Pure Gold Mining — Investor Presentation (May 2016)
25 slides from Pure Gold Mining's investor presentation, May 2016
Slide 1: May 2016 PGM:TSX-V
May 2016 PGM:TSX-V
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT Cautionary Statement on Forward-Looking Information & Statements This presentation contains certain forward-looking information and statements which may not be based on historical fact, including without limitation, statements regarding the Company’s expectations in respect
Slide 3: A Fresh Look at a Past Producer
A FRESH LOOK AT A PAST PRODUCER HIGH GRADE GOLD One of the highest grade undeveloped deposits in the world with currently defined resources of 928,000 ozs at 8.93 g/t Au in 3.24 Mt indicated and 297,000 ozs at 11.74 g/t Au in 0.79 Mt inferred (1) JURISDICTION Operating in Red Lake, Ontario, Canada –
Slide 4: Direct Red Lake Experience
DIRECT RED LAKE EXPERIENCE MANAGEMENT & TECHNICAL TEAM BOARD OF DIRECTORS Darin Labrenz, President, CEO & Director Graeme Currie, Chairman • Former VP Business Development, Terrane Metals Corp. • Former Director, Investment Banking, of CanaccordGenuity • Former Chief Geologist, Placer Dome’s Campbel
Slide 5: Capital Structure
CAPITAL STRUCTURE Capital Structure (as at May 2, 2016) Key Shareholders Shares Outstanding 126.3 million Management & Directors 4.2% Options Outstanding Strategic Shareholders 26.6% 9.1 million Weighted average exercise price $0.25 AngloGold Ashanti 11.9% Robert McEwen (Evanachan Ltd.) 9.5% Warrant
Slide 6: Red Lake Mining District
Red Lake Mining District HIGHEST GRADE GOLD BELT IN CANADA +28 million oz high-grade gold mined in Red Lake to date* • Established, mining-friendly jurisdiction with 85 year history • 1.3 mozs of gold produced in the district at a grade of 19.5 g/t from 2013 to 2015 (1) • District continues to deliv
Slide 7: Project Overview
Madsen Project Overview FOCUSED ON POTENTIAL FOR NEW GOLD DISCOVERIES 3rd largest 2.5 million oz HISTORIC PRODUCTION* 9.9 g/t LAND PACKAGE IN RED LAKE AVERAGE HISTORIC GRADE* • 45 km2 contiguous, patented ground • Second largest historic producer in Red Lake • 36 years of continuous historical produ
Slide 8: Preliminary Economic Assessment
Madsen Gold Project PRELIMINARY ECONOMIC ASSESSMENT • Total gold production of ~260,000 ounces over 2016 PEA (1) a 6.5 year mine life at an average diluted head grade of 8.3 g/t gold (1) Pre-Tax IRR 74% • Positive preliminary economic assessment announced April 2016 Pre-Tax NPV5% Base case assessm
Slide 9: 2016 PEA – Opportunities for Enhancement
Madsen Gold Project 2016 PEA – OPPORTUNITIES FOR ENHANCEMENT (1) Mineral Resource Tonnes in Mine Plan • PEA only considers extraction of ~25% of Pure Gold’s existing mineral resource tonnes • Potential to expand base case tonnage through project exploration and resource growth Exploration Success in
Slide 10: Existing Mill & Mine Infrastructure
Madsen Project Overview EXISTING MILL & MINE INFRASTRUCTURE Interior of Madsen mill Madsen mine complex & village, Russet South in background 1,275 metre deep shaft & 27 levels of workings 9 Madsen mill Permitted tailings facility
Slide 11: Modern Science Driving Exploration
Madsen Exploration MODERN SCIENCE DRIVING EXPLORATION • Multiple highly prospective targets currently being drill tested • 10 kms of unconformity with +2.5mozs of historic production and 20 kms of prospective ultramafic contacts 10
Slide 12: Prioritizing & Advancing Numerous Gold Zones
Madsen Target Setting PRIORITIZING & ADVANCING NUMEROUS GOLD ZONES • High-grade gold in multiple target settings Note: Mine workings and geologic contacts in this image are schematic. The mineral resource estimate reported herein for the Madsen Gold Project is set out in the NI 43-101 technical repo
Slide 13: McVeigh Structural Interpretation
