Bellevue Gold Limited · ASX:BGL

Bellevue Gold — Investor Presentation (February 2025)

26 slides from Bellevue Gold's investor presentation, Feb 10, 2025

  1. Slide 1: Corporate Presentation: Real growth from a high-grade WA asset

    For personal use only Corporate Presentation Real growth from a high-grade WA asset February 2025

  2. Slide 2: Disclaimers & Compliance Statements

    Disclaimers & Compliance Statements This presentation has been prepared by Bellevue Gold Limited (ABN 99 110 439 686) (Company or Bellevue) (ASX: BGL) and is authorised by the Managing Director & Chief Executive Officer of Bellevue. DISCLAIMER This presentation has been prepared by the Company based

  3. Slide 3: Disclaimers & Compliance Statements (cont)

    Disclaimers & Compliance Statements (cont) Forward-looking All-In-Sustaining Cost estimates have been prepared on a real basis at a project level (i.e. not adjusted for possible future inflation and do not include the effects of corporate costs) and assume an H2 FY25 gold price of A$4,150/oz of gold

  4. Slide 4: Disclaimers & Compliance Statements (cont)

    Disclaimers & Compliance Statements (cont) EXPLORATION TARGET This presentation refers to the following Exploration Target based on the southern plunge extent of the Bellevue Lode system to 800m of depth: Tonnes Grade Ounces 4-10MT 8-10 g/t gold 1.5-2.5Moz For personal use only The potential quantit

  5. Slide 5: West Australian high-grade gold producer

    West Australian high-grade gold producer Underground mining ramp up nearing completion at a major gold operation in one of the world’s great gold producing regions Significant gold producer For personal use only Targeting >200koz per annum from June 2025 quarter1 Simple business: single mine operati

  6. Slide 6: H2 FY25 Focus - final stages of project ramp-up

    H2 FY25 Focus- final stages of project ramp-up Underground mining ramp-up key to achieve increased production rate Successful project delivery ✓ Underground ramp-up to set platform for growth For personal use only Successfully delivered the project from discovery to Transition to underground only or

  7. Slide 7: Profitability combined with a derisked balance sheet

    Profitability combined with a derisked balance sheet Operational leverage, increasing grade and sunk capital provides platform for strong free cash flow generation Strong balance sheet to support production growth Hedge commitments For personal use only ▪ 31 Dec 24 liquidity of $81m ▪ 13% of Reserve

  8. Slide 8: Production growth of +50% by FY28 in a Tier 1 mining district

    Production growth of +50% by FY28 in a Tier 1 mining district Bellevue to become the only pureplay 200koz2 pa+ gold producer with >5g/t gold head grade in Tier 1 jurisdiction Tier 1 gold deposits with >200koz production & 5g/t Au head grade1,2 Bellevue production For personal use only 500 growth2 Ta

  9. Slide 9: December Quarter production highlights

    December Quarter production highlights Infrastructure upgrades and fully mobilised mining fleet sets the platform for increase in production Processing Mining Production & Guidance Consistently operating at 1.0-1.2Mtpa >1Mtpa Achieved month Dec 24 Q2 FY25: 26,230oz sold @ project AISC A$2,765/oz For

  10. Slide 10: Operational improvements delivering increased productivity

    Operational improvements delivering increased productivity Productivity gains against an improving grade outlook For personal use only ▪ Fleet fully mobilised to site – 6 jumbos and all associated equipment ▪ Key mining parameters in line with expectations: reconciliation, stope dilution, productivi

  11. Slide 11: Investment in infill grade control drilling

    Investment in infill grade control drilling Grade control drilling underpins guidance and growth plans +820k metres of diamond drilling For personal use only Marceline Paris Portal MiningArea 1.8m @ 123.3 g/t gold 1.9m @ 85.1 g/t gold 3.1m @ 21.8 g/t gold TribuneMining 2.2m @ 19.4 g/t gold Area 2.7m

  12. Slide 12: H2 FY25 mine schedule returns to high-grade areas

    H2 FY25 mine schedule returns to high-grade areas Deacon Main continues in high grade Void model North Drill piercement gram metres 2H 25FY Schedule +10 gm For personal use only +25 gm +50 gm +100 gm 2.9m @ 64.5 g/t 1.9m @ 61.7 g/t 4.6m @ 24.7 g/t 1.4m @ 42.8 g/t 3.2m @ 17.5 g/t 1.5m @ 64.4 g/t 1.6m

  13. Slide 13: H2 FY25 mine schedule returns to high-grade areas

    H2 FY25 mine schedule returns to high-grade areas Dec 24 Bellevue 1000 Bellevue South moves to Deacon Main analogue North For personal use only 66.4 g/t 35.2 g/t 4.4m @ 12.5 g/t 1.5m @ 89.8 g/t 1.9m @ 28.1 g/t 3.2m @ 15.9 g/t 3.6m @ 41.2 g/t 6.9m @ 18.0 g/t 4.0m @ 35.6 g/t 5.0m @ 39.5 g/t 1.9m @ 99.

