Southern Palladium Ltd. · ASX:SPD

Southern Palladium — 121 Mining Investment London 2026

25 slides from Southern Palladium's conference presentation, November 2026

  1. Slide 1: Southern Palladium - 121 Mining Investment London Presentation

    Slide 1: Southern Palladium - 121 Mining Investment London Presentation

    For personal use only 24 November 2026 Southern Palladium - 121 Mining Investment London Presentation Southern Palladium (ASX:SPD and JSE:SDL), ‘Southern Palladium’ or ‘the Company’) is pleased to provide its 121 Mining Investment London Corproate Presentation. This presentation highlights progress

  2. Slide 2: A major South African mining development in the heart of the Bushveld Complex

    Slide 2: A major South African mining development in the heart of the Bushveld Complex

    rsonal use only ASX: SPD | JSE: SDL A major South African mining development in the heart of the Bushveld Complex Eastern Limb | Bushveld Complex | South Africa Corporate presentation | November 2026

  3. Slide 3: Bengwenyama investment highlights

    Slide 3: Bengwenyama investment highlights

    INVESTMENT CASE Bengwenyama investment highlights Scale, project economics and an increasingly clear pathway to development rsonal use only R E S O U R C E S C AL E U P D AT E D P F S L O N G - L I F E M I N E P L AN 40.25Moz US$1.96bn 33 years Combined Mineral Resource* Post-tax project NPV at 8% r

  4. Slide 4: Strategically located in a world-class PGM district

    Slide 4: Strategically located in a world-class PGM district

    LOCATION Strategically located in a world-class PGM district Bengwenyama lies on the Eastern Limb alongside established mining operations rsonal use only E AS T E R N L I M B A prolific PGM-producing region of the Bushveld Complex; ~72% of global PGM’s E S T AB L I S H E D P R O D U C E R S Nearby I

  5. Slide 5: Scale and grade underpin a 33-year mine plan

    Slide 5: Scale and grade underpin a 33-year mine plan

    SCALE AND GRADE Scale and grade underpin a 33-year mine plan A substantial combined resource base, with UG2 Ore Reserve conversion already demonstrated rsonal use only M I N E R AL R E S O U R C E ORE RESERVE 40.25Moz 6.29Moz Combined Mineral Resource Probable UG2 Ore Reserve UG2 + Merensky 31.72Mt

  6. Slide 6: Current mine plan captures only part of the resource potential

    Slide 6: Current mine plan captures only part of the resource potential

    RESOURCE UPSIDE Current mine plan captures only part of the resource potential Stage 1 and Stage 2 cover a portion of the resource, with potential for mine-life extension rsonal use only C U R R E N T M I N E P L AN Stage 1 and Stage 2 outlines follow the mine plan based on the current Mineral Reser

  7. Slide 7: Modular development provides a pathway to scale

    Slide 7: Modular development provides a pathway to scale

    DEVELOPMENT PLAN Modular development provides a pathway to scale Stage 1 South Decline production followed by Stage 2 expansion via the North Decline rsonal use only S T AG E 1 · S O U T H D E C L I N E S T AG E 2 · S O U T H + N O R T H D E C L I N E S 100ktpm | ~200koz pa 200ktpm | ~420koz pa Stag

  8. Slide 8: Updated PFS more than doubles July 2025 OPFS project value

    Slide 8: Updated PFS more than doubles July 2025 OPFS project value

    UPDATED PFS Updated PFS more than doubles July 2025 OPFS project value The October 2026 update delivers stronger economics on an unchanged mine plan rsonal use only +129% forecast NPV uplift without changing the underlying mine plan 39.1% Post-tax IRR P O S T - T AX P R O J E C T N P V AT 8 % R E AL

  9. Slide 9: Metallurgy and revised assumptions strengthen the economics

    Slide 9: Metallurgy and revised assumptions strengthen the economics

    M ETALLURGY Metallurgy and revised assumptions strengthen the economics Higher chrome recovery and revised market inputs are important drivers of PFS value rsonal use only K E Y M E AS U R E PREVIOUS STUDY U P D AT E D P F S / T E S T W O R K Stronger forecast I M P R O V E D M E T AL L U R G I C AL

  10. Slide 10: Optimised processing delivers two saleable concentrate streams

    Slide 10: Optimised processing delivers two saleable concentrate streams

    PROCESSING Optimised processing delivers two saleable concentrate streams Dense Media Separation (DMS) - coarser primary grinding and staged chromite and PGM recovery rsonal use only 1 DMS pre-concentration Reduces waste to milling 2 Coarser primary grind Preserves chromite recovery 3 Staged flotati

  11. Slide 11: Chrome becomes a substantial co-product

    Slide 11: Chrome becomes a substantial co-product

    CHROME Chrome becomes a substantial co-product The Updated PFS forecasts chromite contributing around 19% of project revenue rsonal use only F O R E C AS T R E V E N U E | U P D ATE D P F S M I X C O N TAI N E D M E TAL | U G 2 6 E P R I L L S P L I T Share of life-of-mine forecast project revenue b

  12. Slide 12: Chrome and base-metal credits strengthen the forecast cost position

    Slide 12: Chrome and base-metal credits strengthen the forecast cost position

    COSTS AND SENSITIVITY Chrome and base-metal credits strengthen the forecast cost position The Updated PFS forecasts a 57% AISC margin including by-products (OPFS: 48%), equivalent to 72% when chrome and base-metal credits are deducted from costs rsonal use only F O R E C AS T AL L - I N S U S T AI N

