Stillwater Mining — Merger or Acquisition (February 2017)
46 slides from Stillwater Mining's merger presentation, Feb 3, 2017
Slide 1: Disclaimer: Additional Information and Where to Find It
Disclaimer Additional Information and Where to Find It This presentation does not constitute the solicitation of any vote, proxy or approval. In connection with the proposed transaction, Sibanye Gold (“Sibanye”) intends to post to its shareholders a JSE Limited (“JSE”) Category 1 circular subject to
Slide 2: Disclaimer: Additional Information and Where to Find It
CED S274 ‘Akio ieormation and Where lo Find {i grenrton does nol cone fhe soko any vole pon approval a conection wit propre hers Soe Gl bane" lech opt fo ral Unlod is Catogery 1 cre sac to he ror ce cxcarby he IE ond Star hang Conpony (Swoosh is Sci and change Coon he") tmovart motu tang 2 pon Bolam
Slide 3: Our core purpose
Our core purpose SIBANYE’S MINING IMPROVES LIVES SIBANYE’S MINING IMPROVES LIVES
Slide 4: Our vision
Our vision SUPERIOR VALUE CREATION FOR ALL OUR STAKEHOLDERS Through mining our multi-commodity resources in a safe and healthy environment Sibanye cares 5
Slide 5: Industry leading relative dividend yield
Industry leading relative dividend yield Current dividend yield (last twelve months (LTM) dividends paid) 1 Source: Factset and company filings. Market data as of 30 January 2017 Note: 1. Dividend yield calculated using actual dividend paid and average share price for the period, since public listin
Slide 6: Value creation focus
Value creation focus Continue to drive operational excellence on existing asset base A proven operating model Robust cash flow Strong balance sheet Investing in organic growth projects in the Gold Division Growth through value accretive transactions – PGM sector a logical step Aquarius acquisition (
Slide 7: Expanding PGM platform at attractive point in cycle
Expanding PGM platform at attractive point in cycle Source: HSBC research - size of bubble represents resource size Rustenburg transaction: structured to minimise risk Relatively low capital outlay upfront Downside protection until 2019 Future payments ring-fenced to assets – upside and downside ris
Slide 8: Track record of strong integration to drive value accretion
Track record of strong integration to drive value accretion Aquarius integration concluded - production excellence maintained Rustenburg transaction closed as of 1 November 2016 Positive interaction with management, employees and community Workforce motivated and enthused about new opportunities Pro
Slide 9: Operating update for six months ended December 2016
Operating update For six months ended 31 December 2016 Gold production of 763,000oz in line with H1 2016 average underground gold grade 4% higher y-o-y Gold AISC 1.7% lower than forecast at R452,000/kg Growth capital being reviewed due to current USD/ZAR strength Solid performance from Platinum Divi
Slide 10: Operating update for six months ended December 2016
Operating update For six months ended 31 December 2016 Sibanye * Gold production of 763,0000z in line with H1 2016 average underground gold grade 4% higher y-o-y * Gold AISC 1.7% lower than forecast at R452,000/kg * Growth capital being reviewed due to current USD/ZAR strength * Solid performance fr
Slide 11: Our PGM view is positive over the long-term
Our PGM view is positive over the long-term Despite near-term headwinds, long-term fundamentals remain robust Source: Johnson Matthey, WPIC, broker consensus estimates Note: 1. Price forecasts in real terms Platinum: net market balance (koz) vs. price¹ Palladium: net market balance (koz) vs. price¹
Slide 12: Transaction summary
Transaction summary Consideration $18.00 per share in cash, or $2.2bn for all outstanding common stock of Stillwater 23% premium to prior day close; 20% premium to 20-day VWAP as of 8 December Financing: $2.7bn bridge financing from Citi and HSBC Conditions precedent for the Transaction Sibanye shar
Slide 13: Expected transaction timeline
Expected transaction timeline Transaction timeline 9 December 2016: Transaction announcement Conditions precedent satisfied, or waived, including regulatory approvals Proxy / circular dispatched to Sibanye and Stillwater shareholders Sibanye and Stillwater shareholder meetings held to approve transa
Slide 14: Expected transaction timeline
Expected transaction timeline Sibanye Transaction timeline 9 December 2016: Transaction announcement Conditions precedent satisfied, or waived, including regulatory approvals Proxy / circular dispatched to Sibanye and Stillwater shareholders THY 2017 Sibanye and Stilwater shareholder meetings held t
Slide 15: Portfolio of low cost assets with growth potential
Portfolio of low cost assets with growth potential Stillwater Mining Company Headquarters: Colorado, USA Employees: c.1,400 Trading: NYSE (SWC) 2015 Revenue: $726m 2015 Operating cash flow: $110m Source: Company filings Notes: Based on Stillwater guidance and approximate production split year to dat
Slide 16: Stillwater Mine geographic location
