  1. Slide 1: A growing, low-cost gold producer in the Philippines

    For personal use only A growing, low-cost gold producer in the Philippines Investor Presentation and Company Update – October 2015 Mark Williams, Managing Director and Joe Mobilia, Chief Financial Officer ASX Code: RED

  2. Slide 2: Presentation Overview: 5 Key Pillars

    Presentation Overview: 5 Key Pillars ASX-listed gold producer operating in the Philippines For personal use only 1. Low-cost production from open pit operations at Siana – Forecast to produce 181,000oz at AISC of US$740-790/oz from July 2015 – Open pit JORC 2012 resources of 490,000oz (2.6g/t Au), r

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Unhedged and debt-free ASX-listed gold producer operating in the Philippines For personal use only ASX Code RED Directors and Management Share price (as at 23 October 2015) A$0.075 Kevin Dundo – Chairman Issued shares 759.5M Mark Williams – Managing Director Market capitalisation

  4. Slide 4: Siana Gold Project – Location

    Siana Gold Project – Location Located in a highly prospective and well-established mining region For personal use only 4

  5. Slide 5: Low-cost open pit production

    Low-cost open pit production Forecast to produce 181,000oz at AISC of US$740-790/oz For personal use only 1.  Revised open pit mining strategy completed in Low cost open pit September 2015 following a comprehensive Technical production Review 2. Underground  Updated mining strategy includes modifi

  6. Slide 6: Open Pit Mining Schedule and Production Guidance

    Open Pit Mining Schedule and Production Guidance Financial year forecast production profile For personal use only 1. 2015/16 financial year forecast production profile: Low cost open pit Quarter Estimated Au oz production recovered 2. September 2015 quarter (Actual) 17,737 Underground potential Dece

  7. Slide 7: Mining – East Pit Wall Material Movement

    Mining – East Pit Wall Material Movement Rapid and effective response to recent material movement on eastern side of open pit For personal use only 1. Low cost open pit  Significant movement of material occurred in East production pit wall in July 2015 2.  Focused management plan rapidly implement

  8. Slide 8: Siana Gold Project – Revised Mining Strategy

    Siana Gold Project – Revised Mining Strategy Detailed hydrological and geotechnical review underpins new open pit mine schedule For personal use only 1. Low cost  Pit redesign based on independent geotechnical review open pit production 2.  Staged cut-back of the East and West pit Underground wall

  9. Slide 9: Tailings Management System

    Tailings Management System Strong tailings management system For personal use only  Knight Piesold (KP) engaged as Tailings Storage 1. Low cost open pit Facility (TSF) specialist since late 2013 production  Three TSFs either built or upgraded under the 2. Underground construction management of KP

  10. Slide 10: Opportunity to transition to long-term underground mine

    Siana – Opportunity to transition to long-term underground mine A blueprint to deliver future growth at Siana For personal use only • Original Underground Feasibility Study 1. Low cost completed in 2009 open pit production • Underground Technical Review commenced in 2015, utilising Mining One 2. Und

  11. Slide 11: Opportunity to transition to long-term underground mine

    Siana – Opportunity to transition to long-term underground mine A blueprint to deliver future growth at Siana For personal use only 1. Low cost open pit Pre-Feasibility Study will assess the preferred mining methods using conventional production jumbo drill-and-blast for tunnel development and stopi

  12. Slide 12: The Future – Exploration and Growth

    The Future – Exploration and Growth Surigao del Norte – one of the most mineralised provinces in one of the most mineralised countries globally For personal use only 1. • Exploration plans and targets identified Low cost open pit • Preparations underway for increased near- production mine and region

  13. Slide 13: Mapawa Project

    Mapawa Project Maiden resource paves the way for Scoping Study; longer term exploration upside For personal use only 1. Low cost  20km north of Siana open pit production  JORC 2012 Indicated and Inferred Mineral Resource for LSY deposit of 2. Underground 8.8Mt @ 1.0g/t Au for 289,000oz potential 

  14. Slide 14: Mapawa Project

    Mapawa Project Maiden resource paves the way for Scoping Study; longer term exploration upside For personal use only 1. Low cost  Planned Scoping Study to assess medium open pit term potential to mine higher grade ore production from Mapawa to provide incremental mill 2. feed to the Siana Gold Proj

  15. Slide 15: Processing Plant

    Processing Plant Only modern operating gold plant in a highly endowed world-class mining region For personal use only 1. Low cost  Modern 1.1Mtpa gravity and carbon-in-leach (CIL) open pit processing facility production  Originally constructed in 2011 – total CAPEX of US$53M 2. Underground potenti

  16. Slide 16: Management Track Record – Recent Achievements

    Management Track Record – Recent Achievements Realising our potential at Siana and beyond For personal use only 1.  Construction of new tailings storage  Gold produced has exceeded forecast in all Low cost open pit facility and modifications to existing TSF’s Quarters in 2015 production completed

  17. Slide 17: EV/Reserve and EV/Resource vs ASX-listed peers

    17 For personal use only EV/Reserve (A$/oz) EV/Resource (A$/oz) $100 $150 $200 $0 $50 $100 $200 $300 $400 $500 $600 $700 $0 Northern Star $961 Evolution $188 Evolution $463 PanTerra $164 Regis Northern Star $161 $427 Regis $113 Troy $289 Doray $107 Alkane $280 Alkane $100 Aurelia $248 St Barbara $87

  18. Slide 18: Presentation Overview: Key Pillars

    Presentation Overview: 5 Key Pillars ASX-listed gold producer operating in the Philippines For personal use only 1. Low-cost production from open pit operations at Siana – Forecast to produce 181,000oz at AISC of US$740-790/oz from July 2015 Open pit JORC 2012 resources of 490,000oz (2.6g/t Au), res

  19. Slide 19: Disclaimer and Competent Person’s Statement

    Disclaimer and Competent Person’s Statement For personal use only Competent Person’s Statement for JORC 2012 Mineral Resource and Ore Reserve This information was prepared and first disclosed under the JORC Code 2004. It has The information in this report that relates to Mineral Resources and Ore Re

  20. Slide 20: Disclaimer and Competent Person’s Statement

    Disclaimer and Competent Person’s Statement For personal use only Mineral Resource and Ore Reserve – Siana Underground Forward-Looking Statements This information was prepared and first disclosed under the JORC Code 2004. It has Certain statements made during or in connection with this statement con

  21. Slide 21: Thank you

    For personal use only Thank you Mark Williams (Managing Director) Australia Philippines Kevin Dundo (Chairman) Red 5 Limited Greenstone Resources Corporation Level 2, 35 Ventnor Avenue Level 5, NOL Tower Web: www.red5limited.com West Perth, Western Australia 6005 Commerce Ave E-mail: info@red5limite

Red 5 — Investor Presentation (October 2015) on 6ix