  1. Slide 1: J. Kumar Infraprojects Limited

    LOREM IPSUM DOLOR J. Kumar Infraprojects Limited We dream… So we achieve…

  2. Slide 2: Agenda

    AGENDA • Company Overview • Business Strategy • Order Book • Key Highlights • Appendix A. Financial Highlights B. Major Projects Completed C. Major Projects Under Execution

  3. Slide 3: Company Overview

    Company Overview J. Kumar Infraprojects Limited, promoted by Mr. Jagdishkumar M. Gupta was incorporated in the year 1999 with an object to carry on the business as a builders, contractor or sub contractor. Our core competence and expertise is in the field of Transportation Engineering, Civil Constru

  4. Slide 4: Business Verticals

    Business Verticals Civil Piling Transportation Construction Irrigation Engineering Metro Rail (Underground & Hospital cum Medical College Earthen Dams Insitucast Piling Elevated) Railway Terminus & Station Minor Irrigation Tanks Precast Piling Flyovers, Bridges & Roads Other Civil Constructions Spil

  5. Slide 5: Milestones

    Milestones 2016 Awarded With Mumbai 2015 Metro Projects worth • Awarded with Ahmedabad Rs. 67,174 MN 2013 Metro Project worth Rs. Revenue Crossed Rs. 2,781 MN 10,000 MN • Fund raised through QIP of 2012 Rs. 4,093 MN Awarded with DMRC 2008 Project worth Rs. 14,072 Listed on BSE & NSE MN & UPRNNL Proj

  6. Slide 6: Our Key Strengths

    Our Key Strengths Operational capability in different types of Large fleet of owned machineries and infrastructure projects equipments We have wide ranging capabilities in different We have a large fleet of owned machinery and equipment infrastructure verticals including transport engineering, provi

  7. Slide 7: Key Management Profile

    Key Management Profile Mr. Jagdishkumar Gupta – Founder Promoter & Executive Chairman • Instrumental in setting up and for the growth of JKIL. Under his leadership, since its modest start in the year 1980, JKIL has expanded and grown as a Registered Class I-A construction company • His acumen has be

  8. Slide 8: Other Board of Directors

    Other Board of Directors Kusum J. Gupta • She has been associated with the company since May 2014 , and joined as ‘women director’ Director Padmanabh P. Vora • He is a Chartered Accountant by profession and has over 32 years experience in finance, banking and Independent Director management • He has

  9. Slide 9: Key Managerial Personnel

    Key Managerial Personnel Management Background He has a bachelor’s degree in civil engineering from Pune University and has over five decades of experience. S.M. Thorat He retired as a Superintendent Engineer after 37 years of service in PWD, Maharashtra, and has extensive experience in planning and

  10. Slide 10: Key Managerial Personnel

    Key Managerial Personnel Management Background He hold ASCE ( American Society of Civil Engineers ), TEE ( Certified Licensed Civil engineers of Greece ), Qatar Attestation (Attested Peter Andrikopoulos Civil Engineer by Qatar’s U.S. Embassy ) certification .he has over 35 years experience TBM Relat

  11. Slide 11: Key Managerial Personnel

    Key Managerial Personnel Management Background He holds a masters degree in geology and has over 25 years experience in soil investigation, rock anchoring, piling / micro piling, Shirish A. Kulkarni construction of diaphragm wall and rotary piling work for various types of structures. Vice President

  12. Slide 12: Key Financials – Over the years

    Key Financials – Over the years Turnover (Rs. in Mn) EBIDTA (Rs. in Mn) & EBITDA Margin 16000 3000 19.63% 20.00% 14000 18.89% 19.50% 2500 19.00% 12000 18.25% 2000 18.50% 10000 17.61% 18.00% 8000 1500 17.50% 16.82% 6000 17.00% 1000 16.50% 4000 500 16.00% 2000 15.50% 9,316 10,007 11,868 13,432 14,086

