PT Bayan Resources Tbk · IDX:BYAN
PT Bayan Resources Tbk — Q1 2020 Earnings Presentation
24 slides from PT Bayan Resources Tbk's earnings presentation, 2020
Slide 1: www.bayan.com.sg
www.bayan.com.sg 0
Slide 2: Overview 1Q20
Overview 1Q20 2020 started with another challenging quarter as although water levels improved compared to 4Q19 levels, they remained below expectations. This resulted in no inventory reduction over the first quarter. Tabang suspend their mining operation from 25 March 2020 until 14 May 2020 due
Slide 3: Bayan's Financial and Operational Performance
Bayan’s Financial and Operational Performance 2018 2019 1Q19 1Q20 Financial Performance (In Million USD) Revenue 1,676.7 1,391.6 365.4 326.3 Gross Profit 846.9 489.4 153.5 90.3 EBITDA 736.4 374.4 127.0 66.9 Net Profit After Tax 524.3 234.2 86.9 40.2 Financial Ratios Gross Profit Margin (%) 50.5% 35.
Slide 4: One of the Quickest Growing Coal Producers
One of the Quickest Growing Coal Producers 2019 Production Bayan is one of the top five coal 100 86.3 producers by volume in Indonesia. 80 Million Tonnes 58.0 60 40 34.3 31.9 29.1 23.4 20 0 BUMI Adaro Kideco Bayan PTBA ITMG Source: Company Filings, Company Data 2017 - 2019 CAGR (Production) 2019
Slide 5: One of the Lowest Cost Producers in Indonesia
One of the Lowest Cost Producers in Indonesia Global Cost Competitive Positioning Tabang is independently rated as Q1 Q2 Q3 Q4 one of the worlds lowest cost Tabang energy-adjusted producers. Tabang has large reserves and a very low Life of Mine (LOM) stripping ratio and last year Seaborne Export
Slide 6: And One of the Highest Margin Producers in Indonesia
And One of the Highest Margin Producers in Indonesia 2019 EBITDA Margin (%) Over the last few years Bayan has 40 34.9 transformed itself into one of the 29.3 highest margin producers in 26.9 30 Indonesia. 20 16.4 14.1 This is due to the ramp up of its 10 7.3 world class Tabang coal complex, whic
Slide 7: Deleveraged the Group
Deleveraged the Group In January 2020, The Company Net Debt / EBITDA issued a 3 Non-Call Life Bond of x USD 400 million to ensure 8 adequate liquidity going forward. 5.8x 6 Existing Working Capital Facilities 4 still available. 2.6x 2 0.1x 0.5x 0.5x The Group now has the financial 0 0 strength
Slide 8: Low Cost Incremental Growth
Low Cost Incremental Growth Capex Intensity by Country (1) Overall sales volumes to be maintained whilst infrastructure 250 for the next phase is ongoing. Tabang Capacity Growth New coal haul road and barge 218 55+ 207 200 30+ loading facility targeted to be 175 constructed and brought into 159
Slide 9: 1Q 2020
1Q 2020 Overburden Removal Coal Production Weighted Average Strip Ratio Average Cash Costs Coal Sales Average Selling Price Committed & Contracted Sales EBITDA Debt and Cash Position Capital Expenditure 8 www.bayan.com.sg
Slide 10: Overburden Removal (OB)
Overburden Removal (OB) (million BCM) 1Q20 OB was 35.2 million BCM 50 which was lower than the Budget 39.8 40 38.1 34.5 35.2 but consistent with 4Q19 levels due to: 30 All overburden contractors at 20 Tabang going on standby for 10 11 days in March 2020. 0 Higher rainfall in the 1Q20 1Q19 4Q19
Slide 11: Coal Production
Coal Production (million MT) 10 1Q20 coal production of 7.3 million 8.9 7.5 7.3 MT was lower than the Budget but 8 5.9 higher than 4Q19 due to: 6 Tabang on standby for 11 days 4 in March 2020. 2 Lower in TSA/FKP due to heavy rain which restricted 0 1Q19 4Q19 1Q20B 1Q20 coal extraction. Note :
Slide 12: Weighted Average Stripping Ratio (SR)
Weighted Average Stripping Ratio (SR) 7 5.9 6 1Q20 weighted average stripping 5 5.0 4.5 4.8 ratio was higher than the Budget 4 mainly due to: 3 Tabang on standby for 2 11 days in March 2020. 1 0 Partially offset by: 1Q19 4Q19 1Q20B 1Q20 Note : B stands for Budget Figure Lower SR at WBM due to
