  1. Slide 1: Integrated Resource Plan 2009: Introduction & IRP Basics

    Integrated Resource Plan 2009 Introduction & IRP Basics April 10, 2009

  2. Slide 2: Workshop Agenda

    Workshop Agenda • Introduction & IRP Basics • CO2 Costs / Price Drivers – – Dr. Mark Trexler – DNV • Future Technology Options – – Ellen Petrill – EPRI • Legislative Environment: Climate Change • CO2 Price Approach • Boardman RH BART – RH BART (Regional Haze / Best Available Retro-fit Technology) •

  3. Slide 3: Integrated Resource Planning (IRP)

    Integrated Resource Planning (IRP) The primary goal of IRP is to identify a future resource action plan, that when considered with our existing portfolio, provides the best combination of expected cost and associated risks and uncertainties for PGE and its customers. The IRP Process: PGE files an In

  4. Slide 4: PGE Supply Portfolio

    PGE Supply Portfolio 2008 2012 Natural Gas Natural Gas 25% Purchases Purchases 25% 22% 22% Hydro 14% Coal Coal Hydro 24% 24% 25% PGE Low-Impact Hydro (RPS) Wind (RPS) Wind (RPS) 2% 4% 13% After economic dispatch. Based on IRP data tracking annual energy needs on an expected basis. 4 PGE Low-Impact h

  5. Slide 5: Projected Resource Need: Energy

    Projected Resource Need: Energy 3500 Retail Load w/ Future EE 3000 Retail Load 2500 Annual Average Availability MWa 2013 Shortfall 2017 Shortfall 2020 Shortfall 615 MWa 980 MWa 1,277 Mwa 472 MWa 702 MWa 956 MWa 2000 Renewables RFP Long-term Contracts Wind (Biglow, Klondike II, Vansycle Ridge) 1500 H

  6. Slide 6: Projected Resource Need: Capacity

    Projected Resource Need: Capacity January Capacity Need 6,000 Retail Load w/ Reserves Retail Load w/ Reserves & Future EE 5,000 4,000 2013 Shortfall 2017 Shortfall 2020 Shortfall MW Capacity Available 1,336 MW 1,922 MW 2,336 MW 1,272 MW 1,726 MW 2,126 MW 3,000 Long-Term Contracts (Includes DSG) Hydr

  7. Slide 7: RES Requirements: Energy

    RES Requirements: Energy 1600 1400 1200 1000 Renewables Existing or MWa 800 Under Development Renewables 600 Required 400 New Resources Needed 200 0 2011 2015 2020 2025 Year 7

  8. Slide 8: What Will Carbon Cost?

    What Will Carbon Cost? The Trillion Dollar Question Facing Corporate and Public Strategy Dr. Mark C. Trexler April 10, 2009

  9. Slide 9: Table of Contents

    Table of Contents 1. Setting the Context 2. Forecasting Carbon Markets 3. The Key Forecasting Question 4. Making Sense of It All © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 2

  10. Slide 10: 1. Setting the Context

    1. Setting the Context © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 3

  11. Slide 11: Carbon Costs are THE Key!

    Carbon Costs are THE Key! Can Society Afford Emissions Targets? Will Targets be Near Term or Long-Term? What Will Cap and Trade Compliance Cost Companies? Will Carbon Costs Promote New Technologies? What Power Plants Should Utilities be Building? Note: Carbon Costs Calculated in a Number of Ways © D

  12. Slide 12: And GHG Markets Very Different!

    And GHG Markets Very Different! Demand is (Obviously) a Function of Policy Decisions But (Less Obviously) So Is Supply! No Other Commodity With These Characteristics © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 5

  13. Slide 13: The Search for Price Discovery

    The Search for Price Discovery A Wide Variety of Price Signals - Chicago Climate Exchange: $2.50/ton - Current International Credit Prices: $10-15 - EU Emissions Trading System Prices in 2006: $45 - Voluntary Credits: $2-50 A Wide Variety of Price Projections - Inconsequential prices, based on weak

  14. Slide 14: A Recent Literature Review

    A Recent Literature Review • Highest Recent Price Projection: $257/Ton CO2e By 2025 To Reduce Emissions to 70% Below 2005 Levels By 2050 • (Lieberman-Warner; 14% Cap Met With Offsets). • Lowest Recent Price Projection: $0.35/Ton CO2e By 2025 To Stabilize at 750 ppm In The Year 2100. • Again, Carbon

  15. Slide 15: Changing Our Perspective

    Changing Our Perspective At The End of the Day, It Should Not be a Question of “What’s The Correct Prediction of 2015 Carbon Prices?” Instead: “What Carbon Value Does It Make Sense to Build Into Our Decisionmaking Given Our View of Future Policies, Our Sensitivity To Carbon Prices, And The Risks Ass

  16. Slide 16: 2. Forecasting Carbon Markets

    2. Forecasting Carbon Markets © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 9

  17. Slide 17: Market Demand - Market Supply = Market Scarcity

    Market Demand - Market Supply = Market Scarcity = Market Price* * Does not apply to carbon prices not based on supply and demand © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 10

  18. Slide 18: Modeling Forward Price Curves

    Modeling Forward Price Curves © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 11

  19. Slide 19: Carbon Market Variables

    Carbon Market Variables Context Variables (influencing supply and demand) - Science, media coverage, public opinion, policy anticipation Demand Variables (determining demand for reductions) - Growth, fossil prices, targets, U.S.- D.C. role Supply Variables (determining supply magnitude) - What count

  20. Slide 20: Implications of Fossil Fuel Prices

    Implications of Fossil Fuel Prices Natural Gas Price Typical Project $2.00/MMBtu $4.00/MMBtu $8.00/MMBtu Coal Mine Methane Capture $5.80 $0.70 negative Large-Scale Wind Energy $45.78 $19.11 negative Coal-to-Gas Fuel-Switching* $15.12 $72.44 $187.07 Pulverized Coal CO2 Capture** $52.31 $59.76 $74.64

  21. Slide 21: Implications of Additionality Screening

    Implications of Additionality Screening $140 $120 $100 $80 $/ton CO2 $60 $40 $20 $0 0 1,125 2,250 3,375 4,500 5,625 6,750 7,875 9,000 -$20 -$40 Million Metric Tons of CO2 Low Stringency Moderate Stringency Severe Stringency © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 14

  22. Slide 22: Implications of Market Flexibility

    Implications of Market Flexibility Mitigation Costs for a 500 MW Coal Plant (assum ing 8% discount rate) CCS Source of Offset Projects RE + EE California US International $0 $1,000 $2,000 $3,000 $4,000 NPV of mitigation costs (million) © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide

  23. Slide 23: Methane Supply Curve – WCI

    Methane Supply Curve – WCI © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 16

  24. Slide 24: Methane Supply Curve – U.S.

    Methane Supply Curve – U.S. © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 17

  25. Slide 25: Methane Supply Curve – Global

    Methane Supply Curve – Global © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 18

  26. Slide 26: 3. The Key Forecasting Question

    3. The Key Forecasting Question © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 19

  27. Slide 27: Scenario – Political Stalemate?

    Scenario 1 – Political Stalemate? Major Political and Economic Challenges Challenges Lead to Loss of International and Domestic Policy Momentum The Odds: Low? Notes: - Scenario subject to sudden reversal - Absent a scientific reversal, very hard to see - Odds much lower than previously, but recessio

  28. Slide 28: Policy Stalemate Prices?

    Policy Stalemate Prices? © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 21