  13. Slide 13: Key Highlights

    Key Highlights Leaders of this niche segment Experienced management Operate with margins better team then the industry Large fleet of owned Increasing and diversified machineries order book Huge macro potential Reputed client base - backed by proven execution Government and Private capabilities 13

  14. Slide 14: Growth in Order Book

    Growth in Order Book 120,000 100,000 96,930 80,000 Rs. In Million 60,000 46,868 47,365 44,012 40,000 37,303 20,000 0 Dec '12 Dec '13 Dec '14 Dec '15 Dec '16 Our Company has a strong order book 14

  15. Slide 15: Order Book Details

    Order Book Details Segment Wise Break-up Sub-segment Wise Break-up Civil, 2,345 Irrigation, Civil, 2,345 835 Irrigation, Piling, 26 Piling, 26 Road, 835 Flyover, Civil 13,362 11,870 Flyover Civil Irrigation Metro - Irrigation Elevated, Metro - Elevated Piling 17,435 Metro - Underground Transportat M

  16. Slide 16: Overview – Transport Engineering

    Overview – Transport Engineering • In this business vertical, we are engaged in construction of Metro Rail (Underground & Elevated) Mono Rail, ROB’s, RUB’s, roads, flyovers, bridges, skywalks, airport runways and storm water drainage works • We have over 2 decades of experience in transport engineer

  17. Slide 17: Overview – Piling

    Overview – Piling • Piling is a specialized activity carried out with hydraulic piling rigs • We build pile foundations for buildings and flyovers, marine structures and offshore platforms • In 2007 we started a new piling division and We are one of the leading piling contractors in the country • Cu

  18. Slide 18: Large Fleet of Owned Machinery & Equipment

    Large Fleet of Owned Machinery & Equipment Sr. No. Type of Equipment No. of Units Kind & Make 1 Tunnel Boring Machine 4 Terratec We believe that ownership of 2 Hydraulic Piling Rig 28 MAIT machineries and equipment is our 3 Poclain/Excavators 19 Tata Hitachi/Komatsu key to timely completion of 4 Dum

  19. Slide 19: Business Strategy…1

    Business Strategy…1 Increasing the order book On an expansion Increasing the mode in other scope of work for states of India each order Drive Revenue Enhancing pre- Associating qualification ourselves with strengths through larger projects strategic alliances Increasing fleet of Increasing Sectoral

  20. Slide 20: Business Strategy…2

    Business Strategy…2 Focus to remain on timely execution of projects Optimum utilization of Expansion of RMC Plant and Machinery division Do not intend to Moving up the Value Growth in undertake sub- Chain Net Profit contracting work We are poised to capture the growing infrastructure market with our

  21. Slide 21: Metro Infra (Elevated / Underground)

    Metro Infra (Elevated / Underground) Completed & Handed Over CC – 02 (Rohini Sector - 18 to Badi Corridor, New Delhi) for DMRC for INR 1528.3 Mn CC – 09 (Badli Mor to Jahangir Puri, New Delhi) for DMRC for INR 464.6 Mn CA -01 (Viaduct from Belapur to Kharghar Sect 14) for CIDCO Navi Mumbai Metro for

  22. Slide 22: a J. Kum

    a J. Kum < ——- > — — —— ——— = ee — == — Ss — —— ———- o_ —<s — 2 — = Oe 22

  23. Slide 23: Metro Infra: Recently Awarded Metro Projects

    Metro Infra (Elevated / Underground) Recently Awarded Metro Projects Mumbai Metro Line 2 (Package-I & II) Dahisar (E)- D.N. Nagar (Andheri West Mumbai) for INR 13,440 million Mumbai Metro Line 3 (Package 5) - Underground Three Stations at CSIA Domestic, Sahar Road and CSIA International for INR 16,8

  24. Slide 24: Key Highlights of the Awarded Mumbai Metro Contracts

    Metro Infra (Elevated / Underground) Key Highlights of the Awarded Mumbai Metro Contracts Awarded Contract of Mumbai Metro (Line -2, Line - 3 & Line -7)under EPC model vis-à-vis currently operational Package I (i.e. Ghatkopar to Versova) under PPP Model All the required permissions including Right o

