Concentrate the Mine – Coarse Particle Recovery

    CONCENTRATE THE MINE – COARSE PARTICLE RECOVERY Approach Las Tortolas  Employing new technology to coarsen the grind size while maintaining recovery Indicative results of modified process  Reduce grinding energy by 20-30%  Reduce conventional tailings volume to 20% and water make up to 30%  Unlo

  32. Slide 32: Our Aspiration – Towards Dry Tailings

    OUR ASPIRATION – TOWARDS DRY TAILINGS El Soldado tailings dam Water efficiency is a step-change opportunity  Efficiency enables increased throughput  Improves expansion opportunities to develop new mines in water-stressed areas  Reduces safety and environmental risks Two approaches 1) Create less

  33. Slide 33: Questions

    QUESTIONS