  29. Slide 29: Scenario – Political Realism?

    Scenario 2 – Political Realism? Issue is Here to Stay - Numerous policies and measures pursued Will Affect Many Sectors in Material Ways But Don’t Achieve CO2 Stabilization Or Anything Close The Odds: High? Notes: - Scenario subject to sudden “upgrading” - Absent significant political change, almost

  30. Slide 30: Political Realism Prices?

    Political Realism Prices? © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 23

  31. Slide 31: Scenario – Atmospheric Stabilization?

    Scenario 3 – Atmospheric Stabilization? We Develop Political Will to Tackle Climate Change - Aggressive emissions reductions - Aggressive technology development - Aggressive reliance on GHG markets Dramatic Implications for Energy Economy, and Society at Large The Odds: Low? Note: - Scenario less su

  32. Slide 32: Atmospheric Stabilization Prices?

    Atmospheric Stabilization Prices? © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 25

  33. Slide 33: 4. Making Sense of it All

    4. Making Sense of it All © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 26

  34. Slide 34: Conclusions

    Conclusions There Is No “One Size Fits All” Forecast Forecasts Can Take a Number of Forms Companies CAN Develop Forecasts That Are Appropriate to Their Needs, and That Are Very Different From Company to Company Companies Can Do a Lot Better Than Throwing Darts - Underlying supply and demand for redu

  35. Slide 35: Dr. Mark C. Trexler

    Dr. Mark C. Trexler Director, Climate Strategies and Market DNV Climate Change Services North America mark.trexler@dnv.com © Det Norske Veritas AS. All rights reserved 09 April 2009 Slide 28

  36. Slide 36: Generation Technology Options

    Generation Technology Options Ellen Petrill Director, Public/Private Partnerships Integrated Resource Planning Workshop Portland, OR April 10, 2009

  37. Slide 37: The Electric Power Research Institute

    The Electric Power Research Institute RD&D consortium for the electricity industry founded in 1973 • Independent, unbiased, tax-exempt collaborative research organization • $335+ million funding in 2008 • Major offices in Palo Alto, CA; Charlotte, NC and Knoxville, TN • 460 participants in over 40 c

  38. Slide 38: Outline

    Outline • EPRI Prism/MERGE analysis • Technical Assessment Guide introduction • Technologies – Non-CO2 emitting • Nuclear • Renewable – wind, solar, geothermal, ocean – Energy saving technologies • Energy efficiency • Smart grid – Carbon-emitting • Coal with carbon capture and storage • Technology c

  39. Slide 39: EPRI Prism – The Full Portfolio of Technologies

    EPRI Prism – The Full Portfolio of Technologies Aggressively Deployed Can Reduce Electricity CO2 3500 3000 EIA Base Case 2008 CO2 Emissions (million metric tons) 2500 U.S. Electric Sector 2000 Technology EIA 2008 Reference Target 1500 Efficiency Load Growth ~ +1.2%/yr Load Growth ~ +0.75%/yr Renewab

  40. Slide 40: EPRI Technical Assessment Guide (TAG)

    EPRI Technical Assessment Guide (TAG®) Levelized Cost of Electricity Analysis Objective • Provide generic basis for strategic comparison of technology options for base load generation Analytical Basis • Utilize EPRI TAG® capital cost data and methodologies to calculate levelized costs of electricity

  41. Slide 41: Estimates in Constant $ and Current $ are Very Different

    Estimates in Constant $ and Current $ are Very Different Example: New Nuclear Power Plant Source: EPRI Report 1018329, Section 1.8.3 © 2009 Electric Power Research Institute, Inc. All rights reserved. 6

  42. Slide 42: Non-Emitting Generation Technologies

    Non-Emitting Generation Technologies © 2009 Electric Power Research Institute, Inc. All rights reserved. 7

  43. Slide 43: Nuclear Generation Technologies

    Nuclear Generation Technologies: Available Now, 90% Capacity Factor *Westinghouse MHI APWR (1700 MWe) AREVA US EPR (1600 MWe) AP1000 (1115 MWe) *ABWR (1371 MWe) GE ESBWR (1535 MWe) * Design Certified © 2009 Electric Power Research Institute, Inc. All rights reserved. 8

  44. Slide 44: Nuclear Data Range – 2015

    Nuclear Data Range – 2015 Levelized Cost of Electricity, $/MWh All costs are in December 2007 $ 120 110 100 90 80 ($3980/kW) 70 60 50 All calculations for 1400 MW, 90% capacity factor 40 95% confidence level values based on EPRI Report 1018329 Rev. October 2008 30 0 10 20 30 40 50 Cost of CO2, $/Met

  45. Slide 45: Wind Power

    Wind Power • Available now • Intermittent resource • 32.5% capacity factor © 2009 Electric Power Research Institute, Inc. All rights reserved. 10

  46. Slide 46: Wind – 2015

    Wind – 2015 Levelized Cost of Electricity, $/MWh All costs are in December 2007 $ 120 110 100 Wind ($1995/kW, 32.5% Capacity Factor) 90 80 70 60 50 No investment or production tax credits are assumed. 40 95% confidence level values based on EPRI Report 1018329 Rev. October 2008 30 0 10 20 30 40 50 C

  47. Slide 47: Biomass

    Biomass Burlington, VT - 100% Wood Chips • 100% biomass available now • Co-firing – up to 10% typical, available now – Little use in US – Capital cost: $0 - $500/kw – Fuel cost drives LCOE, if more than coal, then LCOE increases – Capacity factor – similar to coal Gadsden, AL - Switch Grass Co-Firin

  48. Slide 48: 100% Biomass – 2015

    100% Biomass – 2015 Levelized Cost of Electricity, $/MWh All costs are in December 2007 $ 120 110 100 Biomass ($2.22/MMBtu, $3235/kW) 90 80 Biomass: 0.10 Metric Tons CO2/MWh 70 X $50/Ton = $5.0/MWh 60 50 No investment or production tax credits are assumed. 40 95% confidence level values based on EPR

  49. Slide 49: Central Station Solar Power Technologies

    Central Station Solar Power Technologies • Photovoltaic • Solar thermal – Concentrating PV (CPV) – Central receiver – Crystalline silicon – Dish/engine – Thin film – Linear Fresnel – Parabolic trough © 2009 Electric Power Research Institute, Inc. All rights reserved. 14

  50. Slide 50: Solar Resource

    Solar Resource Concentrating Solar Thermal (CST): Photovoltaic (PV): Direct Normal Solar Radiation Diffuse Solar Radiation • 530 MW installed worldwide • > 10,000 MW installed worldwide • > 8,000 MW planned by 2013 • > 33,000 MW expected by 2011 Source: NREL © 2009 Electric Power Research Institute,

  51. Slide 51: New Mexico Solar Assessment: Photovoltaic Results

    New Mexico Solar Assessment: Photovoltaic Results • Distributed applications more likely due to modularity • System effects and integration costs need to be better understood before a 50 MW or larger PV project is built June 3, 2004 One day output for Tucson Electric 5 MW Springerville PV Plant, Ari

  52. Slide 52: Wide Range of Cost Results for New Mexico PV

    Wide Range of Cost Results for New Mexico PV 50 MW Baseline PV Plant (IOU ownership) 45 LCOE, ¢/kWh (2009 dollars) 40 35 30 25 20 15 10 5 0 Base Case Stacked Existing (10% ITC) Stacked Existing (30% ITC) Stacked All North Fixed Crystalline South Fixed Crystalline North Tracking Crystalline South Tra

  53. Slide 53: New Mexico Solar Assessment: Solar Thermal Results

    New Mexico Solar Assessment: Solar Thermal Results • Dish/engine technology not available in 2011 due to commitments of leading technology provider • Linear Fresnel is too early in development cycle • Molten salt central receiver technology early in development cycle -- high technical and financial

