Critica Limited · ASX:CRI

Critica — Venture Minerals — Investor Presentation (February 2008)

26 slides from Critica's investor presentation, February 2008

  1. Slide 1: Venture Minerals Ltd (VMS) Mount Lindsay Project

    Venture Minerals Ltd (VMS) Mount Lindsay Project February 2008

  2. Slide 2: Mount Lindsay - compelling in 3 major ways

    Mount Lindsay-“compelling in 3 major j ways” y ƒ Location - ƒ Production Precedent (Savage River & Renison Bell) ƒ Infrastructure (water, power, road, rail & port) ƒ Expected Low Capital Expenditure - ƒ Comparison p to other p projects j ƒ Advantage in current debt market ƒ Short lead time ƒ Exposur

  3. Slide 3: Capital Structure

    Capital Structure ƒ Listed on ASX: 22 Sep 2006 ƒ Shares on issue: 51.5 million (34 3 million (34.3 illi ttradeable) d bl ) ƒ Market Cap $15 5 million $15.5 ƒ Management Ownership: 33% ƒ Cu Current e Cas Cash in ba bank: A$2.4 $ million o ƒ Current Share Price: 30c

  4. Slide 4: Directors/Management

    Directors/Management Experienced management team in all areas of operations, with a focus on accelerated drill programs p g ƒ Mr Mel Ashton; Non-Executive Chairman Regional Councillor at the Institute of Chartered Accountants, a number of other Board Appointments including Chairman of Gryphon Minera

  5. Slide 5: Recent Highlights

    Recent Highlights ƒ New Iron Zone discovered at Stanley River- 31m @ 61.9%Fe ƒ Metallurgical results far exceed expectation expectation- 150 micron grind ƒ Excellent results from Venture’s first drill holes- 46m @ 43.4%Fe ƒ Three Drill rigs on site- completing 10,000 metres.

  6. Slide 6: Location of Mount Lindsay (Renison West) Project

    Location of Mount Lindsay ((Renison West)) Project j 1,000Km

  7. Slide 7: Tenement Locations

    Ocean EZ Power station O Mine © Prospect ——= Highways ———— Minor Road BB stars 0 10 [J Granite ———— Kilometres Siulay binjFields EL21/2005| ullah Roseb or

  8. Slide 8: Savage River Mine

    Savage River Mine

  9. Slide 9: Magnetite Potential

    Magnetite Potential ƒ Only 17 of the 81 historic holes have been assayed for Iron in the mineralised i li d Ti Tin zones. ƒ 15 of those drill intersections have an average width of 24m at a weighted average grade of 32%Fe. ƒ One drill intersection was selected for initial metallurgical testwork, res

  10. Slide 10: Tenement Locations

    Tenement Locations Power Station O Mine © Prospect —— Highways Minor Road =| Skarns ae | Granite EL33/2007

  11. Slide 11: Drill Plan - No.2 Zone

    Drill Plan -No.2 Zone ‘Granite © - . 7 ; 3 : 2SeS: fe 2 = = / OF MOUNT LINDSAY-*” i —= [ | { Drilling } —— Faults GE Targets Area —F | «a7s ML37 30.5m @ 40.5%Fe from 268.5m} - ML41 54.5m @ 34.8%Fe from 270.5m} fy

  12. Slide 12: ML37 Drill Section

    2250m RL ML37 Drill Section Hornfels, Sandstones and Mudstones. 30.2m @ 40.9%Fe & 0.09%Sn No2 Carbonate horizon. Host to skarn magnetite mineralisation.

  13. Slide 13: 330m NW - New Drilling

    330m NW-New Drilling 2m @ 41.3% Fe & 0.04%Sn from 35m 18m @ 35.2% Fe & 0.05%Sn from 45m Hornfels, % Sandstones and Mudstones. ry € (=) Ve} el ————~ 46m @ 43.4% Fe & | 2400m RL 0.04%Sn from 90m Skarn magnetite} mineralisation

  14. Slide 14: Long Section - No.2 Zone

    Long Section-No.2 Zone 150m 150m 1 50m 15

  15. Slide 15: Drill Plan - No.2 Zone with the Main Zone

    Drill Plan-No.2 Zone with the Main Zone

  16. Slide 16: Mount Lindsay Project

    Granite Drilling Faults Y/) ‘/, Target Area "#4 ML37 30.5m @ 40.5%Fe from 268.5m |

  17. Slide 17: Regional Magnetics With Target Zones

    Regional Magnetics With Target g Zones

  18. Slide 18: Power

    VENTURE

  19. Slide 19: Road and Rail

    Road and Rail VENTURE

  20. Slide 20: Water

    VENTURE

  21. Slide 21: Port at Burnie

    Port at Burnie VENTURE

  22. Slide 22: Metallurgical Testwork - Second Stage Results

    Metallurgical Testwork – Second Stageg Results ƒ Grind G i d Si Size 4 ti times coarser (150 micron) i ) than th mostt other th Magnetite M tit Projects = Cost Savings. ƒ Most other Magnetite Projects are BIF hosted deposits that require a grind of 40 micron or less to achieve saleable iron ore prod

  23. Slide 23: Tin Potential

    Tin Potential ƒ Located L t d 15 kkm NW and d along l strike t ik tto th the R Renison i B Bellll Mi Mine which hi h has produced more than 200,000t of Tin worth >$3.5 Billion today. ƒ Tin mining began at Mount Lindsay during the 1890s. ƒ Substantial tin mineralisation within historic drill results

  24. Slide 24: Current Work Program

    Current Work Program ƒ Venture V t has h contracted t t d three th D Drill ill Ri Rigs with ith an iinitial iti l campaign i off up tto 10,000 metres of Diamond Core to be completed by June 2008, with 3,000 metres already completed. ƒ Fugro Airborne Surveys Pty Ltd completed a detailed airborne magn

  25. Slide 25: Going Forward

    Going Forward ƒ Maiden Resource Statement ƒ Scoping Study ƒ Phase Two Drill Program ƒ Resource Update ƒ Industry I d t Comparisons- C i Magnetite Deposit Company Ownership Resource Tonnage* Wilcherry Hill Ironclad Mining 50Æ80% 44Mt Cairn Hill IMX Resources 100Æ90% 14.3Mt * Publically announced JORC

  26. Slide 26: THE END

    THE END For up to date information please click to our website www.ventureminerals.com.au

Venture Minerals — Investor Presentation (February 2008) on 6ix