Boardwalk Pipeline Partners LP

Boardwalk Pipeline Partners LP — Corporate Update (October 2011)

9 slides from Boardwalk Pipeline Partners LP's corporate update, Oct 17, 2011

  1. Slide 1: Recent Growth Projects

    Exhibit 99.2 October 17, 2011 Conference Call Recent Growth Projects Stanley C. Horton, President & Chief Executive Officer 1

  2. Slide 2: Important Information

    Important Information Forward-looking statements disclosure Statements made at this conference or in the materials distributed in conjunction with this conference that contain "forward-looking statements" include, but are not limited to, statements using the words “believe”, “expect”, “plan”, “inten

  3. Slide 3: Boardwalk's Growth Strategy

    Boardwalk’s Growth Strategy § Pipelines and Storage will remain our Core Business § Attach to new supply sources § Expand existing and add new market outlets § Continue to enhance optionality for our customers § Offer greater array of services to our producer customers - Boardwalk Field Services § G

  4. Slide 4: BWP and BPHC to form Joint Venture

    BWP and BPHC to form Joint Venture § Joint venture to acquire Petal and Hattiesburg for $550million § $200 million5-year bank debt § $70 million equity BWP (20% interest) § $280 million equity BPHC (80% interest) a wholly- owned subsidiary of Loews Corporation § Boardwalk subsidiary will operate the

  5. Slide 5: Joint Venture and BWP Footprint

    Joint Venture and BWP Footprint Petal and Hattiesburg: § High deliverability salt dome gas storage with long-term fixed-fee contracts § Seven operating caverns with approximately 19 Bcf of working gas capacity § Interconnects with several major natural gas pipelines, including Gulf South § Approxima

  6. Slide 6: Petal and Hattiesburg Asset Strength

    Petal and Hattiesburg Asset Strength § Fixed-fee long-term agreements § Operating caverns are fully subscribed with a weighted-average remaining contract life of approximately seven years § Customer base primarily utilities § Approximately 80% electric or gas utilities § Weighted average credit rati

  7. Slide 7: Facilities are in a Desirable Location

    Facilities are in a Desirable Location East West Producing Southeast Region Minimal Storage Facilities Located in Southeast Region Petal & Hattiesburg Storage Fields Source: EIA, December 2010 6

  8. Slide 8: Regional Natural Gas Demand

    Regional Natural Gas Demand All demand is Bcf/d. % represents 2010 - 2020 growth By 2020, Southeast natural gas demand is estimated to increase by approximately 5 Bcf/d, mostly due to growth in power generation sector. Source: INGAA Foundation/ICF Study - North American Infrastructure Through 2035 7

  9. Slide 9: Boardwalk Field Services Projects

    Boardwalk Field Services Projects Marcellus Gathering Pipeline § Estimated cost of $90 million § Delivery capacity of 275,000 Dth/day when fully constructed § Project anchored with a 15-year fee-based agreement with Southwestern § 26 miles of 12” high pressure gas pipeline § Interconnects with Tenne

Boardwalk Pipeline Partners — Corporate Update (October 2011) on 6ix