First Lithium Minerals Corp. · CSE:FLM
First Lithium Minerals — Investor Presentation (May 2025)
27 slides from First Lithium Minerals's investor presentation, May 8, 2025
Slide 1: First Lithium Minerals Corp.
First Lithium Minerals Corp. L I T H I U M A N D A L K A L I M E TA L S E X P L O R AT I O N A N D D E V E L O P M E N T C O M PA N Y C S E : F L M | OT C : F L M C F | F S E : X 2 8 May 2025
Slide 2: Cautionary Statements
Cautionary Statements Information set forth in this presentation contains forward-looking statements that are based on assumptions as of the date of this presentation. These statements reflect management's current estimates, beliefs, intentions and expectations. They are not guarantees of future per
Slide 3: First Lithium Minerals Corp. company overview
First Lithium Minerals Corp. (CSE: FLM | OTC: FLMCF | FSE: X28) is a Canadian lithium and alkali metals exploration and development company with the brine project in northern Chile and gold/LCT pegmatite prospect in northwestern Ontario, Canada. Salar de Ascotan Project: 1,800 ha of exploration conc
Slide 4: Corporate Profile
Shareholder Ownership 14% Corporate Profile 86% Mgmt & Board Retail & Individual Investors CSE: FLM Shares outstanding 95.4 million Share price $0.055 Market capitalization (March 5, 2025) $5.3MM Cash (Q4/24) $1.9 MM No Debt Options 4,350,000 @ $0.08 expiry Dec. 20, 2028 4
Slide 5: Management and Board
Rob Saltsman | President, CEO and Director Mr. Saltsman has 25 years of experience in venture capital and public investments and is the Founder of First Lithium Minerals Corp., a company he founded in 2017. He served as the CEO of Compel Capital Inc. and RMM Ventures Inc., and as Vice President of G
Slide 6: Lithium Price
Lithium Price Slower global EV sales resulted in suppressed lithium demand in 2024 LC prices remain at $10/kg in Q1/25 Lithium demand is expected to sustain long- term upper price momentum as supply is not expected to catch up in the long-term While off the multi-year highs, Chile lithium carbonate
Slide 7: Lithium Demand
Lithium Demand Lithium demand is expected to continue be driven by EV, consumer electronics, grid, and mobility Source: SQM, Arcadium Lithium, Industry Reports, Company Reports 7
Slide 8: Lithium Supply
Share of lithium minerals and brine production LCE tpy (%) Lithium Zimbabwe 1% United States 1% Portugal Supply Brazil 1% Argentina 6% 1% China 13% Global lithium production ~ 1.3 million tpy LCE Inelastic nature of supply Australia 52% Long time to bring new capacity online The excess in lithium ca
Slide 9: Salar de Ascotan Project
Salar de Ascotan Project 9
Slide 10: Project Location and Infrastructure
Project Location and Salar de Ascotan Project Infrastructure - The mineral exploration concessions that form the OCA Salar de Ascotan Project located in the Salar de Ascotan, within the hydrogeologic settings of the Andean EL Abra Copper Mine plateau bordering Bolivia - The OCA Salar de Ascotan Proj
Slide 11: Topography of the Salar de Ascotan
Topography of the Salar de Ascotan The salar basin is bordered on the north by the Salar de Carcote basin, on the east by volcanic chains bordering Bolivia To the south, the basin is bordered by the San Pedro de Inacaliri River basin, while to the west the basin is cut-off by a volcanic chain summit
Slide 12: Salar de Ascotan Exploration Target
Salar de Ascotan Project Focus Area for Exploration Target Resource Delineation - The eastern flank is at the continental - 1,800 ha of exploration concessions divide formed by the Andes: the - Climate is arid, with average annual that form the project focus area Paruma de Portezuelo mountain (5,582
Slide 13: Mineralization
Mineralization Mineralization in the Salar de Ascotan Project is primarily represented by three different fractions: Liquid, represented mainly by chloride and sulfate brines Dendritic material, consisting of sand, silt and clay intercalated in the salar sediments Various precipitated salt compou
Slide 14: Hydrogeology