  54. Slide 54: Wide Range of Costs for New Mexico Parabolic Trough

    Wide Range for Costs for New Mexico Parabolic Trough 125 MW Baseline Trough Plant (dry cooling, no storage, no hybridization, IOU ownership) 30 LCOE, ¢/kWh (2009$) 25 20 North Site 15 South Site 10 5 0 ng in on e: t l 0% ) ac C) % ec e de TC N C % era n Ta y T NM C ke Gu epa % is (10 0% em xem C Al

  55. Slide 55: Solar Thermal Trough Design – 2015

    Solar Thermal Trough Design – 2015 All costs are in Levelized Cost of Electricity, $/MWh December 2007 $ 280 260 240 LCOE range is about $120/MWh to $260/MWh 220 Source: EPRI Report 1014182 200 Average LCOE ~ $175/MWh, 180 Average Total Capital Requirement ~ $4600/kW 160 140 120 95% confidence level

  56. Slide 56: Geothermal Resources in the US

    Geothermal Resources in the US 2004 SMU Heat Flow Assessment © 2009 Electric Power Research Institute, Inc. All rights reserved. 21

  57. Slide 57: Geothermal Energy

    Geothermal Energy • Available now • High development risk • Capacity factor 70 – 90% • Cost of electricity for flash steam (>200C) $ 2008 – 2002 Status: $59.12 – 2030 Goal: $38.21 Source: © 2009 Electric Power Research Institute, Inc. All rights reserved. 22

  58. Slide 58: Wave Energy Conversion: Emerging Technology

    Wave Energy Conversion: Emerging Technology, 30- 40% Capacity Factor Linear Attenuator -- Pelamis Point Absorber-- Ocean Power Technologies Oscillating Water Column -- OceanLinx Overtopping -- Wave Dragon © 2009 Electric Power Research Institute, Inc. All rights reserved. 23

  59. Slide 59: Active Wave Technology Projects in Oregon

    Active Wave Technology Projects in Oregon OSU Northwest National Marine Research Center in Newport, OR OPT Wave Park in Reedsport,OR 1st 150 kW Buoy being built at OIW • EPRI estimates 30 MW by 2015 OPT Wave Energy Park in Coos Bay, OR • EPRI estimates 50 MW by 2018 OWC Wave Plant in Breakwater in D

  60. Slide 60: Economics – Reedsport Oregon Plant

    Economics – Reedsport Oregon 100 MW Plant (constant 2004$ - Regulated Utility – Existing Gov’t Wind Incentives) Wave Low Bound Wave Upper Bound Wind 100.00 Actual Wind COE (cents/kWh) COE History 10.00 Projected Wave Upper and Lower COE 1.00 100 1000 10000 100000 Installed Capacity (MW) EPRI Reports

  61. Slide 61: Energy Saving Technologies

    Energy Saving Technologies © 2009 Electric Power Research Institute, Inc. All rights reserved. 26

  62. Slide 62: EPRI’s National Energy Efficiency Potential Study

    EPRI’s National Energy Efficiency Potential Study 7,000 Average Avoided Growth Rate 6,500 Growth Electricity Reduction Rate Consumption from AEO 2030[1] 6,000 Reference[1] 2.5% Codes and ~ Realistic te Standards Achievable 0.8% 5% 22% Ra th Energy (Billion kWh) 5,500 Potential row G Maximum Market-d

  63. Slide 63: Opportunities for Energy Efficiency Savings

    Opportunities for Energy Efficiency Savings Top 10 Energy Efficiency Achievable Potentials Includes . . . Commercial Lighting Industrial 1-5 hp motors Residential Color TV Residential Programmable Thermostat Commercial Central AC Residential Lighting Commercial Monitors 2030 Commercial Personal Comp

  64. Slide 64: Opportunities for Energy Efficiency Savings

    Opportunities for Energy Efficiency Savings Commercial Lighting Commercial Other West Residential Electronics Industrial Machine Drive Commercial Cooling Commercial Lighting Industrial Machine Drive South Residential Electronics Residential Cooling Commercial Cooling Commercial Lighting Industrial M

  65. Slide 65: Energy Efficiency Potential in Historical Context

    Energy Efficiency Potential in Historical Context © 2009 Electric Power Research Institute, Inc. All rights reserved. 30

  66. Slide 66: The Smart Grid: Enables Dynamic Energy Management

    The Smart Grid: Enables Dynamic Energy Management and “Prices to Devices” Efficient Building Systems Utility Communications Internet Renewables PV Consumer Portal & Building EMS Advanced Distribution Metering Control Dynamic Operations Interface Systems Control Plug-In Hybrids Smart Distributed End-

  67. Slide 67: Smart Grid = Green Grid

    Smart Grid = Green Grid Enables energy savings mechanisms: • Continuous commissioning of buildings • Reduced T&D line losses • Direct feedback for customers • More effective, reliable demand response • Enhanced measurement and verification capabilities EPRI analysis shows potential reduction of 1.2

  68. Slide 68: Carbon Control Technologies

    Carbon Control Technologies © 2009 Electric Power Research Institute, Inc. All rights reserved. 33

  69. Slide 69: Coal with CO2 Capture and Sequestration (CCS)

    Coal with CO2 Capture and Sequestration (CCS) Pulverized Coal with CCS Integrated Gasification Combined Cycle (IGCC) with CCS © 2009 Electric Power Research Institute, Inc. All rights reserved. 34

  70. Slide 70: Pulverized Coal With CO2 Capture – New or Retrofit

    Pulverized Coal With CO2 Capture – New or Retrofit CO2 to use or Fresh Water Sequestration Coal PC CO2 SCR ESP FGD Removal Flue Gas Air Boiler CO2 to Cleanup e.g., MEA to Stack and Compression Cleaned Flue Gas Steam Fly Ash Gypsum/Waste to Atmosphere Turbine CO2 Stripper Absorber Tower Flue Gas from

  71. Slide 71: IGCC Without and With CO2 Removal

    IGCC Without and With CO2 Removal Sulfur IGCC without CO2 Capture Coal Gas CC Air ASU Gasifier Clean Power POWER O2 Up Block Slag IGCC with CO2 Capture Sulfur CO2 Coal Gas CC Air ASU Gasifier Shift Power POWER Clean O2 Block Up H2 Slag Needs demonstration at large scale, not available until after 20

  72. Slide 72: Cost Estimates for PC and IGCC, New and Retrofit

    Cost Estimates for PC and IGCC, New and Retrofit Illinois #6 Bituminous PRB ( Western Coal)) 130 No Capture • COE Includes $10/tonne for CO2 Transportation and Sequestration 120 Retrofit Capture 30-Yr levelized COE, $/MWh (constant 2006$) New Capture • IGCC & CCS include 10% TPC contingency for firs

  73. Slide 73: CO2 Capture and Sequestration Projects in Progress

    CO2 Capture and Sequestration Projects in Progress To Achieve 2020 Goal 20052007 2010 2010 2015 2015 2020 2025 2020 Pilots Chilled Ammonia Pilot ~2 MW CCS Other Pilots (Post-Combustion and Oxy-Combustion) Demonstration Ion Transport Membrane O2 Scale-up ~20 MW CCS AEP Mountaineer Southern/SSEB Ph. I

  74. Slide 74: NEW: Post-Combustion CO2 Retrofit Study

    NEW: Post-Combustion CO2 Retrofit Study • Investigate thermal and economic impact of retrofitting CO2 capture process to an existing PC plant. – Assess practical configuration based on site – Determine required space, interfaces with plant – Estimate performance and costs • Five host sites covering