  25. Slide 25: Metro Infra: Company proficiency

    Metro Infra (Elevated / Underground) Company proficiency Work has already commenced at all stretches and presently as per project schedule. All past Metro contracts (both underground & elevated) executed with good margins. Financial Closure achieved for above metros: Mumbai Metro Line 2 financial cl

  26. Slide 26: Mumbai Metro Line 3

    MUMBAI METRO LINE -3 1. The MML - 3 connects to Colaba – Bandra - SEEPZ underground metro line, 2. Total Length of MML-3 ~ 33.5-km divided in 7 packages. 3. MML-3 Comprises of 26 Underground stations. 4. Project will be monitored by is Mumbai Metro Rail Corporation Ltd. (MMRC) (A SPV of MMRDA). 5. M

  27. Slide 27: Mumbai Metro Line 2 Entire Stretch

    MUMBAI METRO LINE 2ntire Stretch 27

  28. Slide 28: Name of Project

    NAME OF PROJECT CONTRACT UGC-06 Design and Construction of Underground Section including three Underground Stations at CSIA Domestic, Sahar Road and CSIA International and Associated Tunnels. 28

  29. Slide 29: Salient Features (Package-06)

    SALIENT FEATURES (Package-06 ) • TYPE OF WORK : Fully Underground • CONTRACT VALUE : INR 2,247.95 Crore • TOTAL LENGTH : 4.221 Km • TUNNEL LENGTH : 3.446 km x 2 (Twin Tunnel) ~7.0 Km • STATIONS : 3 nos 1. CSIA (D) : Cut & Cover - (216 m x 32.5 m x 23.5 m) 2. SAHAR ROAD : Cut & Cover - (216 m x 31.6

  30. Slide 30: UGC Package No. 06 Alignment Plan

    UGC PACKAGE NO. 06 ALIGNMENT PLAN SAHAR ROAD INTERNATIONAL DOMESTIC 30

  31. Slide 31: Appendix

    APPENDIX 31

  32. Slide 32: Financial Highlights – Balance Sheet

    Financial Highlights – BALANCE SHEET Rs. in MN Balance Sheet Extracts Fiscal 2012 Fiscal 2013 Fiscal 2014 Fiscal 2015 Fiscal 2016 Equity Share Capital 278 278 278 322 378 Reserves and Surplus 4,112 4,756 5,475 7,569 12,455 Loan Funds 1,706 2,363 5,571 5,154 3,540 Net Fixed Assets 2,066 3,101 5,007 4

  33. Slide 33: Key Customers

    Key Customers Transportation Engineering Civil UPRNN Construction Vidharbh Irrigation Pimpri Irrigation Bambla Canal Irrigation Development Division, Division, Corporation Yavatmal Yavatmal Piling 33

  34. Slide 34: Some of our Prestigious Projects…1

    Some of our Prestigious Projects…1 ROB at Dahisar Flyover at Dindoshi, Mumbai Flyover at Hindmata Flyover at Dhanakwadi Bridge at Bandra -Mahim Balewadi Flyover, Pune Grade Separator, Pune Flyover at Panjarapole, Mumbai Skywalk at Bandra, Mumbai Skywalk at Cottengreen, Mumbai DMRC CC-24 Tunnel Flyov

  35. Slide 35: Some of our Prestigious Projects…2

    Some of our Prestigious Projects…2 DMRC CC-02 Kherwadi Flyover, Mumbai Mahape Flyover, Mumbai Sion-Panvel High Way Jogeshwari ROB, Mumbai Dhankawadi Flyover, Pune ESIC Hospital, Alwar Navi Mumbai Metro Flyovers being constructed across Maharashtra 35

  36. Slide 36: Financial Highlights – Profit & Loss Statement

    Financial Highlights – PROFIT & LOSS STATEMENT Rs. in MN Profit & Loss Fiscal 2012 Fiscal 2013 Fiscal 2014 Fiscal 2015 Fiscal 2016 Income from 9,316 10,007 11,868 13,432 14,086 Operation Other Income 67 89 108 130 177 Total Income (FY 2012–16) CAGR Total Income 9,383 10,096 11,976 13,562 14,263 of 1