Hydrogeology Salar de Ascotan corresponds to a classic continental ‘saline deposit’ type or the Salar Lithium (Li), potash (K), boron (B), sodium (Na) and magnesium (Mg), among others, are leached and transported from rocks in the catchment, and then accumulated and concentrated by evaporation in th
Slide 15: Exploration Program
Exploration Program 15
Slide 16: TEM and MT Geophysics
TEM and MT Geophysics Completed extensive property-wide Transient Electromagnetic (TEM) geophysical surveys (December 2022) TEM contiguously spaced stations along 28 profiles for a total of 47.8 line-km Highly conductive zones across concessions up to 400m at less than 1.0 Ohm-m beneath the surface
Slide 17: Surface Brine and Brackish Water Sample Locations
Salar de Ascotan Surface Brine and Brackish Water Sample Locations Highs of 78 Li mg/l at surface brine and brackish water samples validate Salar de Ascotan as a strong exploration target and potential future resource Salar de Ascotan mineralization is expected to exhibit typical hydrogeological c
Slide 18: Surface Brine and Brackish Water Sampling Program
Surface Brine Number Coordinates UTM Element and Brackish Sample East North B Ca Li K Na Mg (m) (m) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) AST-1 575,042 7,629,681 169.3 1,901.9 63.5 1,445.0 15,148.6 999.7 Water Sampling AST-2 AST-3 575,765 572,797 7,629,933 7,627,938 166.9 162.4 1,926.5 1,908.8 6
Slide 19: Near Surface Sediment Geochemistry
Near Surface Sediment Geochemistry A semi-systematic near surface sediment sampling program was completed over identified geophysical and drill targets at the Ascotan Project (April 2025) 50 samples were taken using portable auger drill at a depth between 0.5-1.5 meters with an average depth of 0.8
Slide 20: Environmental Approval and Cooperation Agreement with Indigenous Community
Environmental Approval and Cooperation Agreement with The Cebollar-Ascotan Indigenous Community Favorable official response from the Environmental Evaluation Service of Chile “Servicio de Evaluación Ambiental (SEA)” to the OCA Salar de Ascotan Project “Consulta de Pertinencia de Ingreso al SEIA del
Slide 21: Salar de Ascotan exploration program timeline estimates
Salar de Ascotan Project exploration program - timeline estimates Property-wide TEM geophysical surveys 47 line-km – completed Q4/22 Magneto-Telluric (MT) geophysics - completed Q1/23 Drill target definition – completed Q2/23 Surface brine geochemical sampling program – completed Q3/23 Env
Slide 22: Lidstone Northwestern Ontario
Lidstone Northwestern Ontario Gold and LCT Pegmatite Prospect 22
Slide 23: Lidstone
Lidstone Gold and Lithium-Cesium-Tantalum pegmatite prospect The property is located approximately 120 km northeast of the town of Armstrong, Ontario, which is approximately 270 km directly north of the City of Thunder Bay along highway 527 Network of logging roads allows the property access from th
Slide 24: Prospect Geology
Prospect Geology Mineral deposit types known to occur within the English River sub province include the formation of extensive Fe formation of wacke-turbidite association, RE pegmatites subprovince boundary zones, Cu-Ni-Co- PGM sulfides in meta-ultramafic pods, and polymetallic VMS within the greens
Slide 25: Geophysics
Ontario High Resolution Aeromagnetic Residual Magnetic Intensity Geophysics The prospect area consist of coincident magnetic abrupt highs and lows and zones of high electromagnetic (EM) conductance Multiple areas of interest suggests historical work overlooked a significant exploration opportunity i
Slide 26: Lidstone Exploration Program
Lidstone Exploration Program Reconnaissance exploration 2025 field season Geologic mapping Geophysical survey Geochemical survey Line cutting Drill target definition 26
Slide 27: Contact us
Contact us Rob Saltsman, CEO and President First Lithium Minerals Corp. 40 King Street West, Suite 2400 Toronto, Ontario M5H 3Y2 Canada www.firstlithium.ca Tel: +1 416 402 2428 Email: rob@firstlithium.ca 27
First Lithium Minerals — Investor Presentation (May 2025) on 6ix