  75. Slide 75: Coal Combustion and Gasification Comparison – 2015

    Coal Combustion and Gasification Comparison – 2015 Levelized Cost of Electricity, $/MWh All costs are in December 2007 $ 120 110 100 IGCC ($2900/kW) 90 PC ($2450/kW) 80 70 60 50 40 95% confidence level values based on EPRI Report 1018329 Rev. October 2008 30 0 10 20 30 40 50 Cost of CO2, $/Metric To

  76. Slide 76: Impact of CO2 Removal on Levelized Cost of Electricity

    Impact of CO2 Removal and Cost and Performance Improvements on Levelized Cost of Electricity Levelized Cost of Electricity, $/MWh All costs are in December 2007 $ 120 IGCC ($4000/kW, + CO2 capture, 2025) PC ($4100/kW, + CO2 capture, 2025) 110 100 90 80 PC ($3400/kW, with CO2 capture, 70 with cost an

  77. Slide 77: Technology Comparisons

    Technology Comparisons © 2009 Electric Power Research Institute, Inc. All rights reserved. 42

  78. Slide 78: Representative Cost and Performance of Power Generation Technologies (2015)

    Representative Cost and Performance of Power Generation Technologies (2015) Capital Levelized Cost Cost of CO2 All Costs in Capacity Efficiency (Dec. Electricity Emissions Constant Factor Sources/Assumptions (%) 2007 (Dec. 2007 (Metric Dec. 2007$ (%) $/kW) Constant Tons/MWh) TCR* $/MWh) Plant size =

  79. Slide 79: Comparative Levelized Costs of Electricity – 2015

    Comparative Levelized Costs of Electricity – 2015 Levelized Cost of Electricity, $/MWh All costs are in December 2007 $ 120 Biomass IGCC NGCC ($10/MMBtu) 110 Wind (32.5% Capacity Factor) 100 90 80 NGCC ($8/MMBtu) 70 Nuclear PC 60 50 No investment or production tax credits are assumed for wind or bio

  80. Slide 80: Representative Cost and Performance of Power Generation Technologies (2025)

    Representative Cost and Performance of Power Generation Technologies (2025) Capital Levelized Cost Capaci Cost CO2 of Electricity All Costs in Constant Efficien ty (Dec. Emissions (Dec. 2007 Sources/Assumptions Dec. 2007$ cy (%) Factor 2007 (Metric Constant (%) $/kW) Tons/MWh) $/MWh) TCR* Nuclear- E

  81. Slide 81: Comparative Levelized Costs of Electricity – 2025

    Comparative Levelized Costs of Electricity – 2025 Levelized Cost of Electricity, $/MWh All costs are in December 2007 $ 120 No investment or production tax credits are assumed for wind or biomass. 110 Solar thermal LCOE ranges between $120-$260/MWh (see earlier slide). 100 IGCC Biomass PC 90 80 70 6

  82. Slide 82: Conclusions

    Conclusions • Technology choices depend on needs and drivers of region, utility, sites • Costs and performance are site specific • Non-emitting or low carbon baseload choices available today: – Nuclear – Geothermal – Biomass • Non-emitting intermittent choices: Wind, solar PV and trough • Emerging n

  83. Slide 83: Together…Shaping the Future of Electricity

    Together…Shaping the Future of Electricity © 2009 Electric Power Research Institute, Inc. All rights reserved. 48

  84. Slide 84: Appendix

    Appendix © 2009 Electric Power Research Institute, Inc. All rights reserved. 49

  85. Slide 85: Resources

    Resources • Program on Technology Innovation: Integrated Technology Options, EPRI, Palo Alto, CA: 2008. 1018329. Available to everyone at no charge. • Renewable Energy Technical Assessment Guide—TAG-RE: 2008. EPRI, Palo Alto, CA: 2008. 1015801. Available to funders. • EPRI Reports on ocean energy av

  86. Slide 86: Levelized Cost of Electricity Analysis

    Levelized Cost of Electricity Analysis Analytical Basis • The weighted cost of capital on a constant dollar basis, after tax, is 5.5%, and a 30 year plant life with 15 year accelerated depreciation was used. • Mercury, SOX/H2S and NOX removal are included in PC and IGCC Technologies. NOX removal is

  87. Slide 87: Levelized Cost of Electricity Analysis

    Levelized Cost of Electricity Analysis Capital Cost Estimating Approach • Costs are to be reported in reference year (December 2007) dollars: – No cost escalation to startup date included. • Plant site is assumed to be clear and level. • Cost estimate assumes mature technology: – Plant is assumed to

  88. Slide 88: Levelized Cost of Electricity Analysis

    Levelized Cost of Electricity Analysis Cost Basis • Total Plant Cost (TPC): – All process and support facilities; fuel handling and storage; water intake structure and wastewater treatment; offices, maintenance shops, and warehouses; step-up transformer and transmission tie-in – Sometimes referred t

  89. Slide 89: Levelized Cost of Electricity Analysis

    Levelized Cost of Electricity Analysis Capital Cost Estimate Summary • Total Capital Requirement (TCR) = TPC + Owner’s Costs+ Project Specific Costs + AFUDC – AFUDC: Allowance For Funds Used During Construction; also known as IDC (Interest During Construction) – TCR also known as “All-In” Costs • To

  90. Slide 90: Integrated Resource Plan 2009: Climate Policy Context

    Integrated Resource Plan 2009 Climate Policy Context For Resource Planning April 10, 2009

  91. Slide 91: Policy Drivers: UN IPCC Findings on Science

    Policy Drivers: UN IPCC Findings on Science • IPCC Fourth Assessment Report (2007) – Trends in temperature rise, impacts, and emissions – Focused on atmospheric concentrations of C02, CH4, N20 • Delayed emission reductions significantly constrain opportunities to achieve lower stabilization levels a

  92. Slide 92: Policy Drivers: International Developments

    Policy Drivers: International Developments • Kyoto Expires in 2012 • Copenhagen 2009 will focus on adoption of a new agreement • Bonn Meetings will set the stage • The U.S. has announced its intention to negotiate 3

  93. Slide 93: Policy Drivers: State, Regional & Agency Developments

    Policy Drivers: State, Regional & Agency Developments State and regional programs have been moving ahead of Congress. EPA is also moving on a separate track Scenarios: • State and regional efforts continue to develop • EPA moves forward with a GHG regulatory program in response to: – Massachusetts v

  94. Slide 94: Overview: Federal Proposals

    Overview: Federal Proposals U.S. Congress • Proposals in 110th Congress • Expectations for the 111th Congress EPA • Endangerment Finding • Proposal to Regulate GHGs 5

  95. Slide 95: Proposed Legislation – 110th Congress

    Proposed Legislation – 110th Congress Key Elements of proposed bills are summarized in a separate handout Our CO2 modeling utilizes EIA analysis of 3 legislative proposals: – Bingaman-Specter – McCain-Lieberman – Lieberman-Warner 6

  96. Slide 96: Expectations For The 111th Congress

    Expectations For The 111th Congress Political Outlook in House and Senate: • Administration Budget (auction proposal) • Focus on cap & trade, but other approaches are in the mix (carbon tax, “cap and dividend”) • House: Action begins here with Waxman-Markey and related bills – Committee dynamics – p

  97. Slide 97: Cap & Trade: Key Design Features

    Cap & Trade: Key Design Features • Timing – Start Date • Emissions Cap / Reduction Glide Path • Coverage – Pollutants & Sectors • Point of Regulation • Allowances: – Percent auctioned v. allocated – Who gets them if allocated ? (generator or load serving entity) – What is the allocation methodology?

