Petro Matad Limited · LSE:MATD

Petro Matad — Investor Presentation (August 2021)

16 slides from Petro Matad's investor presentation, August 2021

  1. Slide 1: Heron Field Early Production

    Mongolia Heron Field Early Production Low-cost Appraisal/Development High impact Exploration Upside Petro Petro Matad Matad II Heron Heron field field early early production production 11

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by Petro Matad Limited (the Company) and is for information purposes only. Some statements contained in this presentation or in documents referred to in it are or may be forward-looking statements. Such statements reflect the Company’s current views wit

  3. Slide 3: Petro Matad Board of Directors

    Petro Matad Board of Directors Chief Executive Officer: Mike Buck • 40 + years of international E&P experience including 9 years as COO of Salamander Energy • Proven track record of exploration success in S. America, N. Africa and Asia. Directly involved in the discovery of more than one billion bar

  4. Slide 4: Mongolia’s Leading Oil Company

    Mongolia’s Leading Oil Company Petro Matad • AIM Listed (MATD) Mongolia focused oil company with experienced Board and Management Team • 100% working interest and operatorship of two PSCs with the Government of Mongolia • Successful drilling campaign in 2019 in Block XX eastern Mongolia including He

  5. Slide 5: Mongolia Oil Industry

    Mongolia Oil Industry Government fully supportive of domestic oil industry • Mongolia’s daily crude production (2019): 18,840, (2020) 11,250 bopd - operations impacted by COVID- 19 pandemic • Petro China operates 95% of country’s production which is trucked to Chinese refineries • Mongolia’s refined

  6. Slide 6: Heron Field Development

    Heron Field Development SECTION TITLE Petro PetroMatad MatadII Heron HeronField field early Early production Production 66

  7. Slide 7: Heron Field Overview

    Heron Field Overview Working interests and operatorship Petro China processing and export facilities • Heron field located in Block XX • Petro Matad holds 100% working interest and is the operator of Block XX • Memorandum of Understanding (MOU) for cooperation signed with Petro China, operator of Bl

  8. Slide 8: Heron Field Near-Term Work Programme

    Heron Field Near-Term Work Programme Phase 1 development planned for 2022 • Plan to deploy proven production stimulation technology that has not yet been used in Mongolia • Production revenue contributes to follow on development cost (bopd) Heron Production based on 30% RF • Development can accelera

  9. Slide 9: Heron Development: Production Enhancement

    Heron Development: Production Enhancement Limited Reservoir Stimulation in Mongolia to date • Petro China uses rudimentary frack, partial water flood • Well rates variable from 10s to >600 bopd. Recovery Factor 15% Heron 1 Reservoir Modelling Results • Sector modelling by industry specialist identif

  10. Slide 10: Heron Field Production and Value Drivers

    Heron Field Production and Value Drivers Phase 1 Development • Early/immediate production and export will use spare capacity Petro China facilities only 17km from Heron 1 • MOU signed confirming cooperation, commercial details under discussion • Export to Mongol Refinery via new pipeline if built or

  11. Slide 11: Exploration Upside

    Exploration Upside Petro Petro Matad Matad II Heron Heron field field early early production production 11 11

  12. Slide 12: Block XX Exploration & Appraisal

    Block XX Exploration & Appraisal Low-cost exploration upside • Gazelle discovery adjacent to Heron Field Heron-1 • Total resource potential 500 MMbo in place. 100 to 200 MMbo recoverable¹ • Proven reservoir sections mappable up-dip towards southern basin margin 218km² exploitation area • Entire exte

  13. Slide 13: Block V – Raptor Trend

    Block V – Raptor Trend Active petroleum system • Snow Leopard 1 proved an active petroleum system • 4 large prospects defined c. 7km south Low-cost, very high impact exploration • Velociraptor drill ready. 200 MMbo recoverable resource with 400 MMbo potential in satellite structures • Total depth <1

  14. Slide 14: Summary

    Summary Mongolia’s leading exploration company, with operator status First mover potential to develop an industry to create transformational returns for all stakeholders Proven discovery at Heron with near term production in 2022 and nearby infrastructure Significant and low-cost exploration upside

  15. Slide 15: Appendix

    Appendix SECTION TITLE SECTION TITLE SECTION TITLE Petro Petro Matad Matad II Heron Heron field field early early production production 15 15

  16. Slide 16: Leap Energy CPR

    Leap Energy CPR • Petro Matad commissioned Leap Energy to perform a Competent Persons Report on the Heron and Gazelle discovered accumulations and remaining prospectivity in the northern Block XX. in February 2020. • Completed in February 2020, the reported oil-in-place (STOIIP) and resources are be

Petro Matad — Investor Presentation (August 2021) on 6ix