  1. Slide 1: Scotiabank Mining Conference

    Scotiabank Mining Conference December 2016 Lydianinternational.co.uk | TSX:LYD 1

  2. Slide 2: Cautionary Statements

    Cautionary Statements Forward Looking Information & Estimates of Reserves and Resources Certain information contained in this presentation, including any information relating to Amulsar's expected future performance, is "forward looking". All statements in this presentation, other than statements of

  3. Slide 3: Corporate Summary – Financing Structure Established

    Lydian International Corporate Summary – Financing Structure Established Ordinary Shares: LYD Trading Symbols Publicly-trading Warrants LYD.WT Ordinary Shares 699 million Share Capital Publicly-trading Warrants 99 million Unlisted Warrants 5 million Market Capitalization Recent price of C$0.31 C$215

  4. Slide 4: Amulsar Gold Project – Armenia

    Amulsar Gold Project – Armenia Compelling Asset – Construction Re-rate Opportunity Producer Upside • 100%-owned, now among a select group of Further Upside – 57.7% high-quality gold development projects 1.2x Implied Upside – 84.6% • Large scale operation will be Armenia’s 0.8x largest gold mine P /

  5. Slide 5: Amulsar Gold Project – Location

    Amulsar Gold Project – Location Easy Access & In-place Regional Infrastructure • 170 km southeast of Yerevan • Located on Armenia’s primary infrastructure corridor • Paved access to site • Local workforce • High-voltage power on site • Internet connection in place • Telecomm available • Water on sit

  6. Slide 6: Amulsar Operating Scale and Economics

    Amulsar Operating Scale and Economics Amulsar Mine Profile Supports Powerful Economics Operating Profile (Source: Q4 2015 – NI 43-101) Initial Mine Life (Years) 10.0 Annual Tonnes Processed 9,700,000 Waste : Ore Ratio 2.4 Gold Grade (g/t) 0.78 Gold Recovery 87.2% Annual Gold Produced (oz) 211,000 Al

  7. Slide 7: Large Scale Oxide Deposit

    Large Scale Oxide Deposit Initial 10-Year Mine Plan from 2.4 Million Oz P+P Reserves • Over 100 Mt inferred resource outside initial 10-year mine plan • Pit design optimized at $912/oz gold; economic evaluation at $1,150/oz gold • Excellent operating profile • Waste : Ore ratio at 2.4 – including 26

  8. Slide 8: Growth Potential

    Growth Potential Upside within Inferred Resource and at Depth • Resource conversion • Within current pits: 26 million tonnes at 0.57 g/t inferred • Optimizing to include inferred adds: 40 million tonnes at 0.73 g/t; mostly limited by drilling density • Open potential below pit limits (below East-Wes

  9. Slide 9: Amulsar Construction

    Amulsar Construction Latest Update • Engineering progress now +60% complete • Basic engineering near completion • Detail engineering advancing overall and complete on – • Heap leach facility • Main haul road • Other near-term project elements • Key equipment and facilities advancing to detail engine

  10. Slide 10: Amulsar Construction (continued)

    Amulsar Construction Latest Update (continued) • RD-3 – Mine Haul Road Top Soil Removal at the Camp Platform • Pioneer road advancing • Evaluating optimization opportunity • Connects mine pits to the crusher location • RD-5 – Primary access from Gndevaz • Upgrade in process, for access to – • Portio

  11. Slide 11: Near and Mid-term Catalysts

    Near and Mid-term Catalysts Focus on Construction 2016 2017 2018 • Construction start with • Project construction • Ore to pad mass earthworks Heap leach facility • • Plant commissioning • Land acquisition & • Haul roads • First gold pour conversion • Crushing/screening • Ramp-up of gold • Project t

  12. Slide 12: Comparable Development Stage Companies

    Comparable Development Stage Companies Targeting to Re-Rate Central to Construction Strategy Further Upside – 14.6% 1.2x Implied Upside – 154.0% 1.0x 0.8x 0.7x 0.6x 0.6x 0.6x P / NAV 0.4x 0.4x 0.4x Senior Producer TMAC Pretium Lundin Gold Pershing Gold Atlantic Gold Victoria Belo Sun Lydian Producer

  13. Slide 13: Thank You

    Thank You Lydianinternational.co.uk | TSX:LYD

  14. Slide 14: Mineral Reserves & Mineral Resources

    Mineral Reserves & Mineral Resources Notes Notes to Mineral Reserves: 1. The pit design was based on an optimization shell generated on gold only at a gold price of $912/oz. 2. The economic evaluations were based on a gold price of $1,150/oz and a silver price of $16.00/oz. 3. A diluted gold cut-off

  15. Slide 15: Management

    Management Experienced, Committed to Construction/Operations Excellence Howard Stevenson • 25 years global mining experience • Alacer Gold President & COO (President & CEO) • Meridian & Gold Fields Douglas Tobler • 35 years finance, accounting and mining experience • Alacer Gold CFO (CFO) • PwC, plu

  16. Slide 16: Board of Directors

    Board of Directors Development Oriented – Independent, Diverse Experience Gordon Wylie • 32 yrs mining experience • AngloGold-Ashanti Global (Non-Executive Director & Chair) • Exploration manager Howard Stevenson • 25 yrs global mining experience • Alacer Gold President & COO (President & CEO) • Mer