  98. Slide 98: Cap & Trade Design: Start Date

    Cap & Trade Design: Start Date Recent Proposals: • 2012 – Boxer-Lieberman-Warner – Waxman-Markey – Administration Budget: First Auction How Will Economic Conditions and Political Issues Affect Timing? 9

  99. Slide 99: Cap & Trade Design: Targets

    Cap & Trade Design: Targets 2012 2020 2050 Bingaman- 1990 levels in 2030; Specter 2012 levels 2006 levels 2050 - TBD McCain- 20% below 1990 in Lieberman 2004 levels 1990 levels 2030; 60% in 2050 36% below 2006 in Lieberman- Warner 7% below 2006 2030; 72% below in 2050 Boxer- 71% below 2005 in Lieber

  100. Slide 100: Comparison of Reduction Targets

    Comparison of Reduction Targets 11

  101. Slide 101: Cap & Trade Design: Pollutants

    Cap & Trade Design: Pollutants • 6 major greenhouse gases expressed as CO2-equivalents: – Carbon Dioxide - C02* – Methane - CH4* – Nitrous Oxide - N20* – Hydrofluorocarbons - HFC – Perfluorocarbon - PFC – Sulfur Hexaflouride - SF6 • Recent Bills Add: – Nitrogen Trifluoride * currently reported by PG

  102. Slide 102: Cap & Trade Design: Sectors & Point of Regulation

    Cap & Trade Design: Sectors & Point of Regulation Legislation Covered Sectors Point of Regulation Bingaman- Economy-wide Hybrid: upstream – gas/petroleum; downstream – Specter ~ 88 % emissions covered coal McCain- Economy-wide Hybrid: upstream – transportation; downstream – Lieberman ~ 87 % emission

  103. Slide 103: Cap & Trade Design: Allowances

    Cap & Trade Design: Allowances • Amount auctioned vs. allocated at no cost – Mix of approaches ranging from 100% auction (Obama budget) to less than 25% auctioned (Bingaman) – Most proposals take a hybrid approach combining auctions with free allocations reduced over time on a sliding scale – For th

  104. Slide 104: Cap & Trade Design: Cost Constraining Mechanisms

    Cap & Trade Design: Cost Constraining Mechanisms • Price Collar • Banking and Borrowing • Offsets & International Allowances 15

  105. Slide 105: Cap & Trade Design: Price Collar

    Cap & Trade Design: Price Collar Price Collar = Ceiling and Floor on CO2 Price • Bingaman only proposal with firm “safety valve” price ($12 per ton with adjustments going forward at 5% above rate of inflation) – Bingaman safety valve is ceiling only • Issue still in play, but the outcome is uncertai

  106. Slide 106: Cap & Trade Design: Banking & Borrowing

    Cap & Trade Design: Banking & Borrowing Mix of Design Approaches • Consensus on banking concept • Borrowing design may include: – Conditions under which borrowing may occur – Limits on the percentage of borrowed allowances for meeting compliance obligation – Repayment terms 17

  107. Slide 107: Cap & Trade Design: Offsets & International Allowances

    Cap & Trade Design: Offsets & International Allowances Offsets - Potential Design Elements • Range of approaches from 15% - 30% of compliance obligation from domestic or international sources (subject to approval) • Waxman-Markey – 2 billion credit limit per year split evenly between domestic and fo

  108. Slide 108: Cap & Trade Design: Revenue Use

    Cap & Trade Design: Revenue Use • Technology Incentives – Carbon Capture & Sequestration: allowance incentives and revenue recycling for CCS projects – Rep. Boucher “wires charge” to create fund for early deployment of commercial scale CCS projects • Incorporated into Waxman-Markey • Moderate & Low

  109. Slide 109: Cap & Trade Design: Interaction of Federal, State & Regional Programs

    Cap & Trade Design: Interaction of Federal, State & Regional Programs • Pre-emption? – Concern with the potential for multiple federal-state-regional programs that would limit GHGs – Waxman-Markey would suspend state/regional cap and trade programs from 2012 - 2017 • Other Approaches To Reconcile Fe

  110. Slide 110: Carbon Tax

    Carbon Tax • Carbon Tax as an Alternative Lurking in the Background • Features of Proposals – Carbon tax based on the carbon or CO2 content of primary fossil fuels – Imposed on any taxable fuel—coal (including lignite and peat), petroleum and any petroleum product, and natural gas—which is extracted

  111. Slide 111: EPA Action On Climate

    EPA Action On Climate • GHG Reporting • Endangerment Finding as Basis To Regulate: early to mid-April • Alternative Regulatory Scenarios For EPA – Regulation of GHGs under the Clean Air Act – Waxman-Markey would limit applicability of CAA to GHGs • Source-Specific Developments (Bonanza, Desert Rock,

  112. Slide 112: Oregon Climate Goals

    Oregon Climate Goals HB 3543 – • SECTION 2. (1) The Legislative Assembly declares that it is the policy of this state to reduce greenhouse gas emissions in Oregon pursuant to the following greenhouse gas emissions reduction goals: – (a) By 2010, arrest the growth of Oregon’s greenhouse gas emissions

  113. Slide 113: State Legislation

    State Legislation • SB 80 – Governor’s Package: – Cap and trade plus others • “Cap Only” Alternatives • SB 101 – Emission Performance Standard • Relationship to Regional Initiatives: – West Coast, Western Climate Initiative 24

  114. Slide 114: Regional Initiatives

    Regional Initiatives RGGI currently only program active and enforceable across a region Source: PEW Center on Global Climate Change 25

  115. Slide 115: Regional Initiatives: WCI

    Regional Initiatives: WCI Partners: 7 States & 4 Provinces Observers: 6 U.S. States, 1 Province & 6 Mexican States 26

  116. Slide 116: Regional Initiatives: WCI

    Regional Initiatives: WCI WCI Goal: 15% below 2005 levels by 2020 – Melding of different individual jurisdiction goals Short-term (2010-12) Medium-term (2020) Long-term (2040-50) WCI Not Established 15% below 2005 level Not Established Arizona Not Established 2000 level 50% below 2000 by 2040 Britis

  117. Slide 117: Regional Initiatives: WCI

    Regional Initiatives: WCI Program Design • Cap and Trade – Different jurisdictional goals/targets persist under this proposal – Emissions reporting to begin in 2011 – Phased coverage of 5 sectors • Jan 2012: electricity and industrial • Jan 2015: transportation, residential natural gas, commercial a

  118. Slide 118: Summary & Key Observations

    Summary & Key Observations • Public Policy Outcomes Affect Future Resource Decisions • Climate Policy Is a Moving Target • Important Issues Hang in the Balance – Timing – Approach: cap and trade, carbon tax – Sectors covered and point of regulation – Treatment of allowances: auction v. free allocati

  119. Slide 119: Integrated Resource Plan 2009: CO2 Research & Assumptions for IRP

    Integrated Resource Plan 2009 CO2 Research & Assumptions for IRP April 10, 2009

  120. Slide 120: Agenda

    Agenda • Analytical Approach for CO2 Base Case Price and Sensitivities – EIA studies used as a foundation for assessing range and base assumption – EIA engaged by Congress to study 3 proposed bills: • S280 (Lieberman/McCain) • S1766 (Bingaman/Specter) • S2191 (Lieberman/Warner) • Composite Method fo

  121. Slide 121: CO2 Approach: Proposed Base Scenario for IRP

    CO2 Approach: Proposed Base Scenario for IRP CO2 base price developed as a composite of results from EIA legislative case studies – Equally weighted 3 legislative proposals • Excluded 1 case from Lieberman/Warner study • “Limited Alternative and No International Offsets” – Price shape based on EIA r

  122. Slide 122: Lieberman-Warner: (EIA Assumptions)

    Lieberman-Warner: (EIA Assumptions) Reference Case (Non-Policy Case): – Assumes a continuance of current laws and regulation – Non-CO2 emissions growth based on EPA “with measures” and “voluntary technology adoption” cases Core Case (Policy Case): – Reference Case assumptions – 2012 implementation o