  14. Slide 14: H2 FY25 mine schedule returns to high-grade areas

    H2 FY25 mine schedule returns to high-grade areas Armand returns to high grade Dec 24 Armand 1176 3.7m @ 36.0 g/t 5.5m @ 37.1 g/t North Drill piercement gram metres For personal use only +10 gm +25 gm +50 gm +100 gm Void model 2H 25FY Schedule 2.5m @ 82.4 g/t 2.7m @ 63.4 g/t 4.1m @ 53.1 g/t 6.1m @ 2

  15. Slide 15: H2 FY25 mine schedule returns to high-grade areas

    H2 FY25 mine schedule returns to high-grade areas Second portal at Tribune established and now in high-grade development ore, first stoping in Q4 North 7.0m @ 7.8 g/t North 5.0m @ 16.5 g/t 5.0m @ 14.5 g/t 6.0m @ 8.5 g/t 5.0m @ 12.5 g/t 2.0m @ 48.9 g/t 12m @ 12.0 g/t For personal use only 10.0m 14.4g

  16. Slide 16: Planned growth in process capacity to 1.6Mtpa

    Planned growth in process capacity to 1.6Mtpa For personal use only Stage 2 – Stage 1 - Gravity Upgrade Extra Ball Mill Stage 1 - Consistently operating at 1.0-1.2Mtpa Thickener Recovery 94% in Dec 2024 Modifications Upgrades deliver 60% increase in processing capacity from FY25 to FY27 Stage 2 – St

  17. Slide 17: 5 Year Growth Plan to +250koz pa and lower costs

    5 Year Growth Plan to +250koz1 pa and lower costs Investment in Life of Mine infrastructure 300 Multi-year Production & Cost Guidance $2,500 ▪ Facilitates increase in underground ore movement from ~1Mtpa in FY25 to 1.6Mtpa in FY27 $2,300 ▪ Allows increase in processing capacity from 1.0Mtpa to ~1.6M

  18. Slide 18: Vrify 3D presentation

    Vrify 3D presentation – play here For personal use only 18 https://vrify.com/decks/16463

  19. Slide 19: Investing now for the future

    Investing now for the future Benefits of investing in life of mine infrastructure in FY25-FY26 ▪ Investment across FY25-FY26 will create life of mine platform to be a +250koz1 pa producer ▪ Drives a cost benefit from increased economies of scale and a decrease in project AISC For personal use only ▪

  20. Slide 20: Exploiting the competitive exploration advantage

    Exploiting the competitive exploration advantage ▪ FY25-FY26 - decline development opens up a major ~1.5-2.5Moz at 8-10 g/t gold Exploration Target1 to the south covering down plunge extent of ore system ▪ Current MRE 3.2Moz covers 2.8km of strike 2 - new drill platforms covering an extra ~50% untes

  21. Slide 21: System remains OPEN for repeat discovery

    System remains OPEN for repeat discovery Bellevue System remains open at depth Shear 1.4Moz For personal use only ▪ Parallel structure at depth in deep EIS funded drilling Deacon Shear ▪ 1.6m @ 9.3 g/t gold and 1.2m @ 9.0 g/t gold structure at depth 1.5Moz ▪ Viago analogue targets at Lucien remain r

  22. Slide 22: Deacon Main

    Deacon Main 4.4m @ 62.4 g/t gold (DRDD218) 14.7g/t 98.7g/t shoot is Deacon Main - 129.8g/t 104.3g/t Multiple analogous “Bellevue shoots across lode 90.4g/t 4.4m @ 64.4 g/t gold 21.4g/t 76.7g/t style” 4.3m @ 55.2 g/t gold For personal use only 1.5m @ 168.8 g/t gold 33.4g/t 4.9g/t 4.3m @ 55.2 g/t gold

  23. Slide 23: Exploration to underpin Resource growth

    Exploration to underpin Resource growth Project continues to grow – following successful commissioning and ramp up exploration spend to add low-cost ounces to mining inventory Mineral Resource over time (Moz) 1.5-2.5Moz For personal use only Successful commissioning and ramp up Resource Mineral Reso

  24. Slide 24: Sustainability is core to Bellevue's vision and purpose

    Sustainability is core to Bellevue’s vision and purpose Bellevue set to achieve net-zero greenhouse gas emissions by CY26 Renewable Energy ▪ 90 MW hybrid power station consisting of: 24 MW wind, 27 MW solar, 24 For personal use only MW thermal and 15 MW/ 29 MWh Battery Energy Storage Solution (BESS)

  25. Slide 25: Investment Highlights

    Investment Highlights For personal use only Exceptional Production Experienced Fully funded Exploration asset growth management for growth upside Bellevue forecast to 5 Year Growth plan Experienced Balance sheet Underground be the only delivers production management team optimised and de- developmen

  26. Slide 26: Peer comparison data

    Peer comparison data Production Grade AISC2 Basis of data Source Document koz g/t A$/oz X Peers1 For personal use only Agnew/Lawlers 245 5.7 1,761 CY23A Gold Fields 2023 Annual Financial Report, released on 28 March 2024 Granny Smith 284 5.0 1,610 CY23A Gold Fields 2023 Annual Financial Report, rele

Bellevue Gold — Investor Presentation (February 2025) on 6ix