Stillwater Mine 90 89 212 310 191 89 Livingston Big Timber McLeod NYE Fishtail Red Lodge Absarokee Columbus Laurel Billings Sweet Grass Park Carbon Big Horn Boulder River Yellowstone River Yellowstone River E. Boulder River Stillwater River Bear Tooth Mountain Range 298 420 419 78 72 Yellowstone Eas
Slide 17: Metallurgical complex overview
Metallurgical complex overview Geographic location Quarterly recycling volumes (PGM recycled ounces fed) 90 89 212 310 191 89 Livingston Big Timber McLeod NYE Fishtail Red Lodge Absarokee Columbus Laurel Billings Sweet Grass Stillwater Park Carbon Big Horn Boulder River Yellowstone River Yellowstone
Slide 18: Metallurgical complex overview
Metallurgical complex overview * Smelter and base metal refinery located in Montana * Processes mined and recycled materials * Provides unique insight into secondary market * Becoming fully integrated mine-to-market * Includes processing & sampling facility with assay lab + Expansion potential with
Slide 19: Strong transaction rationale
Strong transaction rationale Value accretive, per detailed management due diligence Positioning the Platinum Division further down the global cost curve, with potential for further cost reductions Enhancing cash flow generation to sustain industry-leading dividend Improving access to lower-cost glob
Slide 20: Building a premier global gold and PGM mining company
Building a premier global gold and PGM mining company 2015A Palladium Production (moz) 2015A 4E Production1 (moz) Source: Company filings Notes: Platinum, palladium, rhodium and gold (together referred to as 3E+Au or 4E). Stillwater data on a 2E basis Exclusive of Rustenburg Mine Includes PGM by-pro
Slide 21: Quality growth and sustainability
Quality growth and sustainability Expected Gold and PGM LoM production plan (next 20 years) Source: Company guidance ounces Gold Fields plan Complementary gold and PGM production profiles 22 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 2017 2018 2019 2020 2021 2022
Slide 22: World class assets in an attractive mining jurisdiction
World class assets in an attractive mining jurisdiction High grade (20g/t), palladium biased (78% palladium), long life (+25 years), low-cost(>$500/2E oz), mechanised, operations Near term, organic and low-cost growth through the Blitz Project A mine-to-market PGM business Large PGM recycling busine
Slide 23: Stillwater assets high-grade and long-life
Stillwater assets high-grade and long-life Source: Company filings. LoM as stated in company annual reports PGM Assets by Reserve Grade and LoM (based on published reserves) East Boulder Stillwater Mine Rustenburg Mimosa Blitz Kroondal Stillwater’s portfolio is long-life and significantly higher gra
Slide 24: Low-cost assets: cost reduction drivers
Cost reduction drivers; No exchange rate benefits Increased mechanisation Further infrastructure development Improved safety and productivity Staffing reorganization Supplier negotiations Low-cost assets Stillwater All-in-Sustaining costs (“AISC”)1 and realised prices ($/oz) c.25% AISC improvement M
Slide 25: Moving Sibanye Platinum down the cost curve
Moving Sibanye Platinum down the cost curve Source: Nedbank Research, Company filings Global PGM Cash cost + Capex curve (CY16E - At spot) Pro-forma Moves Sibanye down the PGM cost curve Further benefits from realisation of synergies between Rustenburg and Kroondal Stillwater’s low-cost position exp
Slide 26: Strong culture fit
Strong culture fit Employees and safety Focus on proactive safety and health systems to reduce loss and promote improvement Environmental excellence State-of-the-art systems and treatment facilities Strive to exceed environmental standards Signatory to a voluntary Good Neighbour Agreement with local
Slide 27: Value analysis and financing plan
Value analysis and financing plan
Slide 28: NAV accretive
NAV accretive Broker target share price for Stillwater vs. Offer price Offer Price Average Sibanye diligence suggests NAV opportunity beyond the average broker target price Source: Broker research, FactSet, Bloomberg Note: 1. Includes growth projects and assumes sustained operational efficiencies ¹
Slide 29: Accretive transaction at favourable point in cycle
Accretive transaction at favourable point in cycle The Transaction is expected to be accretive to cash flow per share following the ramp up of the Blitz Project Blitz Project under development, ramping up to expected steady state production of 270,000oz – 330,000oz by 2021 / 2022 Increase in low cos
Slide 30: Positions Sibanye shareholders for a potential re-rating
Include Royal Bafokeng, Northam, Amplats, Impala Include Agnico-Eagle, Newcrest, Newmont, Goldcorp, Barrick, Yamana and Kinross Positions Sibanye shareholders for a potential re-rating Source: Factset and Broker research. Market data as of 30 January 2017 Notes: 2015 Production for Stillwater (2E),
Slide 31: Acquisition funding with equity raise