  123. Slide 123: Lieberman-Warner - continued: (EIA Assumptions)

    Lieberman-Warner - continued: (EIA Assumptions) High Cost Case: – Core Case – Plus CCS, nuclear and biomass plants cost 50% more Limited Alternatives Case: – Core Case – CCS not available until 2030 – Nuclear and biomass power plant additions limited to reference case levels – LNG import limited to

  124. Slide 124: Lieberman-McCain: (EIA Assumptions)

    Lieberman-McCain: (EIA Assumptions) Reference Case (Non-Policy Case): – Assumes a continuance of current laws and regulation – Non-CO2 emissions growth based on EPA “no measures” and “no voluntary technology adoption” cases Core Case (Policy Case): – Reference Case assumptions – Allowance auction sh

  125. Slide 125: Lieberman-McCain - continued: (EIA Assumptions)

    Lieberman-McCain - continued: (EIA Assumptions) Fixed 30 Percent Offsets: – Offsets meet a fixed, 30 percent share of allowances – Offset price equal to allowance price – International offsets meet balance of 30 percent not met by US sources Unlimited Offsets: – No limit on use of offsets to meet al

  126. Slide 126: Bingaman: (EIA Assumptions)

    Bingaman: (EIA Assumptions) Reference Case (Non-Policy Case): – Assumes a continuance of current laws and regulation – Non-CO2 emissions growth based on EPA “no measures” and “no voluntary technology adoption” cases Core Case (Policy Case): – Reference Case assumptions – Cap and trade policy – TAP*

  127. Slide 127: Bingaman - continued: (EIA Assumptions)

    Bingaman - continued: (EIA Assumptions) Limited Alternatives Case: – Core Case – CCS not available until 2030 – Nuclear and biomass power plant additions limited to reference case levels – LNG import limited to reference case level High Technology with RPS: – High Technology Case – 15 percent RPS by

  128. Slide 128: EIA Case Study Results

    EIA Case Study Results Lieberman Lieberman Bingaman Warner (2191) McCain (280) Specter (1766) Policy Case $ 38.48 $ 29.77 $ 16.96 Limited Alt $ 57.99 $ 38.11 $ 17.32 Limited Alt w/ CCS $ 33.09 Without Int $ 37.62 Limited Alt w/out International $ 103.56 Limited Gas Supply $ 38.56 High Auction $ 30.0

  129. Slide 129: EIA Case Study Results

    EIA Case Study Results $450 Lieberman – Warner: $400 Limited Alternative / No-international Case Excluded $350 $300 RL ($2009) Lieberman Warner (2191) $ 48.62 $250 Lieberman McCain (280) $ 29.62 Bingaman Specter (1766) $ 16.73 $200 Average $ 31.66 $150 $100 $50 $- 2005 2010 2015 2020 2025 2030 2035

  130. Slide 130: Proposed IRP CO2 Scenarios

    Proposed IRP CO2 Scenarios • No CO2 Tax • Low Case: $12 • Medium Low Case: $20 • Base Case: $32 – Composite price based on EIA analysis • Medium High Case: $45 • High Case: $65 All Prices Real Levelized 2009 $ 12

  131. Slide 131: Proposed IRP CO2 Scenarios

    Proposed IRP CO2 Scenarios $300.00 $12 $250.00 $20 $32 $45 $200.00 $65 $150.00 $100.00 $50.00 $- 2008 2013 2018 2023 2028 2033 2038 Nominal $ 13

  132. Slide 132: Natural Gas / CO2 Price Relationship

    Natural Gas / CO2 Price Relationship Is There a Discernable Relationship Between CO2 and Fuel Price Levels? Approach – PIRA research – Evaluation of fuel and CO2 price changes under various EIA case studies Current Findings – Insufficient evidence to demonstrate significant positive correlation – Ho

  133. Slide 133: Lieberman-Warner (EIA Results): Fuel – CO2 Price Observations

    Lieberman-Warner (EIA Results): Fuel – CO2 Price Observations Gas $/mmbtu Credit $/mmbtu Coal $/mmbtu Reference Case Core Case High Cost Limited Alternative Limited + No Int Real Levelized 2009 $ / mmBtu 15

  134. Slide 134: Lieberman-Warner (EIA Results): Natural Gas Price

    Lieberman-Warner (EIA Results): Natural Gas Price 9.00 Reference _Case 8.50 High_Cost_Case 8.00 Core_Case Limited_Alternative 7.50 Limited_Alternative_No_International 7.00 6.50 6.00 5.50 5.00 2005 2009 2013 2017 2021 2025 2029 • Upon implementation of the S2191 act, gas prices decrease due to the p

  135. Slide 135: Lieberman-Warner (EIA Results): Allowances

    Lieberman-Warner (EIA Results): Allowances 250.00 Core_Case High_Cost_Case 200.00 Limited_Alternative Limited_Alternative_No_International 150.00 100.00 50.00 0.00 2005 2009 2013 2017 2021 2025 2029 • Prices are nominal $ / Metric Ton • Real Levelized cost in 2008 $ 17

  136. Slide 136: Gas - CO2 Relationship

    Gas - CO2 Relationship Our research indicates that natural gas and CO2 prices demonstrate only a modest positive relationship – Abundant supplies at modestly higher extraction costs (mitigates upward price pressure from CO2) • Unconventional North American supplies expected to be significant and eco

  137. Slide 137: Key Points & Observations

    Key Points & Observations • Future CO2 Price is Uncertain and Dependant on: – Legislative Policy – U.S. / Global Response to Policy • Economic Growth • International Coordination of GHG / Energy Policy – Technology Development and Adoption – Supply Curve for GHG Abatement / Mitigation • Cost • Achie

  138. Slide 138: Boardman Power Plant

    Boardman Power Plant 1 © 2008 Portland General Electric. All Rights Reserved.

  139. Slide 139: Boardman Plant Basics

    Boardman Plant Basics • 585 Megawatts capacity. PGE owns 65 percent • PGE Share = 380 MWa • PGE’s share of the plant’s output provides enough power for more than 250,000 homes • About 15 percent of PGE’s resource mix • Key element of PGE’s diverse portfolio • One-half to two-thirds cheaper to operat

  140. Slide 140: US Coal Fleet Heat Rate

    US Coal Fleet Heat Rate (2000-07 Avg, SNL Financial Database) 50,000 45,000 Boardman Colstrip Centralia 40,000 MMBTU / MWH 35,000 30,000 25,000 20,000 15,000 10,000 5,000 1 30 59 88 117 146 175 204 233 262 291 320 349 378 407 436 # of Plants 3

  141. Slide 141: US Coal Fleet Dispatch Cost

    US Coal Fleet Dispatch Cost (2000-07 Avg, SNL Financial Database) $90 $80 $70 Dispatch Cost per MWh $60 Colstrip Boardman Centralia $50 $40 $30 $20 $10 $0 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 Cumulativ e Coal Fle e t Capacity (M W) 4

  142. Slide 142: Boardman CO2 Mitigation: Current and Potential Opportunities

    Boardman CO2 Mitigation: Current and Potential Opportunities Current CCS Initiatives • Biological Sequestration: Algae Project • Pilot Project Completed 2008 • Larger Project under consideration with Stimulus funding, 2010-2011 period Potential Future CCS Opportunities • Geological Sequestration: Bi

  143. Slide 143: Boardman Algae Project

    Boardman Algae Project CO2 capture in open ponds requires large land mass Algae growth ± CO2 1.2 Photo Bio Reactors offer lower land 1 mass and more efficient close loop 0.8 capture systems 0.6 Algae can capture and sequester 0.4 CO2. It also absorbs as nutrients, 0.2 NOx in the flue gases 0 1 2 3 4

  144. Slide 144: Boardman Algae Project

    Boardman Algae Project Integration of Algae-Based CO, Capture with Coal-Fired Power Plant treated —> water cooling water { holding pond E i ad Se tte iS ma fertilizer enclosed algal >» Gtbon-ich algal te (NP) o = : tune biomass (lipids) algal biodiese! residual processing solid biodiese!