  13. Slide 13: A staged development strategy with a defined funding requirement

    Slide 13: A staged development strategy with a defined funding requirement

    FUNDING A staged development strategy with a defined funding requirement Forecast post-tax project NPV is almost six times the US$329m peak funding requirement rsonal use only U P D AT E D P F S | 1 0 0 % P R O J E C T B AS I S Forecast post-tax project NPV at 8% real US$1,961m Peak funding requirem

  14. Slide 14: Bengwenyama's peak funding is modest relative to modelled NPV

    Slide 14: Bengwenyama's peak funding is modest relative to modelled NPV

    PEER COM PARISON Bengwenyama’s peak funding is modest relative to modelled NPV An indicative comparison of published peak funding against post-tax project NPV8 across the listed PGM peer group rsonal use only P E AK F U N D I N G AS % O F P O S T - T AX N P V 8 | 1 0 0 % P R O J E C T B AS I S B E N

  15. Slide 15: Bengwenyama against the listed PGM peer group

    Slide 15: Bengwenyama against the listed PGM peer group

    VALUATION Bengwenyama against the listed PGM peer group Bengwenyama is the largest and highest-grade PGM Resource in the peer group, yet remains one of the lowest valued on an EV/resource ounce basis rsonal use only A$100 EV PER ATTRIBUTABLE RESOURCE OUNCE | A$/OZ Logarithmic scale: each major gridl

  16. Slide 16: A genuine partnership with the Bengwenyama community

    Slide 16: A genuine partnership with the Bengwenyama community

    COMMUNITY A genuine partnership with the Bengwenyama community rsonal use only Community participation and long-term engagement are central to development C O M M U N I T Y P AR T N E R S H I P Shared participation. Long-term engagement. Local opportunity. SPD and the Bengwenyama community are partn

  17. Slide 17: Shared ownership - local value

    Slide 17: Shared ownership - local value

    COMMUNITY PARTNERSHIP Shared ownership - local value The Bengwenyama ya-Maswazi community, located in Eerstegeluk and Nooitverwacht farms, Limpopo, is a co-owner of the Bengwenyama PGM-Chrome Project, with participation embedded in the project’s ownership and engagement model. rsonal use only OWNERS

  18. Slide 18: Corporate snapshot

    Slide 18: Corporate snapshot

    CORPORATE Corporate snapshot rsonal use only K EY F AC T S PROJECT OWNERSHIP SH AR E H O L D E R S ( 1 6 O c t o b e r 2 0 2 6 ) Listings Mr Robert N Keith 16.7% Southern Palladium Bengwenyama ASX: SPD | JSE: SDL Limited Community2 Directors, Employees & 12.8% Related Parties Shares on issue at 18 N

  19. Slide 19: Bengwenyama: advancing towards development

    Slide 19: Bengwenyama: advancing towards development

    NEXT STEPS Bengwenyama: advancing towards development Major permitting and study milestones set up the next phase of work. The Board has rsonal use only approved early box-cut and decline development. AUG 2026 Mining Right granted Completed Initial 30-year term Q1 2027 TARGET Definitive Feasibility

  20. Slide 20: Contact us

    Slide 20: Contact us

    Contact us rsonal use only Southern Palladium Limited Johannesburg, South Africa Sydney, Australia Gateview House A3 Level 1, 283 George Street Constantia Office Park Sydney NSW 2000 Weltevreden Park, Roodepoort info@southernpalladium.com www.southernpalladium.com ASX: SPD | JSE: SDL

  21. Slide 21: Disclaimer

    Slide 21: Disclaimer

    Disclaimer The following disclaimer applies to this investor presentation (Presentation). You should read this disclaimer carefully before reading or making any other use of this Presentation or any information contained in this Presentation. By accepting this Presentation, you represent and warrant

  22. Slide 22: Resources and Reserves - Mineral Resource

    Slide 22: Resources and Reserves - Mineral Resource

    Resources and Reserves Bengwenyama Project Combined UG2 and MR Mineral Resource as at 23 October 2024 Tonnes Thickness Pt Pd Rh Au Ir Os Ru 4E 7E Cu Ni Total rsonal use only Reef Resource Category Moz (4E) Moz (7E) Mt (m) (g/t) (%) Moz1 Merensky Indicated 25.11 2.02 1.62 0.64 0.10 0.12 0.03 0.03 0.2

  23. Slide 23: Resources and Reserves - UG2 Ore Reserves

    Slide 23: Resources and Reserves - UG2 Ore Reserves

    Resources and Reserves Bengwenyama Project UG2 Ore Reserves Estimation as at 28 October 2024 rsonal use only Tonnes Pt Pd Rh Au lr Os Ru 4E 6E Cu Ni Cr203 Moz(4E) Moz(6E) Ore Reserve Category Mt (g/t) (g/t) (g/t) (g/t) (g/t) (g/t) (g/t) (g/t) (g/t) (%) (%) (%) Probable 31.72 2.34 2.33 0.48 0.07 0.16

  24. Slide 24: Appendix - EV/OZ calculation

    Slide 24: Appendix - EV/OZ calculation

    Appendix 1 - EV/OZ calculation rsonal use only Southern Palladium's Mineral Resource figures are sourced from the ASX announcement dated 23 October 2024, "Bengwenyama Mineral Resource Update: Total (UG2 & MR) Mineral Resource now 40.25Moz". For this EV/oz comparison, the combined 4E resource of 36.2

  25. Slide 25: JORC and PFS compliance statement

    Slide 25: JORC and PFS compliance statement

    JORC and PFS compliance statement rsonal use only JORC Compliance Statement Updated Prefeasibility Study and Production Target The information in this presentation relating to: The production target and forecast financial information in this presentation are extracted from the ASX Announcement “Sout

Source: ASX announcement, Nov 24, 2026