Slide 13: Average Cash Costs
Average Cash Costs 40 33.3 37.0 35.6 1Q20 Cash Costs were US$ 35.6/MT 30.4 and higher than the Budget due to: 30 Higher overburden removal 20 costs due to: 10 o Lower sales volume. 0 o Higher weighted average 1Q19 4Q19 1Q20B 1Q20 SR than Budgeted. Average Cash Costs include Royalty, Barging and
Slide 14: Average Cash Costs (Continued)
Average Cash Costs (Continued) 1Q20 Cash Costs of US$ 35.6/MT were lower than 4Q19 of US$ 37.0 due to: Lower overburden costs due to o Higher sales volume. o Lower weighted average SR than 4Q19. o Lower standby cost in the 1Q20 as the standby period was shorter than 4Q19. Lower unit cost of va
Slide 15: Coal Sales (by volume)
Coal Sales (by volume) 12 (million MT) 10.8 10 Average water levels improved to 8 7.3 7.3 allow better barging in the 1Q20 6 5.6 than 4Q19. 4 However 1Q20 coal sales 2 volumes of 7.3 million MT were 0 lower than Budgeted due to lower 1Q19 4Q19 1Q20B 1Q20 Note : B stands for Budget Figure water l
Slide 16: Coal Sales (by volume) (continued)
Coal Sales (by volume) (continued) Geographic Distribution (YTD 1Q20) – by Volume The Company is focusing on continuing to build its long term Per Region Per Country contracts to Indonesian and other Domestic North Asia Others 9% Philippines South East Asian IPP’s 13% 30% Indonesia 25% 13% As at
Slide 17: Average Selling Price (ASP)
Average Selling Price (ASP) 60 1Q20 ASP of US$ 44.6/MT was higher 50.1 the Budget due to Budgeted CV 50 44.7 combined with a higher proportion of 44.6 fixed price sales than Budgeted. (US$ / MT) 39.3 40 Benchmark prices in the 1Q20 were 30 in-line with Budget and reasonably consistent with 4Q19
Slide 18: EBITDA
EBITDA 150 127.0 1Q20 EBITDA increased compared to 4Q19 on the back of higher 95.2 100 sales volumes and lower cash 66.9 costs. 50 46.3 However, 1Q20 EBITDA was significantly lower than Budgeted 0 1Q19 4Q19 1Q20B 1Q20 due to lower sales volumes and Note : B stands for Budget Figure higher cash c
Slide 19: Debt and Cash Position
Debt and Cash Position 450 423.1 Issued US$ 400 million 3NCL 400 408.2 Bonds at 6.125% coupon on 332.6 365.0 24 Jan 2020. 350 (in million US$) 300 272.5 Bond proceeds used to fully repay 250 210.0 existing working capital facilities 200 190.0 181.7 of USD 365 million in January and February 2020
Slide 20: Capital Expenditure
Capital Expenditure 60 YTD Capex was USD 16.5 million, 48.3 which was below the Budget (USD 50 24.9 million) 40 In Million USD 28.5 28.5 27.7 Major ongoing projects are: 30 24.9 20.8 23.0 Expansion at Tabang including: 20 17.5 16.5 • Gunungsari jetty expansion. 11.1 10 • Senyiur jetty expansio
Slide 21: Appendix
Appendix PT Perkasa Inakakerta PIK PT Teguh Sinarabadi TSA PT Firman Ketaun Perkasa FKP PT Wahana Baratama Mining WBM PT Brian Anjat Sentosa BAS PT Bara Tabang BT PT Fajar Sakti Prima FSP PT Dermaga Energi DE Tabang PT Tanur Jaya TJ PT Tiwa Abadi TA PT Silau Kencana SK PT Orkida Makmur OM Pakar PT S
Slide 22: Appendix
Appendix Kangaroo Resources Pty Ltd KRL PT Dermaga Perkasapratama DPP PT Indonesia Pratama IP PT Muji Lines Muji PT Bayan Energy BE PT Metalindo Prosestama MP PT Sumber Aset Utama SAU PT Karsa Optima Jaya KOJ PT Gunungbayan Pratamacoal GBP 21 www.bayan.com.sg
Slide 23: Disclaimer
Disclaimer This presentation contains forward-looking statements based on assumptions and forecasts made by PT. Bayan Resources Tbk management. Statements that are not historical facts, including statements about our beliefs and expectations, are forward-looking statements. These statements are base
Slide 24: Thank You
Thank You 23 www.bayan.com.sg