Madsen Mine Geology MCVEIGH STRUCTURAL INTERPRETATION • New drilling confirms mine geology is folded • Repetition of key stratigraphic market units confirms Austin and McVeigh altered horizons are the same zone • Orientation and continuity of McVeigh mineralization not previously recognized and rema
Slide 14: Phase I – 16,000 Metre Drill Program
Madsen Drill Program PHASE I – 16,000 METRE DRILL PROGRAM McVeigh Drill Program Focused on • 16.0 g/t Au over 7.0 m in PG16-058(1) McVeigh Horizon • 11.0 g/t Au over 5.9 m in PG16-071(1) • Limited near-surface production with a maximum historic mining depth of 230 m – open for expansion Austin • Ope
Slide 15: Targeting High-Grade Gold Shoots at McVeigh
Madsen Drill Program TARGETING HIGH-GRADE GOLD SHOOTS AT MCVEIGH -300m -600m 14 Note: See Pure Gold news releases dated March 1, 2016 and April 4, 2016 for further details and disclosure
Slide 16: New Near Surface Gold Mineralization
Madsen Discoveries NEW NEAR SURFACE GOLD MINERALIZATION Advancing high-grade satellite zones close to existing mine infrastructure Russet South • 20.1 g/t Au over 2.9 m in PG16-091(1) • 1.5 km west of headframe, up-dip from the 8 zone • 600 x 350 m target, open for expansion • 2,700 m drilling compl
Slide 17: Russet South
Madsen Discoveries RUSSET SOUTH • High grade gold located ~1.5 km west of the McVeigh horizon and existing infrastructure • Multiple shallow, high grade gold zones Focused on the Alpha, Beta and Kappa zones • Red Lake high grade analogue • Folded repeat of the same stratigraphy that hosts the Mads
Slide 18: Fork Zone
Madsen Discoveries FORK ZONE • Pure Gold’s near-surface high-grade intercepts include: PG14-011: 17.2 g/t Au over 3.5 m, starting at 152 metres(1) PG14-006: 14.6 g/t Au over 1.8 m, starting at 8.5 metres(1) PG15-037: 3.9 g/t Au over 12.1 m, starting at 134 metres(1) • Fork Zone remains open to
Slide 19: Benchmarking vs. Peers – Resource Grade
BENCHMARKING VS. PEERS – RESOURCE GRADE M&I Resource Grade 12.0 10.49 10.0 M&I Resource Grade (g/t Au) 9.04 8.93 8.0 5.87 6.0 4.09 3.85 4.0 3.50 1.63 1.45 2.0 0.82 0.63 0.0 Dalradian Integra Pure Gold Sabina Gold Eastmain ATAC Condor Gold Midas Gold Kaminak Ascot Gold Standard Inferred Resource Grad
Slide 20: Benchmarking vs. Peers – Market Cap & P/NAV
BENCHMARKING VS. PEERS – MARKET CAP & P/NAV Price / NAV 1.20x 1.00x 0.93x 0.77x 0.80x 0.73x 0.69x 0.69x Price / NAV 0.59x 0.60x 0.55x 0.46x 0.40x 0.18x 0.20x 0.00x Sabina Gold Kaminak Midas Gold Gold Standard Integra ATAC Dalradian Pure Gold Eastmain Market Capitalization $450 $391 $400 $350 $330 $3
Slide 21: Pure Opportunity
PURE OPPORTUNITY Focused on a prolific jurisdiction with an existing high grade resource and permitted mine infrastructure Team with intimate knowledge of Red Lake district, geology and operations Preliminary Economic Assessment presents a robust base case foundation utilizing existing infrastructur
Slide 22: Appendix
APPENDIX pureggld , 21
Slide 23: Madsen Mineral Resource
MADSEN MINERAL RESOURCE Grade Grade Contained Gold Resource Class Zone Host Type Tonnes g/t Au oz/t oz Au Indicated Austin UC 1,677,000 7.92 0.23 427,000 South Austin UC 850,000 9.32 0.27 254,000 McVeigh UC 374,000 9.59 0.28 115,000 8 Zone UM 335,000 12.21 0.36 132,000 Total Indicated 3,236,000 8.93
Slide 24: 2016 PEA – Additional Details
Madsen Gold Project 2016 PEA – ADDITIONAL DETAILS • Underground mining via mechanized cut and fill, PEA SUMMARY PARAMETERS (1) shrinkage, and long-hole mining methods Gold Price US$1,175/oz • $20.1 million in pre-production capital costs over a Exchange Rate (US$ to C$) 0.80 12-month period Total Re
Slide 25: Corporate Inquiries: Darin Labrenz
Corporate Inquiries: Darin Labrenz President & CEO t: 604.646.8000 info@puregoldmining.ca PGM:TSX-V 1900 – 1055 West Hastings Street Vancouver, BC V6E 2E9 www.puregoldmining.ca