Stronghold Digital Mining — Q3 2023 Earnings Presentation
31 slides from Stronghold Digital Mining's earnings presentation, Nov 14, 2023
Slide 1: Carbon Capture Initiative and Q3 2023 Earnings
Carbon Capture Initiative and Q3 2023 Earnings November 2023
Slide 2: Disclaimer
Disclaimer 2 Forward-Looking Statements The information, financial projections and other estimates contained herein contain forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, and future guidance with respect to the anticipated future performance of
Slide 3: Stronghold at a Glance
Stronghold at a Glance The only environmentally beneficial and vertically integrated public Bitcoin mining company Note: all data as of 11/10/23 unless otherwise noted; all figures approximated NASDAQ Ticker Symbol SDIG Share Price $3.89 Bitcoin Mined (Q3 2023) ~620 Deployed Hash Rate Capacity 4.0 E
Slide 4: 1. Assumes a $0.075 hash price (see Appendix for information about hash price and
1. Assumes a $0.075 hash price (see Appendix for information about hash price and how it is calculated), $42.50/MWh cost of power, and 34 J/T average miner efficiency Developed first-generation direct air capture (“DAC”) technology with partners to facilitate carbonation, with initial unit deployed
Slide 5: Stronghold Carbon Capture
@ Stronghold Carbon Capture STRONGHOLD
Slide 6: The New Carbon Market
The New Carbon Market Private markets and the federal government have developed significant incentives for those who capture carbon and/or reduce carbon emissions Projects that capture carbon are eligible to sell carbon credits and may be suitable to receive 45Q tax credits 1. See: “The Inflation Re
Slide 7: Stronghold's Beneficial Use Ash Can Capture Carbon
Stronghold’s Beneficial Use Ash Can Capture Carbon Financially Transformative Potential to drive up to ~$30mm of incremental annual EBITDA and reduce Stronghold’s net cost of power to as low as ~$16/MWh 2 Low Technology Risk Carbon capture process is largely a combination of basic chemistry and airf
Slide 8: Our Business Model
Stronghold owns two circulating fluidized bed (“CFB”) mining waste reclamation and power generation facilities: Scrubgrass (~85 MW of net output capacity) Panther Creek (~80 MW of net output capacity) Carbon County Venango County Our Business Model Partner with PA DEP to reclaim land, and generate p
Slide 9: Greenhouse gas emissions benefits of coal refuse reclamation
See: Romero, Carlos (Dr). “Comparison of the Impact on Greenhouse Gas Emissions Between Unabated Coal Refuse Piles and Reclamation-to-Energy Power Plants.” Energy Research Center, Lehigh University, 23 Jan. 2023, p. 3, https://strongholddigitalmining.com/wp-content/uploads/2023/11/Lehigh-University-
Slide 10: Introducing Stronghold Carbon Capture
Introducing Stronghold Carbon Capture Worked with construction, design, and engineering partners to develop direct air capture (“DAC”) technology that utilizes the stack effect to drive air through ash First DAC unit installed at Scrubgrass on Nov. 10th Third-party lab results over last 4 months, ut
Slide 11: Carbon capture development milestones and partners
Engaged CO2 mineralization expert Karbonetiq in June 2023 to explore carbon capture opportunities with our ash Conducted numerous third-party lab tests with ash from Scrubgrass – results demonstrate that ash can capture up to 12% of its weight in CO2 from ambient air Designed KarbolithTM direct air
Slide 12: Process Expected to Dramatically Increase CO2 Removals
Process Expected to Dramatically Increase CO2 Removals Ash may release CO2 in the remote event that it is exposed to extreme heat (1,500 degrees Fahrenheit) or hydrochloric acid Design subject to change based on results from initial units; contemplating larger structure (up to ~50 feet) to evaluate
Slide 13: Potential to Be Among World's Largest DAC Projects
Implies up to ~100k tons of CO2 captured per year Potential to Be Among World’s Largest DAC Projects & The Largest Announced U.S. DAC Project Operational Before 2025 1 See: CCUS Projects Explorer. IEA, 2023, https://www.iea.org/data-and-statistics/data-tools/ccus-projects-explorer Tons produced by S
Slide 14: Carbon Capture Represents a Compelling Value Proposition
Carbon Capture Represents a Compelling Value Proposition Assumes 10% of carbon credit proceeds and 5% of 45Q tax credit proceeds paid out in the form of fees and royalties, annual fixed opex of $1.5mm, and variable opex of $30 per ton of CO2 captured; see Disclaimer page for details and risks associ