  37. Slide 37: Major Projects Completed - Transportation Engineering

    Major Projects Completed - Transportation Engineering Work Done Name of Work executed Client (Rs. In Mn) Construction of Eastern Freeway section from Panjarapol to Chembur Mankurd Link Road KM MMRDA 2,938 0/000 to 2/500 Design and Construction of Flyover on Dr Baba Saheb Ambedkar Road, Mumbai, Mahar

  38. Slide 38: Major Projects Completed - Transportation Engineering

    Major Projects Completed - Transportation Engineering Work Done Name of Work executed Client (Rs. in Mn) W.S.-2 - Cleaning and Improvement of SWD and nallas including increasing / reconstruction in C.A.No. 206 i.e. Rajendra MCGM 491 Nagar Nalla in R/C Ward, WS-3 - do -- C.A. No. 205 i.e. Mathre Nall

  39. Slide 39: Major Projects Completed - Transportation Engineering

    Major Projects Completed - Transportation Engineering Work Done Name of Work executed Client (Rs. in Mn) Work Code No.AW 53 - Widening and improvement of various roads in P/North Ward MCGM 281 ES 8 & ES 9: Improvement of Kannawar Nagar Nalla system and training of Bombay Oxygen Nalla MCGM 266 Develo

  40. Slide 40: Major Projects Completed – Civil Construction, Irrigation

    Major Projects Completed – Civil Construction, Irrigation Major Projects Completed – Civil Construction Work Done Name of Work executed Client (Rs. in Mn) Modernization & computerization of Integrated Border Check Posts at 22 locations in the State of Sadbhav Maharashtra on Build, Operate & Transfer

  41. Slide 41: Major Projects Under Execution

    Major Projects Under Execution Contract Value of uncompleted Name of the Project value work (Rs. in Mn) as on (Rs. in Mn) 31.12.2016 Design and Construction of Underground Section including Four Underground Stations at Dharavi, B.K.C. Vidya Nagari and Santa Cruz and Associated Tunnels together with

  42. Slide 42: Major Projects Under Execution – Contd…

    Major Projects Under Execution – Contd… Value of uncompleted Contract value Name of the Project work (Rs. in Mn) as on (Rs. in Mn) 31.12.2016 Construction of Karalphata interchange from Km 3.600 to Km 6.073 Of NH-4B & from Km 5.300 to Km 7.422 of NH- 348 (Old SH-54) and connectivity to proposed 4th

  43. Slide 43: Major Projects Under Execution – Contd…

    Major Projects Under Execution – Contd… Contract value Value of uncompleted work Name of the Project (Rs. in Mn) (Rs. in Mn) as on 31.12.2016 Lower Wardha Mail Canal- Construction of Barrage @ Pulgaon on Wardha River with mechanical gate erection, survey design and all work. 925.80 834.99 Constructi

  44. Slide 44: Major Projects Under Execution – Contd…

    Major Projects Under Execution – Contd… Contract value Value of uncompleted work Name of the Project (Rs. in Mn) (Rs. in Mn) as on 31.12.2016 Improvement of Side Strips of S.V. Road in Mastic Asphalt in H/West & K/West Wards in Western Suburbs (W-276) 638.70 386.80 AW 88 Improvement of Various Road

  45. Slide 45: Disclaimer

    Disclaimer This Information Package is distributed by J. Kumar Infraprojects Ltd. on a strictly confidential basis for information only. This Information Package and the information and projections contained herein may not be disclosed, reproduced or used in whole or in part for any purpose whatsoev

  46. Slide 46: Mr. Arvind Gupta (Chief Financial Officer)

    Mr. Arvind Gupta (Chief Financial Officer) J. Kumar Infraprojects Ltd. Ph: +91-22-67743555 Email: arvind.gupta@jkumar.com 46