Lithiumbank Resources Corp. · TSXV:LBNK

Lithiumbank Resources — Investor Presentation (July 2026)

18 slides from Lithiumbank Resources's investor presentation, July 2026

  1. Slide 1: Lithium Brine: Canada's Nearest Term Prospective Large Scale Direct Brine Producer

    SCALABLE · SUSTAINABLE Lithium Brine Canada’s Nearest Term Prospective Large Scale Direct Brine Producer Rob Shewchuk Co-Founder, CEO & Director July 2026

  2. Slide 2: Corporate Profile

    LITHIUMBANK RESOURCES CORP. Corporate Profile TSXv: LBNK OTC: LBNKF FRA: HT9 LithiumBank.ca Boardwalk PEA Metrics 1 Development History Invested > $40M in exploration and development 34,005 tonnes $4,588/t Annual LHM Production Opex · USD Consolidated ~ 1.24M ac of Mineral Licenses Defined two Natio

  3. Slide 3: Brine is the Next Generation

    WHY OILFIELD BRINE Brine is the Next Generation ADVANTAGES OF OILFIELD BRINES Conventional Sources LITHIUMBANK Boardwalk Project Hard Rock Salars × High Capex × South America Centric Uses Direct Lithium Extraction (DLE) Technology × High Opex × High Capex × ~10 years to permit × Long Development Tim

  4. Slide 4: LithiumBank Brine Hosted Mineral Licenses

    LAND POSITION LithiumBank Brine Hosted Mineral Licenses Alberta BHML Boardwalk 159,979 ha Park Place 226,683 ha Peace 13,920 ha NO Pore space or CCUS overlap NO Freehold land in area Saskatchewan BHML Kindersley 47,306 ha South 54,193 ha Total 502,082 ha

  5. Slide 5: LithiumBank Update

    WHERE WE ARE TODAY LithiumBank Update TSX.V: LBNK MISSION New and Developing Commercialize Boardwalk with the lowest cost of capital within the shortest timeframe while having the LOI signed for project scale production infrastructure lowest environmental and social impact Development Agreement sign

  6. Slide 6: Location, Infrastructure and Services

    PROJECT INFRASTRUCTURE Location, Infrastructure and Services TSX.V: LBNK Location Edmonton (population of metro area 1.8M) ~2.5- hour drive from Boardwalk. Grande Prairie City (population ~70k) <1 hour drive Access 4-lane divided highway through production zone Power 240 kV power lines through produ

  7. Slide 7: LithiumBank's DLE Advantage – Schlumberger (SLB)

    PROCESSING TECHNOLOGY LithiumBank’s DLE Advantage – Schlumberger (SLB) TSX.V: LBNK SLB DLE-Based Process and Technology Proven at Demonstration Scale at Clayton Valley 3 modules ~15,000 t LCE/yr Modular design ensures cost-effective scalability with processing done on site Nevada demonstration plant

  8. Slide 8: Mature DLE and Processing Technology

    PROVEN AT SCALE Mature DLE and Processing Technology TSX.V: LBNK 95% average Li recovery from SLB pilot testing SLB has long history of working in the Alberta Energy sector LithiumBank has been working with SLB for almost 3-years on the subsurface and DLE Boardwalk brine achieved an exceptionally pu

  9. Slide 9: Boardwalk Project Geology

    SUBSURFACE Boardwalk Project Geology TSX.V: LBNK Devonian aged Leduc Fm Dolomitized reef >400 wells in Leduc Extensive data set of historic production Over 230m thick Leduc Fm Consistent deliverability over the long-term Consistent lithium grades Consistent brine chemistry

  10. Slide 10: Boardwalk – The Best Brine Investment Opportunity

    INVESTMENT THESIS · ALBERTA Boardwalk – The Best Brine Investment Opportunity TSX.V: LBNK Simple Projects Get Built First The most straight forward brine project to permit (<2-yrs) NO CCUS/pore space overlap NO freehold land in the area NO oil production in the Leduc formation Abundant infrastructur

  11. Slide 11: Boardwalk Timeline to Financial Investment Decision (FID)

    BOARDWALK DEVELOPMENT TIMELINE FID 1ST LITHIUM PRODUCTION Boardwalk Timeline to Financial Investment Decision August 2027 July 2030 (FID) ◆ FID · Aug 2027 ◆ 1st Production · Jul 2030 2026 2027 2028 2029 2030 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Brine Collection (10-6) DLE & po

  12. Slide 12: Supplementary Slides

    LITHIUMBANK Supplementary Slides

  13. Slide 13: Significant Lithium Brine Resources In North America

    RESOURCE SCALE Significant Lithium Brine Resources In North America TSX.V: LBNK LithiumBank is among the global leaders in corporate holdings of lithium (LCE) resources Boardwalk 5.2 Mt LCE Measured & Indicated @ 81.6 mg/L Li 2.8 Mt LCE Inferred @ 79.0 mg/L Li Park Place 15.1 Mt LCE Inferred @ 80.0

  14. Slide 14: Alberta Support for LithiumBank – $3.9M from ERA

    NON-DILUTIVE FUNDING Alberta Support for LithiumBank – $3.9M from ERA TSX.V: LBNK Re-entry and drilling 2nd Well Emissions Reduction Alberta (ERA) to refund 50% of these costs ~$2,500,000 DLE & Mineral Processing to Battery-grade Li Carbonate ERA to refund 50% of these costs $850,000 Feasibility Stu

  15. Slide 15: LithiumBank Overview

    SUMMARY LithiumBank Overview TSX.V: LBNK MISSION Commercialize Boardwalk with the lowest cost of capital per kg of battery grade lithium carbonate within the shortest timeframe while having the lowest negative environmental and social impact Initial scope – two USD $300M DLE modules @ 10,000 tpa LCE

  16. Slide 16: LithiumBank Team

    LEADERSHIP LithiumBank Team TSX.V: LBNK Paul Matysek, M.Sc. (Geochem) Rob Shewchuk Kevin Piepgrass, P.Geo Executive Chairman Co-Founder, CEO & Director Chief Operating Officer Mr. Shewchuk began his career with Yorkton Mr. Matysek is a geoscientist by training, a Securities in Calgary, Alberta in 19

  17. Slide 17: LithiumBank Team

    LEADERSHIP LithiumBank Team TSX.V: LBNK Christopher Murray Steven Piepgrass, P.Eng, MBA Katya Zotova Ann Fehr Director Director Director CFO & Corporate Secretary Jon LaMothe, M.Sc Leo Karabelas, Nikolas Matysek VP Exploration Investor Relations Director of Communications

  18. Slide 18: Thank You

    LITHIUMBANK Thank You Rob Shewchuk Co-Founder, CEO & Director July 2026

LithiumBank Resources — Investor Presentation (July 2026) on 6ix