Acquisition funding with equity raise Sibanye’s will have concluded c.$2.8bn of acquisitions (including Stillwater) in relation to its PGM strategy since 2015 – all cash funded Acquired Aquarius Platinum for $294m (2016) Acquired Rustenburg Operations for $326m (2016) Announced acquisition of Stillw
Slide 32: Rights offering supports capital structure flexibility
Rights offering supports capital structure flexibility Net Debt1 / Last twelve months (LTM) EBITDA1 Source: Company filings, FactSet Note: Yamana, Goldcorp, Barrick, Newmont, Kinross, Agnico-Eagle, Acacia and Randgold LTM as of 30 September 2016. AngloGold, Newcrest, Gold Fields, Sibanye and Harmony
Slide 33: Transaction progress has been positive to date
Transaction Progress Has Been Positive To-Date Positive interaction with Stillwater workforce and key stakeholders immediately post-announcement Investor feedback during roadshows indicated general support and a preference for minimal financial gearing as a result of the Transaction US anti-trust co
Slide 34: Transaction progress has been positive to date
Transaction Progress Has Been Positive To-Date Sibanye Positive interaction with Stillwater workforce and key stakeholders immediately post-announcement Investor feedback during roadshows indicated general support and a preference for minimal financial gearing as a result of the Transaction US anti-
Slide 35: Key takeaways
Key takeaways Transaction complements Sibanye’s strategic vision of creating a premier global gold and PGM mining company Enhances the asset base - becoming a globally competitive South African mining champion Being value accretive, per detailed management due diligence Sibanye well positioned to ta
Slide 36: Conclusion
Conclusion “We believe that this is a transformative transaction at a positive time in the cycle. With world-class operating assets and resource base, we are creating a cash-generative, globally competitive, South African mining champion” - Neal Froneman, CEO of Sibanye Creating a premier, global pr
Slide 37: Conclusion
CED S2rv- “We believe that this is a transformative transaction at a positive time in the cycle. With world-class operating assets and resource base, we are creating a cash-generative, globally competitive, South African mining champion” - Neal Froneman, CEO of Sibanye Creating a premier, global pre
Slide 38: Questions
Sibanye we are one Questions
Slide 39: Stillwater financials
Stillwater financials Source: Company filings Note: 1. Other includes: Losses on trade receivable and inventory purchases, (Gain) / loss on disposal of PP&E, Loss on long-term investments, Impairment of PP&E and non-producing mineral properties, Exploration, Proxy contest, Accelerated equity based c
Slide 40: Stillwater mine
Stillwater mine Ownership 100% Stillwater Location J-M Reef, Montana Mining Statistics Status: Producing Mine type: Underground Initial production: 1986 2016E PGM production: 330 koz1 2015A PGM production: 320 koz 9m 2016 PGM cash cost: $428/oz (-16% y-on-y) 2015 same period: $507/oz Est. mine life:
Slide 41: East Boulder mine
East Boulder mine Ownership 100% Stillwater Location J-M Reef, Montana Mining Statistics Status: Producing Mine type: Underground Initial production: 2002 2016E PGM production: 210 koz1 2015A PGM production: 201 koz 9m 2016 PGM cash cost: $441/oz (-15% y-on-y) 2015 same period: $517/oz Est. mine lif
Slide 42: Blitz project
Blitz project Asset overview Mine site overview Ownership 100% Stillwater Location Beartooth Mountains, Montana Mining Statistics Status Development Mine type: Underground Est. first production: Early 2018 Production target: 270 – 330 koz 2E Total capital spend: $250 million Capital spend remaining:
Slide 43: Stillwater PGM reserves
Stillwater PGM reserves Source: Company filings Note: 1 Imperial (short tons) converted to metric (long tonnes) Stillwater Mine East Boulder Mine Total Montana Mines Ore Tonnes1 Avg. Grade Cont. Ounces Ore Tonnes Avg. Grade Cont. Ounces Ore Tonnes1 Avg. Grade Cont. Ounces (000's) (g/t) (000's) (000'
Slide 44: Near-term, low-cost growth
Near-term, low-cost growth Gold equivalent production1 (koz) Blitz continues the Sibanye strategy of growth via quality assets with attractive returns Source: Company filings Notes: Au-eq production figures for Rustenburg, Aquarius and Stillwater calculated using 2015 average prices for illustration
Slide 45: Definitions
Definitions Stillwater AISC*: All-In Sustaining Costs (Non-GAAP): This non-GAAP financial measure is used as an indicator from period to period of the level of total cash required by the company to maintain and operate the existing mines, including corporate administrative costs and replacement capi
Slide 46: Definitions
Sibanye Stilwater AISC" + AllinSustoining Costs (Non-GAAP): Thisnon-GAAP financial measure is used as an indicater trom period to period of the levelof totalcash required by the company to maintain and operate the existing mines, including corporate administrative costs and replacement capital. The
Stillwater Mining — Merger or Acquisition (February 2017) on 6ix