Slide 15: Significant Potential Benefit to Stronghold's Net Cost of Power
Significant Potential Benefit to Stronghold’s Net Cost of Power We are exploring our ability to qualify for 45Q tax credits; see Disclaimer page for details and risks associated with 45Q Assumes 10% of carbon credit proceeds and 5% of 45Q tax credit proceeds paid out for fees and royalties, annual f
Slide 16: Compelling Cost of Power Compared to Bitcoin Mining Peers
$0 $5,000 $10,000 $15,000 $20,000 SDIG PF 2 Peer 1 Peer 2 Peer 3 3 Peer 4 SDIG Peer 5 4 Peer 6 Peer 7 Peer 8 Peer 9 Peer 10 Peer 11 Compelling Cost of Power Compared to Bitcoin Mining Peers Q1 2024 estimated costs based on equity research report dated 10/9/23, which assumes network hash rate of 400
Slide 17: Appendix Mining Waste Overview
Appendix Mining Waste Overview 20
Slide 18: Mining Waste: A Widely Ignored Environmental Disaster
Mining Waste A Widely Ignored Environmental Disaster Mining waste is the disregarded byproduct of centuries of coal mining 20 Brought up from underground and left on the surface during mining process, exposing it to the atmosphere and placing it above the water table
Slide 19: Pennsylvania mining waste piles
Pennsylvania mining communities were instrumental in building America There are over 840 toxic mining waste piles in Pennsylvania, and these large mountains of waste pollute the land, water, and air The aftermath: these communities were stripped of their natural resources and jobs and left with this
Slide 20: Over 5,500 miles of waterways impaired
Over 5,500 miles of waterways impaired 1 Acid mine drainage from mining waste piles is among the 2 largest known pollutants of waterways in Pennsylvania 1 Causes rivers to run orange Highly detrimental to aquatic life Problem is severe and widespread and threatens water supply downstream, with all i
Slide 21: Piles spontaneously combust
Piles spontaneously combust through oxidation and lightning strikes Multiple large piles have burned for decades When burning, piles release toxic, uncontrolled emissions into atmosphere: hydrogen sulfide, sulfur dioxide, ammonia, oxides of nitrogen, particulates, carbon monoxide, and CO2 1 Estimate
Slide 22: Mining Waste Reclamation Is the Foundation of Our Business
Mining Waste Reclamation Is the Foundation of Our Business We believe that power generation with CFB facilities is the only practical way to solve Pennsylvania’s toxic mining waste problem, and Stronghold has already reclaimed over 1,050 acres of previously unusable land. Reclamation Process Remove
Slide 23: CFB Power Generation Process
CFB Power Generation Process Using CFB facilities is only way to generate power with low-BTU toxic mining waste Traditional thermal coal has ~12,000 BTU/lb heat content; mining waste has ~5,500 BTU/lb heat content Pushing air through circulating mining waste effectively fluidizes material and enable
Slide 24: Carbon Capture Key Assumptions
Carbon Capture Key Assumptions Tons of CO2 Captured Total ash production of 800-900k metric tons at baseload capacity utilization 8-12% CO2 capture by weight of ash Implies ~60-100k tons of CO2 captured Multiple Income Streams Private Market: $120-200/ton, beginning 2024, reaching capacity in 2025 I
Slide 25: Stronghold
STRONGHOLD
Slide 26: Q3 2023 Results
Q3 2023 Results * Presentation includes non-GAAP financial measures; Adjusted EBITDA references related to third quarter 2023 throughout the presentation should be considered in connection with the Reconciliation of non-GAAP on page 28 Financial Bitcoins Mined 620 Total Revenue (mm) $17.7 Net Loss (
Slide 27: Appendix Other Information
Appendix Other Information 20
Slide 28: Reconciliation of Non-GAAP Items
Reconciliation of Non-GAAP Items 20 Note: Items that round to $0.0 million have been left off as the calculation remains unchanged as presented Reconciliation of Adjusted EBITDA (mm) Q3 2023 Net income (loss) ($22.3) Interest expense 2.4 Depreciation and amortization 9.7 Impairments on equipment dep
Slide 29: Hash Price Calculation
Hash Price Calculation Note: Hash price per daily Bitcoin price and network hash rate calculated from difficulty Note: Bitcoin mining revenue is based on a hash price on $ per terahash per second (“TH/s”) per day. Hash price represents global Bitcoin mining revenue per TH/s of network hash rate, inc
Slide 30: Investor Contact
Investor Contact SDIG@gateway-grp.com Pictured: Actual Reclaimed Mining Waste Site 29
Slide 31: Slide 31
Stronghold Digital Mining — Q3 2023 Earnings Presentation on 6ix