  145. Slide 145: Oregon Regional Haze Plan

    Oregon Regional Haze Plan Boardman RH BART 8 © 2008 Portland General Electric. All Rights Reserved.

  146. Slide 146: Boardman Emissions Control Process

    Boardman Emissions Control Process • DEQ/EPA rulemaking • Draft Rule proposal - December 2008 • EQC Decision expected – June 2009 • Expected EPA approval of SIP – April 2010 • Engineering, procurement and construction • 2009 - 2017 9

  147. Slide 147: PGE Position on Regional Haze

    PGE Position on Regional Haze Boardman Control Upgrades for Regional Haze BART: • Low NOX Burners and Over-fire Air Ports • Reduces NOx • Installation by July, 2011 • Dry Scrubber and Bag-house • Reduces SO2 and Particulate Matter • Installation by July, 2014 Reasonable Progress: • SCR (Selective Ca

  148. Slide 148: DEQ Proposal for Regional Haze / BART

    DEQ Proposal for Regional Haze / BART Boardman Control Upgrades for Regional Haze BART: • Low NOX Burners and Over-fire Air Ports • Reduces NOx • Installation by July, 2011 • Dry Scrubber and Bag-house • Reduces SO2 and Particulate Matter • Installation by July, 2014 Reasonable Progress: • SCR (Sele

  149. Slide 149: PGE Comments to DEQ

    PGE Comments to DEQ • PGE requested alternative BART and Reasonable Progress determinations based on specific shutdown dates Each alternative meets BART and Reasonable Progress requirements • Life of plant is statutory criterion for BART and Reasonable Progress determinations • With shortened plant

  150. Slide 150: Decision Point Proposal

    Decision Point Proposal PGE Alternative Boardman BART/Reasonable Progress Proposal Control Operate Operate Mercury through 2020 through 2029 No No Yes Yes Operate 2011 2012 2014 2015 2017 Full Plant Life Decision Decision Point Point On SO2 On SCR** Controls Install LNB/OFA Install SO2 & mercury Con

  151. Slide 151: Factors Affecting Control Decisions

    Factors Affecting Control Decisions • Carbon regulation – state and federal • Carbon capture & sequestration technology • Alternative generation technologies • Fuel diversity & costs – natural gas, coal • SO2 and NOX control technologies • Coordination of multiple schedules 14

  152. Slide 152: No Aggregate Emissions Increase

    No Aggregate Emissions Increase Aggregate Emission Comparison 1,000,000 900,000 862,793 800,000 700,000 600,000 Total Tons PM 500,000 SO2 NOx 400,000 300,000 232,453 231,292 237,149 200,000 100,000 - 2040, Existing Controls 2020, LNB/OFA 2029, LNB/OFA/SD 2040, LNB/OFA/SD/SCR Decision Points 15

  153. Slide 153: Summary of PGE Decision Point Proposal

    Summary of PGE Decision Point Proposal • Require NOx BART by 2011 • Establish two SO2 BART determinations 1. SO2 scrubber in 2014 and no plant closure requirement 2. Closure by end of 2020 with no additional SO2 controls PGE required to submit permit application requesting closure no later than July

  154. Slide 154: Proposed Changes

    Proposed Changes • The decision point dates are based on cost effectiveness of controls (under BART criteria) and emissions reductions. • 2012 decision point to Install SO2 controls or cease operating Boardman in 2020. • 2015 decision point to install SCR or cease operations in 2029. • Installation

  155. Slide 155: Boardman

    Boardman 18

  156. Slide 156: Integrated Resource Plan 2009: Boardman Analysis

    Integrated Resource Plan 2009 Boardman Analysis April 10, 2009

  157. Slide 157: Modeling Approach

    Modeling Approach Basic Modeling Parameters: – Net Present Value of Revenue Requirements • Fully Allocated Cost of Boardman vs Market Alternative – Gains = avoided customer costs – Losses = additional customer costs • Results Reflect PGE Interest in Boardman Plant – Scenarios and Futures Included: •

  158. Slide 158: Key Assumptions & Model Inputs

    Key Assumptions & Model Inputs • Fuel Price Forecasts: – Natural gas prices based on combination of forward market prices and PIRA fundamental forecast – Coal price forecast is average of EIA and PIRA • Market Price for Electricity is Composite: – Forward electric prices through 2011 – Market price

  159. Slide 159: Key Assumptions & Model Inputs

    Key Assumptions & Model Inputs Carbon Price Modeling: • 6 Carbon Price Futures – $0, $12, $20, $32, $45 and $65 / short-ton – $32 / short-ton = “Base Case” CO2 Assumption – Real, levelized 2009$ • CO2 modeled on both 2012 and 2013 start • Assumed 100% of CO2 allowances are auctioned (no free allowan

  160. Slide 160: BART and Reasonable Progress Timeline

    BART and Reasonable Progress Timeline BART I BART II Control Operate Operate Mercury through 2020 through 2029 Reasonable Progress No No Yes Yes Operate 2011 2012 2014 2015 2017 Full Plant Life Decision Decision Point Point On SO2 On SCR** Controls Install SO2 & mercury Controls Install SCR Install

  161. Slide 161: Boardman Emissions Controls Capex

    Boardman Emissions Controls Capex $160 $700 Cumulative Total $140 LNB/OFA $600 $120 Hg/FGD SCR $500 $100 $400 $80 $300 $60 $200 $40 $20 $100 $- $- 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 $500 $450 LNB Hg SCR Total in million$ /OFA /FGD $400 Overnight Capex $ 36 $ 341 $ 210 $ 587 $350

  162. Slide 162: Boardman BART Scenarios

    Boardman BART Scenarios • DEQ Proposal for BART + Reasonable Progress – Low NOx Burners and Over-fired Air by July, 2011 – Dry Scrubbers and Bag-house by July, 2014 – SCR by July, 2017 • Plant operations modeled through 2040 • PGE Boardman Regional Haze / BART Position * – Low NOx Burners and Over-f

  163. Slide 163: DEQ proposal: BART + Reasonable Progress

    DEQ proposal: BART + Reasonable Progress NPV (millions of 2009$) Hg, BART I & II + Reasonable Progress: Operate through 2040 2012 CO2 Policy Implementation 2013 CO2 Policy Implementation CO2 Tax in 09$/S Ton 2011 2040 Delta 2011 2040 Delta No CO2 Tax $ (58) $ 605 $ 663 $ (58) $ 605 $ 663 $12.00 (Low

  164. Slide 164: PGE Boardman Regional Haze / BART Position

    PGE Boardman Regional Haze / BART Position NPV (millions of 2009$) Hg + BART I & II only: Operate through 2040 2012 CO2 Policy Implementation 2013 CO2 Policy Implementation CO2 Tax in 09$/S Ton 2011 2040 Delta 2011 2020 Delta No CO2 Tax $ (58) $ 717 $ 775 $ (58) $ 717 $ 775 $12.00 (Low Case) $ (58)

  165. Slide 165: Decision Point Proposal for BART + Reasonable Progress

    Decision Point Proposal for BART + Reasonable Progress Hg + BART I & II: LNB/OFA, 2012 start for CO2 NPV Hg + BART I: LNB/OFA, Mercury - Hg + BART I & II + Reasonable Mercury, Scrubber - Operate (millions of 2009$) Operate through 2020 Progress: Operate through 2040 through 2029 CO2 Tax in 09$/S Ton

  166. Slide 166: Decision Points Proposal: Matrix of Sensitivity Results

    Decision Points Proposal for BART + Reasonable Progress (Matrix of Sensitivity Results)* Operate thru 2020 CO2 Level for 2012 Policy start CO2 Level for 2013 Policy start Gas input Coal input $ - $ 12 $ 20 $ 32 $ 45 $ 65 $ - $ 12 $ 20 $ 32 $ 45 $ 65 Ref_Gas Ref_Coal 586 511 461 386 304 184 586 527 4

  167. Slide 167: Frequency of Max NPV: Across Decision Point Cases

    Frequency of Max NPV: Across Decision Point Cases* CO2 Level for 2012 Policy start CO2 Level for 2013 Policy start Gas input Coal input $ - $ 12 $ 20 $ 32 $ 45 $ 65 $ - $ 12 $ 20 $ 32 $ 45 $ 65 Ref_Gas Ref_Coal 2040 2020 2020 2020 2020 2020 2040 2020 2020 2020 2020 2020 Ref_Gas Low_Coal 2040 2040 20

  168. Slide 168: Gas Price Sensitivity: High Case

    Gas Price Sensitivity: High Case 800 Reference Gas NPV When modeled with 600 reference gas price 400 forecast: NPV (million$) 200 •2020 decision point has highest NPV for - 5 of the 6 assumed (200) CO2 levels 2020_Ref 2029_Ref 2040_Ref •2020 decision point (400) is positive for all (600) assumed CO2

  169. Slide 169: Gas Price Sensitivity: Low Case

    Gas Price Sensitivity: Low Case 800 When modeled with Reference Gas NPV reference gas price 600 forecast: 400 •2020 decision point NPV (million$) is highest NPV for 5 200 of the 6 assumed - CO2 levels •2020 decision point (200) is positive for all 2020_Ref 2029_Ref 2040_Ref (400) assumed CO2 levels

  170. Slide 170: Range of Uncertainty

    Range of Uncertainty 2020 $1,400 $1,242 $1,431 2029 Starting NPV (2012 2040 CO2 Start w/ Base CO2 Price and Ref Gas) $857 $900 $386 $442 $429 $153 $319 $325 $400 $155 $208 $167 $(30) $(100) $(10) $(67) $(310) $(312) $(594) $(600) Low_Coal High_Coal Low_Gas High_Gas 2013 Start • Side by side comparis

  171. Slide 171: Range of Uncertainty: 2020 Decision Point

    Range of Uncertainty: 2020 Decision Point 2020 Decision Point 2013 Start $83 Starting NPV is 2012 CO2 Start w/ Base CO2 $480 Price and Ref Gas, all High / Low Gas $(238) Low Gas High Gas other numbers are deltas from this point. High Coal High / Low Coal $(61) $56 Low Coal CO2 Level $(202) High CO2

  172. Slide 172: Range of Uncertainty: 2029 Decision Point

    Range of Uncertainty: 2029 Decision Point 2029 Decision Point 2013 Start $98 $1,113 High / Low Gas $(538) Low Gas High Gas High Coal High / Low Coal $(207) $173 Low Coal CO2 Level $(406) High CO2 Low CO2 $459 • Uncertainty associated with changes in CO2 prices and coal are relatively symmetrical (up

  173. Slide 173: Range of Uncertainty: 2040 Decision Point

    Range of Uncertainty: 2040 Decision Point 2040 Decision Point 2013 Start $98 $1,574 High / Low Gas $(730) Low Gas High Gas High Coal High / Low Coal $(336) $274 Low Coal CO2 Level $(472) High CO2 Low CO2 $730 • Uncertainty associated with changes in CO2 prices and coal are relatively symmetrical (up

  174. Slide 174: Summary of Model Results

    Summary of Model Results • Case performance and economic outcomes are uncertain – In particular, 2029 & 2040 NPV results are highly dependent on future circumstances: • CO2 Price • Fuel Prices • 2020 decision point case is durable (performs well under a variety of circumstances) • 2029 case is stron

  175. Slide 175: Observations from Analysis

    Observations from Analysis • Today’s economic results are based on stand-alone Boardman NPV analysis – All Boardman case results must be further assessed in connection with overall IRP portfolio analysis (to be presented in the next public workshop) • Economic analysis supports the need for a decisi

  176. Slide 176: Appendix

    Appendix 21

  177. Slide 177: Coal Price Forecast Comparison

    Coal Price Forecast Comparison (Real Levelized in 2009$) Boardman Delivered Coal Price Forecast Feb 2009_RL_$2.96 $3.71 RL 2009$ Nominal $/MMBtu $2.33 RL 2009$ 2010 2015 2020 2025 2030 2035 2040 Delivery Date 22

  178. Slide 178: Gas Price Forecast Comparison

    Gas Price Forecast Comparison (Real Levelized in 2009$) Average Sumas and AECO Price Forecast Feb 2009_RL_$7.7 May 2008_RL_$8.42 $12.84 RL 2009$ Oct 2008_RL_$8.7 Nominal $/mmbtu $5.19 RL 2009$ 2010 2015 2020 2025 2030 2035 2040 Delivery Date 23

  179. Slide 179: Historical Sumas Cash Price

    Historical Sumas Cash Price $12 2008 Sumas Cash Prices illustrates $11 this commodities’ volatility: $10 •Within same calendar year, Gas $9 $/mmbtu prices ranged between $5 to $12 per $8 mmbtu $7 2008 Sumas Cash Settle •Market for Natural Gas is $6 increasingly global. Various events $5 have impact

  180. Slide 180: Integrated Resource Plan 2009: Wrap-up & Next Steps

    Integrated Resource Plan 2009 Wrap-up & Next Steps April 10, 2009

  181. Slide 181: Wrap-up & Key Points

    Wrap-up & Key Points • Boardman is a key part of PGE’s current diverse portfolio – Baseload – Dispatchable – Reliable – Low cost and helps provide price stability • The decision regarding Boardman emissions control upgrades is important to PGE’s customers • Boardman recommendation will be made: – Ba

  182. Slide 182: Wrap-up & Key Points: Climate Policy

    Wrap-up & Key Points: Climate Policy • Climate Policy is Fluid and Developing • Structure and Key Elements Remain “In Play” – Method (cap & trade, tax or mandate) – Start date and glide path – Economy wide or sector specific – State, regional or federal – Allowances (auctioned or allocated, emission

  183. Slide 183: Wrap-up & Key Points: CO2 Approach

    Wrap-up & Key Points: CO2 Approach • Future CO2 Price is Uncertain & Scenario-Dependant – Legislative Policy – U.S. / Global Response to Policy – Technology Development and Adoption – Supply Curve for GHG Abatement / Mitigation • Unable to Clearly Define Gas – CO2 Price Relationship – Some evidence

  184. Slide 184: Wrap-up & Key Points: Economic Analysis

    Wrap-up & Key Points: Economic Analysis • Results based on stand-alone Boardman analysis – Value and risk of Boardman emission control upgrades must be further assessed as part of overall IRP portfolio analysis (to be presented in the upcoming public workshop) • Analysis supports need for decision p

  185. Slide 185: Next Steps

    Next Steps • Boardman alternatives will be further evaluated in overall portfolio context • Key factors considered in portfolio analysis – Reliability (e.g. Loss of Load Probability) – Cost / Risk • Cost variance – Scenario Analysis (performance across futures) • Price volatility – Stochastic • Cust